Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling
1
作者 Peng Qiao Shuangshuang Lan +1 位作者 Hongbiao Gu Zhengtan Mao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第5期1381-1399,共19页
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co... Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state. 展开更多
关键词 Underground reservoir fluid-structure coupling numerical simulation pumped storage power station filling and discharge
下载PDF
Virtual Synchronous Generator Adaptive Control of Energy Storage Power Station Based on Physical Constraints
2
作者 Yunfan Huang Qingquan Lv +1 位作者 Zhenzhen Zhang Haiying Dong 《Energy Engineering》 EI 2023年第6期1401-1420,共20页
The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability ... The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability to actively support the power grid,from passive regulation to active support.Since energy storage is an important physical basis for realizing the inertia and damping characteristics in VSG control,energy storage constraints of the physical characteristics on the system control parameters are analyzed to provide a basis for the system parameter tuning.In a classic VSG control,its virtual inertia and damping coefficient remain unchanged.When the grid load changes greatly,the constant control strategy most likely result in the grid frequency deviation beyond the stable operation standard limitations.To solve this problem,a comprehensive control strategy considering electrified wire netting demand and energy storage unit state of charge(SOC)is proposed,and an adaptive optimization method of VSG parameters under different SOC is given.The energy storage battery can maintain a safe working state at any time and be smoothly disconnected,which can effectively improve the output frequency performance of energy storage system.Simulation results further demonstrated the effectiveness of the VSG control theoretical analysis. 展开更多
关键词 VSG energy storage power station physical constraints of energy storage adaptive parameter frequency performance
下载PDF
Study on integrated development and hybrid operation mode of nuclear power plant and pumped-storage power station 被引量:6
3
作者 Haizheng Wang Caide Peng 《Global Energy Interconnection》 2019年第4期336-341,共6页
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode... The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed. 展开更多
关键词 NUCLEAR power PLANT pumped-storage power station Integrated development HYBRID operation MODES
下载PDF
Prospect of new pumped-storage power station 被引量:3
4
作者 Jingyan Li Chuanbao Yi Sujie Gao 《Global Energy Interconnection》 2019年第3期235-243,共9页
In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station ... In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station can be improved with variable-speed pumped-storage tech no logy. Combined with chemical en ergy storage, the failure to achieve sec on d-order response speed and the insufficient safety and reliability of pumped-storage power units could be solved. With the better solar en ergy and site resources, the in teg rated performance can be improved by an optical storage system in stalled in future pumped-storage stations. Through the characteristics analysis of the new type of pumped-storage power station, three types of optimal station locations are proposed, namely, the load concentration area, new energy concentration area, and ultrahigh- voltage direct current receiver area. Taking the new pumped-storage power station as an example, the advantages of multi-energy cooperation and joint operation are analyzed. It can be predicted that the frequency and load regulation of the power grid will be more flexible, and the service capacity to the main power grid will be much stronger in the future. 展开更多
关键词 pumped-storage power station Variable-speed pumped-storage technology CHEMICAL energy storage Solarenergy storage system
下载PDF
Equivalent Substitution Based Method for Calculation of Best Installed Capacity of Pumped Storage Power Station
5
作者 Jinming Li Tao Yu Huaizhi Wang 《Energy and Power Engineering》 2013年第3期46-51,共6页
This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system runnin... This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station. 展开更多
关键词 STATIC BENEFITS Dynamic BENEFITS pumpED storage power station Best Installed Capacity
下载PDF
Test Facility for Low Potential Pumped Storage Power Plants and Hydrokinetic Turbines
6
作者 Dominik Surek 《Journal of Energy and Power Engineering》 2013年第11期2037-2044,共8页
关键词 抽水蓄能电站 试验设施 液力透平 电位 风力发电厂 港口设施 测试设备 跌落高度
下载PDF
Present status of pumped hydro storage operations to mitigate renewable energy fluctuations in Japan 被引量:1
7
作者 Shota Ichimura Seiichiro Kimura 《Global Energy Interconnection》 2019年第5期424-429,共6页
This paper focuses on pumped hydro energy storage(PHES)plants’current operations after electricity system reforms and variable renewable energy(VRE)installations in Japan.PHES plants have historically been developed ... This paper focuses on pumped hydro energy storage(PHES)plants’current operations after electricity system reforms and variable renewable energy(VRE)installations in Japan.PHES plants have historically been developed to create electricity demand at night in order to operate base load power plants,such as nuclear power plants,in stable conditions.Therefore,many PHES plants are located midway between nuclear power plants and large demand areas.However,all nuclear power plants had to–at least temporarily–shut down after the Great East Japan Earthquake followed by a nuclear accident at Fukushima Daiichi in 2011,and renewable energy power plants have been deployed rapidly after the introduction of a feed-in-tariff(FIT)scheme.Therefore,PHES plants are being used to mitigate fluctuations of VRE,especially in areas where renewable energy has been significantly installed.The daily highest capacity ratio of PHES plants in Kyushu area has recorded three times higher than it in the other areas where the past operating mode is still conducted.But those operations on PHES plants are simply followed as a dispatch rule of the Organization for Crossregional Coordination of Transmission Operators(OCCTO),market-based operations have not been conducted enough yet.The market design shall be changed to harmonize VRE installation and PHES plants’operations are necessary to make the transition from the past operating mode of PHES plants across Japan. 展开更多
关键词 pumpED hydro energy storage PLANT Nuclear power PLANT Variable RENEWABLE energy Solar photovoltaic Marketdesign
下载PDF
Counter-Rotating Type Pump-Turbine Unit Stabilizing Momentarily Fluctuating Power from Renewable Energy Resources
8
作者 Toshiaki Kanemoto Risa Kasahara +1 位作者 Hirotaka Honda Toru Miyaji 《Journal of Energy and Power Engineering》 2014年第6期981-989,共9页
关键词 可再生能源资源 电力系统稳定 泵机组 功率 旋转式 振荡 涡轮机组 网格系统
下载PDF
Optimal Dispatching Model Considering the Pumped Sto-rage Power Plant in Hunan
9
作者 Xinfan Jiang Dunnan Liu +1 位作者 Siyuan Zhang Wenlei Zhang 《Energy and Power Engineering》 2013年第4期608-611,共4页
This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical... This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical requirement of dispatching. Then it brings forward the intelligent optimization model and set up running model for pumped storage power station of Hei Mi-feng. At last, it introduces the application of pumped storage power station in Hunan power grid and proves the effectiveness of the optimization models. 展开更多
关键词 Intelligent Optimization DISPATCHING Model pumpED storage power station
下载PDF
Compact Electric Energy Storage for Marine Vehicles Using on-Board Hydrogen Production
10
作者 Alon Gany Shani Elitzur Valery Rosenband 《Journal of Shipping and Ocean Engineering》 2015年第4期151-158,共8页
关键词 氢气生产 电能储存 车辆 紧凑型 船用 能量密度 燃料电池 发电系统
下载PDF
基于Microstation及奥维地图的抽水蓄能电站施工总布置设计 被引量:1
11
作者 陈俊 朱静萍 《云南水力发电》 2023年第3期219-222,共4页
抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及... 抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及GPS定位和导航功能,对抽水蓄能电站施工总布置设计进行研究。设计效果表明:基于Microstation及奥维地图的抽水蓄能电站施工总布置设计,提高了勘察设计效率及质量,减少了勘察设计失误,为抽水蓄能电站施工总布置设计提供了新思路。 展开更多
关键词 MICROstation 奥维地图 抽水蓄能电站 施工总布置
下载PDF
锂离子电池储能电站的热失控状态检测与安全防控技术研究进展
12
作者 孟国栋 李雨珮 +4 位作者 唐佳 顾颐 金阳 陈欣 成永红 《高电压技术》 EI CAS CSCD 北大核心 2024年第7期3105-3127,I0018,共24页
锂离子电池具有能量密度大、使用寿命长、工作温度范围宽、自放电小等优点,是中国电化学储能电站的主流电池技术。然而,在加热、过充等恶劣工况下,锂离子电池易发生热失控引发火灾甚至爆炸,因此其安全问题已逐渐成为锂离子电池储能电站... 锂离子电池具有能量密度大、使用寿命长、工作温度范围宽、自放电小等优点,是中国电化学储能电站的主流电池技术。然而,在加热、过充等恶劣工况下,锂离子电池易发生热失控引发火灾甚至爆炸,因此其安全问题已逐渐成为锂离子电池储能电站建设及大规模应用的首要问题。该文系统分析了锂离子储能电池热失控的诱因、电池内部反应过程及外部特征参量的变化规律,重点总结了当前主要的电池热失控状态检测技术、智能诊断算法及储能电站安全防控技术,最后对储能电站热失控状态检测及安全防控技术进行了总结和展望。 展开更多
关键词 锂离子电池 储能电站 热失控 状态检测 安全防控
下载PDF
侧式进/出水口各孔道流量分配差异及影响因素
13
作者 高学平 马一鸣 +1 位作者 刘殷竹 朱洪涛 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2024年第6期633-641,共9页
对于抽水蓄能电站侧式进/出水口各孔道流量分配,现有设计规范规定进/出水口相邻中边孔道的流量不均匀程度不宜超过10%,但实际工程设计难以达到此要求.本文以某抽水蓄能电站侧式进/出水口为例,通过优化进/出水口各体型参数,利用数值模拟... 对于抽水蓄能电站侧式进/出水口各孔道流量分配,现有设计规范规定进/出水口相邻中边孔道的流量不均匀程度不宜超过10%,但实际工程设计难以达到此要求.本文以某抽水蓄能电站侧式进/出水口为例,通过优化进/出水口各体型参数,利用数值模拟方法研究各孔道流量等水力参数,重点分析分流墩布置对各孔道流量分配的影响及其规律,试图使进流工况和出流工况相邻中边孔道的流量不均匀程度均最小.研究表明,改变扩散段分流墩布置能有效改善流量不均匀程度.对于3墩4孔侧式进/出水口,相邻中边孔道的流量不均匀程度在出流工况下随中边孔宽度比增大而增大,在进流工况下随中边孔宽度比增大而减小;当中边孔宽度比增大且中墩后移距离减小时,出流工况和进流工况下的流量不均匀程度均减小.对于2墩3孔侧式进/出水口,相邻中边孔道的流量不均匀程度不论在出流工况下还是在进流工况下,均随中边孔宽度比增大呈先减小后增大的规律.优化后的3墩4孔侧式进/出水口的中边孔宽度比取0.228∶0.272,中墩后移距离取0.36D(D为隧洞直径),其相邻中边孔道的流量不均匀程度均较优,在出流工况下为18.47%~19.43%,在进流工况下为19.82%~19.83%;优化后的2墩3孔侧式进/出水口的中边孔宽度比取0.310∶0.345,其相邻中边孔道的流量不均匀程度均较优,在出流工况下为19.47%~19.63%,在进流工况下为18.66%~18.67%.相邻中边孔道的流量不均匀程度较难满足不宜超过10%的设计规范要求.研究成果将有助于《抽水蓄能电站设计规范》中关于进/出水口水力指标要求的完善. 展开更多
关键词 抽水蓄能电站 侧式进/出水口 体型优化 流量分配 数值模拟
下载PDF
NB/T 35009-2024修订内容解读及抽水蓄能电站标准化工作历程回顾
14
作者 高洁 岳蕾 朱方亮 《中国标准化》 2024年第15期148-152,共5页
本文回顾了抽水蓄能电站选点规划标准化工作历程,从90年代选点规划工作范围逐步扩展,一批代表性站点规划落地,选点规划思想逐渐成熟,首版标准于2003年编制完成。到2009年全国范围抽水蓄能电站选点规划系统性开展,继22个省(区、市)完成... 本文回顾了抽水蓄能电站选点规划标准化工作历程,从90年代选点规划工作范围逐步扩展,一批代表性站点规划落地,选点规划思想逐渐成熟,首版标准于2003年编制完成。到2009年全国范围抽水蓄能电站选点规划系统性开展,继22个省(区、市)完成选点工作,第二版标准修订完成,有效指导了实践工作。随着抽水蓄能电站选点规划的管理流程和技术路线不断成熟,选点规划已成为前期工作和开工建设的重要基础。双碳目标提出以来,抽水蓄能中长期发展规划为行业发展带来新机遇新挑战,第三版标准修订工作适时开展,区分功能定位、明确技术要求,积极响应了当前新能源和抽水蓄能行业高质量发展的要求。 展开更多
关键词 抽水蓄能电站选点规划 抽水蓄能发展规划 抽水蓄能电站技术标准体系
下载PDF
海水泵站流道非对称引水流态特性数值模拟分析
15
作者 张娜 杨克凡 +1 位作者 邹国良 金越睿 《水利水电科技进展》 CSCD 北大核心 2024年第3期57-63,94,共8页
为探讨海水泵站流道非对称引水流态特性,基于OpenFOAM建立了某液化天然气接收站海水泵站流道数值模型,在利用实测数据验证的基础上,模拟计算与分析了对称和非对称引水时,流道内流速与紊动动能分布特征。模拟结果表明:海水泵站非对称引水... 为探讨海水泵站流道非对称引水流态特性,基于OpenFOAM建立了某液化天然气接收站海水泵站流道数值模型,在利用实测数据验证的基础上,模拟计算与分析了对称和非对称引水时,流道内流速与紊动动能分布特征。模拟结果表明:海水泵站非对称引水时,水流进入前池后流速较大,在低水位下水流无法充分扩散,在流道入口处形成偏流,行进至海水泵前断面水流分布已基本均匀;非对称引水时,海水泵所在进水池各断面均匀性指数平均值高于对称引水工况,且各海水泵进水池的紊动动能平均值也小于对称引水工况;从过水断面流速分布均匀性以及紊动量级来看,非对称引水对水泵运行更有利。 展开更多
关键词 海水泵站 非对称引水 紊动动能 数值模拟 OPENFOAM
下载PDF
计及深度调峰的风-光-水-火-抽蓄多能源联网系统优化调度研究
16
作者 李卫国 丁硕 +1 位作者 安祎宁 蔡婷婷 《东北电力大学学报》 2024年第3期83-93,共11页
多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网... 多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网系统日前优化调度模型。针对多能源耦合系统结构复杂的情况,提出了分层优化调度的模型求解策略。上层模型以净负荷波动最小为优化目标,得到等效负荷曲线;下层模型根据上层模型的调度结果,以调峰运行的经济性最优和新能源弃电率最低为目标函数,计及调峰主动性,求解考虑火电机组深度调峰煤耗特性的含新能源系统的经济调度问题。仿真算例表明所建模型实现了多能源联网系统的互补运行,提升了火电机组的深度调峰能力,降低新能源弃电率和系统运行成本。 展开更多
关键词 多能源系统 抽水蓄能电站 深度调峰 优化调度 调峰主动性
下载PDF
基于组合赋权-云模型的抽蓄电站高质量发展评价体系
17
作者 余恩海 佟佳颖 刘琳 《电力科学与工程》 2024年第5期64-71,共8页
为科学评价生产期抽蓄电站高质量发展现状、把握电站发展的薄弱环节、明确建设期及新投运电站发展方向,根据抽蓄电站定位及高质量发展内涵,经过2轮筛选,构建了包含服务电力系统稳定运行、经济、绿色、创新、共享5个一级指标以及18个二... 为科学评价生产期抽蓄电站高质量发展现状、把握电站发展的薄弱环节、明确建设期及新投运电站发展方向,根据抽蓄电站定位及高质量发展内涵,经过2轮筛选,构建了包含服务电力系统稳定运行、经济、绿色、创新、共享5个一级指标以及18个二级指标的评价指标体系;选用层次分析法–决策实验分析方法确定指标权重,运用云模型评价各电站高质量发展等级。最后,选取A抽蓄电站为算例验证评价体系适用性。评价结果显示,该电站服务电力系统稳定运行、绿色和共享3个指标表现均为良好,经济和创新指标表现为中等,与电站实际运行情况相符合。该验证结果表明,采用上述方法构建的评价指标体系有很好的适用性。 展开更多
关键词 抽水蓄能电站 高质量发展评价 层次分析法 决策实验室分析法 云模型 新型电力系统
下载PDF
接立面转弯隧洞的侧式出水口水力特性
18
作者 高学平 魏南疆 刘殷竹 《长江科学院院报》 CSCD 北大核心 2024年第7期94-102,共9页
对于接立面转弯隧洞的侧式出水口,立面转弯隧洞的转弯段将直接影响侧式出水口的水力特性。若立面转弯隧洞参数设计不合理,极易导致侧式出水口内部发生流动分离。选取RSM紊流模型,针对接立面转弯隧洞的侧式出水口进行数值模拟,探究立面... 对于接立面转弯隧洞的侧式出水口,立面转弯隧洞的转弯段将直接影响侧式出水口的水力特性。若立面转弯隧洞参数设计不合理,极易导致侧式出水口内部发生流动分离。选取RSM紊流模型,针对接立面转弯隧洞的侧式出水口进行数值模拟,探究立面转弯隧洞曲率半径R、弯道后直隧洞长度L及转弯角度α等参数对出水口水力特性的影响规律,并对隧洞内流动过程进行了讨论。增加立面转弯隧洞曲率半径R和弯道后直隧洞长度L能显著改善出水口的水力指标。当曲率半径R≥12 D(D为隧洞直径)、弯道后直隧洞长度L≥16 D时,侧式出水口内部无明显流动分离,拦污栅断面流速分布均匀且无反向流速区。研究成果将对抽水蓄能电站侧式进/出水口的设计提供指导。 展开更多
关键词 抽水蓄能电站 侧式出水口 立面转弯隧洞 水力特性 数值模拟
下载PDF
抽蓄电站全库盆防渗水库渗流缺陷影响分析
19
作者 王润英 赵凯文 林思雨 《水电能源科学》 北大核心 2024年第3期105-109,共5页
针对抽蓄电站全库盆防渗水库土工膜缺陷导致水库渗流量产生变化的安全问题,结合陕西省某抽蓄电站水库库底土工膜防渗工程,采用单因素影响分析和多因素影响分析方法进行抽蓄电站全库盆防渗水库渗流缺陷影响分析。结果表明,水头大小、缺... 针对抽蓄电站全库盆防渗水库土工膜缺陷导致水库渗流量产生变化的安全问题,结合陕西省某抽蓄电站水库库底土工膜防渗工程,采用单因素影响分析和多因素影响分析方法进行抽蓄电站全库盆防渗水库渗流缺陷影响分析。结果表明,水头大小、缺陷大小、缺陷个数均正向影响抽蓄水库渗流量,而缺陷位置与抽蓄水库渗流量的相关性不明显。其中缺陷大小是影响抽蓄水库渗流量的主要因素,其次为水头大小,再次为缺陷个数。 展开更多
关键词 抽蓄电站全库盆防渗水库 土工膜缺陷 渗流量 缺陷影响分析
下载PDF
含废旧矿井抽蓄电站的源-荷-储协同控制调频研究
20
作者 骆钊 田肖 +3 位作者 莫熙 聂灵峰 沈鑫 雷元庆 《电力系统保护与控制》 EI CSCD 北大核心 2024年第8期134-144,共11页
针对新能源在电网中渗透率不断提高导致系统调频容量和频率响应能力不足的问题,提出一种含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。首先,建立了电解铝工业负荷、废旧矿井抽蓄电站和超级电容频率响应模型。然后,基于模型预测控制理... 针对新能源在电网中渗透率不断提高导致系统调频容量和频率响应能力不足的问题,提出一种含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。首先,建立了电解铝工业负荷、废旧矿井抽蓄电站和超级电容频率响应模型。然后,基于模型预测控制理论,以系统状态量和控制量的加权函数最小为目标,设计区域信息互动的分布式模型预测控制器,并提出含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。最后,将分布式模型预测控制器应用在所提源-荷-储协同控制方法中,并在改进的IEEE标准两区域LFC模型中进行仿真。结果表明所提方法可以缩短频率恢复时间,减小最大频差值,改善系统调频动态性能。 展开更多
关键词 负荷频率控制 废旧矿井抽蓄电站 超级电容 分布式模型预测控制