Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio...Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
文摘Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.