Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and econom...Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and economic operation for nuclear power plants( NPPs) especially for a large number of nuclear powers under construction. Based on the development and application of maintenance template in developed countries,and combining with reliability-centered maintenance( RCM) analysis results and maintenance experience data over the past ten years in domestic NPPs, the development process of maintenance template was presented for Chinese pressurized water reactor( PWR) NPP,and the application of maintenance template to maintenance program development and maintenance optimization combined with cases were demonstrated. A shortcut was provided for improving the efficiency of maintenance optimization in domestic PWR NPP,and help to realize a safe,reliable,and economic operation for domestic NPPs.展开更多
This paper presents a novel method to solve old problem of water level control system of pressurized water reactor (PWR) steam generator (SG) of nuclear power plant (NPP) .The level control system of SG plays an impo...This paper presents a novel method to solve old problem of water level control system of pressurized water reactor (PWR) steam generator (SG) of nuclear power plant (NPP) .The level control system of SG plays an important role which effects the reliablity,safty,cost of SG and its mathematical models have been solved.A model of the conventional controller is presented and the existing problems are discussed. A novel rule based realtime control technique is designed with a computerized water level control (CWLC) system for SG of PWR NPP.The performance of this is evaluated for full power reactor operating conditions by applying different transient conditions of SG′s data of Qinshan Nuclear Power Plant (QNPP).展开更多
An monitoring and earlywarning system is proposed for marine organisms and the cause of water intake blockage is analyzed. Based onthe intelligent sensing technology, computer software and hardware technology and digi...An monitoring and earlywarning system is proposed for marine organisms and the cause of water intake blockage is analyzed. Based onthe intelligent sensing technology, computer software and hardware technology and digital signal processing technology, the buoy monitoring platformsystem is developed by internet of things technology, cloud computing and the application of large data. Remote realtime monitoring of aquatic organisms and foreign bodies is realized based on underwater acoustic detection and low light imaging technology. Data processing center is established to store, analyze and process monitoring information and display it in real time, and provide emergency decision support. Through development and test of relevant key equipments, the reliability of cold source system of nuclear power plants is improved, which effectively reduces theinfluence of marine biological invasion on security and economic operation of the units.展开更多
Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
After the Fukushima disaster, interest in the evaluation of severe accidents in nuclear power plants and off-site consequences has significantly increased. Because experimental studies are difficult to conduct, comput...After the Fukushima disaster, interest in the evaluation of severe accidents in nuclear power plants and off-site consequences has significantly increased. Because experimental studies are difficult to conduct, computational methods play a substantial role in accident analysis. In this study, a severe accident in the Bushehr pressurized water reactor power plant caused by a station blackout with a total loss of alternating current power supply has been evaluated. This analysis presents the in-core damage of fuel rods and the release of fission products as well as the thermal hydraulic response of the station components during the loss of active emergency cooling systems. In this manner, a perfect model of the Bushehr nuclear power plant using the MELCOR code is prepared. The accident progression is simulated, and the thermal responses of the fuels and hydraulic components are presented. It is shown that, without operator intervention, steam generators will become dry in approximately 3000 s, and the heat sink of the reactor will be lost. The simulation results show that at approximately 8600 s, the upper parts of the core start melting. This model calculates the shortest available time for accident prevention and proves that the time available is sufficient for operator manual action to prevent a nuclear disaster.展开更多
In this study, we evaluate the ecological impact of effluent cooling water from the Ninh Thuan nuclear power plant II, using a two-dimensional hydraulic model to simulate thermal diffusion from the effluent outfall. S...In this study, we evaluate the ecological impact of effluent cooling water from the Ninh Thuan nuclear power plant II, using a two-dimensional hydraulic model to simulate thermal diffusion from the effluent outfall. Sites selected for this study were Ninh Thuan nuclear power plant and Vinh Hai seawater in four different scenarios. This paper utilized the relationship between surface water temperature and the water temperature at a depth of -15 m to calculate the water temperature at intake and outlet at a depth of -14 m. A combination between the results of interpolated and results of model showed that effluent cooling water from Ninh Thuan plant affected the largest incidence about 2450 m in the North, 880 m in the South and 960 m in the West. It can be considered as safe distance to not to affect the coral reefs ecosystem in the North and sea turtle conservation area in the South. This study was first in this region to have an integrated approach using two-dimensional model.展开更多
This paper studies the application of renewable energy sources in wastewater treatment plants to achieve self-sustain- ability of power. The data of wastewater treatment plant in the rural city of Toukh-EGYPT are pres...This paper studies the application of renewable energy sources in wastewater treatment plants to achieve self-sustain- ability of power. The data of wastewater treatment plant in the rural city of Toukh-EGYPT are presented as a case-study. The primary objective is to provide an entirely renewable standalone power system, which satisfies lowest possible emissions with the minimum lifecycle cost. Mass balance principle is applied on the biodegradable components in the wastewater to evaluate the volume of digester gas that is produced from sludge through anaerobic digestion process. Using digester gas as a fuel lead to study combined-heat-and-power technologies, where fuel cell is selected in order to abide by the low emissions constraint. The study assessed the electrical power obtained from fuel cell and the utilization of the exhausted heat energy for additional electrical power production using a micro-turbine. After covering the major part of load demand, the use of other renewable energy sources was studied. The strength of both solar and wind energy was determined by the case-study location. Hybrid optimization model for electric renewable (HOMER) software was used to simulate the hybrid system composed of combined-heat-and-power units, wind turbines and photovoltaic systems. Simulation results gave the best system configuration and optimum size of each component beside the detailed electrical and cost analysis of the model.展开更多
文摘Good practices of maintenance optimization in nuclear power field need to be effectively consolidated and inherited,and maintenance optimization can provide technology support to create a long-term reliable and economic operation for nuclear power plants( NPPs) especially for a large number of nuclear powers under construction. Based on the development and application of maintenance template in developed countries,and combining with reliability-centered maintenance( RCM) analysis results and maintenance experience data over the past ten years in domestic NPPs, the development process of maintenance template was presented for Chinese pressurized water reactor( PWR) NPP,and the application of maintenance template to maintenance program development and maintenance optimization combined with cases were demonstrated. A shortcut was provided for improving the efficiency of maintenance optimization in domestic PWR NPP,and help to realize a safe,reliable,and economic operation for domestic NPPs.
文摘This paper presents a novel method to solve old problem of water level control system of pressurized water reactor (PWR) steam generator (SG) of nuclear power plant (NPP) .The level control system of SG plays an important role which effects the reliablity,safty,cost of SG and its mathematical models have been solved.A model of the conventional controller is presented and the existing problems are discussed. A novel rule based realtime control technique is designed with a computerized water level control (CWLC) system for SG of PWR NPP.The performance of this is evaluated for full power reactor operating conditions by applying different transient conditions of SG′s data of Qinshan Nuclear Power Plant (QNPP).
文摘An monitoring and earlywarning system is proposed for marine organisms and the cause of water intake blockage is analyzed. Based onthe intelligent sensing technology, computer software and hardware technology and digital signal processing technology, the buoy monitoring platformsystem is developed by internet of things technology, cloud computing and the application of large data. Remote realtime monitoring of aquatic organisms and foreign bodies is realized based on underwater acoustic detection and low light imaging technology. Data processing center is established to store, analyze and process monitoring information and display it in real time, and provide emergency decision support. Through development and test of relevant key equipments, the reliability of cold source system of nuclear power plants is improved, which effectively reduces theinfluence of marine biological invasion on security and economic operation of the units.
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
基金indebted to Shahid Beheshti University G. C. for partial support of this work
文摘After the Fukushima disaster, interest in the evaluation of severe accidents in nuclear power plants and off-site consequences has significantly increased. Because experimental studies are difficult to conduct, computational methods play a substantial role in accident analysis. In this study, a severe accident in the Bushehr pressurized water reactor power plant caused by a station blackout with a total loss of alternating current power supply has been evaluated. This analysis presents the in-core damage of fuel rods and the release of fission products as well as the thermal hydraulic response of the station components during the loss of active emergency cooling systems. In this manner, a perfect model of the Bushehr nuclear power plant using the MELCOR code is prepared. The accident progression is simulated, and the thermal responses of the fuels and hydraulic components are presented. It is shown that, without operator intervention, steam generators will become dry in approximately 3000 s, and the heat sink of the reactor will be lost. The simulation results show that at approximately 8600 s, the upper parts of the core start melting. This model calculates the shortest available time for accident prevention and proves that the time available is sufficient for operator manual action to prevent a nuclear disaster.
文摘In this study, we evaluate the ecological impact of effluent cooling water from the Ninh Thuan nuclear power plant II, using a two-dimensional hydraulic model to simulate thermal diffusion from the effluent outfall. Sites selected for this study were Ninh Thuan nuclear power plant and Vinh Hai seawater in four different scenarios. This paper utilized the relationship between surface water temperature and the water temperature at a depth of -15 m to calculate the water temperature at intake and outlet at a depth of -14 m. A combination between the results of interpolated and results of model showed that effluent cooling water from Ninh Thuan plant affected the largest incidence about 2450 m in the North, 880 m in the South and 960 m in the West. It can be considered as safe distance to not to affect the coral reefs ecosystem in the North and sea turtle conservation area in the South. This study was first in this region to have an integrated approach using two-dimensional model.
文摘This paper studies the application of renewable energy sources in wastewater treatment plants to achieve self-sustain- ability of power. The data of wastewater treatment plant in the rural city of Toukh-EGYPT are presented as a case-study. The primary objective is to provide an entirely renewable standalone power system, which satisfies lowest possible emissions with the minimum lifecycle cost. Mass balance principle is applied on the biodegradable components in the wastewater to evaluate the volume of digester gas that is produced from sludge through anaerobic digestion process. Using digester gas as a fuel lead to study combined-heat-and-power technologies, where fuel cell is selected in order to abide by the low emissions constraint. The study assessed the electrical power obtained from fuel cell and the utilization of the exhausted heat energy for additional electrical power production using a micro-turbine. After covering the major part of load demand, the use of other renewable energy sources was studied. The strength of both solar and wind energy was determined by the case-study location. Hybrid optimization model for electric renewable (HOMER) software was used to simulate the hybrid system composed of combined-heat-and-power units, wind turbines and photovoltaic systems. Simulation results gave the best system configuration and optimum size of each component beside the detailed electrical and cost analysis of the model.