期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Height Detection and Analysis of Water Flowing Fractured Zone of Coal Face
1
作者 Ziyang Feng 《Computational Water, Energy, and Environmental Engineering》 2021年第4期131-139,共9页
Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zo... Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zone and the layout of mining holes were determined by analyzing the field geological structure</span><span style="font-family:Verdana;">. </span><span style="font-family:Verdana;">It was shown that the fractured zone height and the ratio given by the measured method were 52.33 and 12.46, respectively. By the numerical simulation method with the software of UDEC, the fractured zone height and the ratio were 42.5 and 10.12. By comparison of measured height data and UDEC numerical simulation, there were some differences between the measured height and the calculated results of UDEC numerical simulation method. The method of simulation can be used as the technical basis for the design of waterproof coal pillar in the future.</span> 展开更多
关键词 water flowing fractured zone Height Detection Fracture Mining Ratio Numerical Simulation
下载PDF
Optimum Calculation of Coal Pillars in Inclined Weathered Oxidation Zone
2
作者 Yingbo Zhang Shi Chen 《Energy Engineering》 EI 2021年第3期707-714,共8页
In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hong... In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hongyi Coal Mine,the waterproof coal pillar needs to be wide enough to resist the lateral hydrostatic pressure of the oxidation zone,and to ensure that the top plate aquifer does not run through the water guide crack zone,while also liberating as much stagnant coal as possible.In this paper,the first coal mine face’s waterproof coal pillar was calculated using conventional and optimized calculation methods,taking into account the dip angle of the coal seam,the height of the water-guide crack zone,and the rock shift influence zone,and finally the upper limit of the first face of Hongyi Coal Mine was determined. 展开更多
关键词 efflorescent oxygenized belts upper limit water flowing fractured zone waterproof pillar
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部