Water resources are an indispensable and valuable resource for human survival and development.Water quality predicting plays an important role in the protection and development of water resources.It is difficult to pr...Water resources are an indispensable and valuable resource for human survival and development.Water quality predicting plays an important role in the protection and development of water resources.It is difficult to predictwater quality due to its random and trend changes.Therefore,amethod of predicting water quality which combines Auto Regressive Integrated Moving Average(ARIMA)and clusteringmodelwas proposed in this paper.By taking thewater qualitymonitoring data of a certain river basin as a sample,thewater quality Total Phosphorus(TP)index was selected as the prediction object.Firstly,the sample data was cleaned,stationary analyzed,and white noise analyzed.Secondly,the appropriate parameters were selected according to the Bayesian Information Criterion(BIC)principle,and the trend component characteristics were obtained by using ARIMA to conduct water quality predicting.Thirdly,the relationship between the precipitation and the TP index in themonitoring water field was analyzed by the K-means clusteringmethod,and the random incremental characteristics of precipitation on water quality changes were calculated.Finally,by combining with the trend component characteristics and the random incremental characteristics,the water quality prediction results were calculated.Compared with the ARIMA water quality prediction method,experiments showed that the proposed method has higher accuracy,and its Mean Absolute Error(MAE),Mean Square Error(MSE),and Mean Absolute Percentage Error(MAPE)were respectively reduced by 44.6%,56.8%,and 45.8%.展开更多
Aquaculture has long been a critical economic sector in Taiwan.Since a key factor in aquaculture production efficiency is water quality,an effective means of monitoring the dissolved oxygen content(DOC)of aquaculture ...Aquaculture has long been a critical economic sector in Taiwan.Since a key factor in aquaculture production efficiency is water quality,an effective means of monitoring the dissolved oxygen content(DOC)of aquaculture water is essential.This study developed an internet of things system for monitoring DOC by collecting essential data related to water quality.Artificial intelligence technology was used to construct a water quality prediction model for use in a complete system for managing water quality.Since aquaculture water quality depends on a continuous interaction among multiple factors,and the current state is correlated with the previous state,a model with time series is required.Therefore,this study used recurrent neural networks(RNNs)with sequential characteristics.Commonly used RNNs such as long short-term memory model and gated recurrent unit(GRU)model have a memory function that appropriately retains previous results for use in processing current results.To construct a suitable RNN model,this study used Taguchi method to optimize hyperparameters(including hidden layer neuron count,iteration count,batch size,learning rate,and dropout ratio).Additionally,optimization performance was also compared between 5-layer and 7-layer network architectures.The experimental results revealed that the 7-layer GRU was more suitable for the application considered in this study.The values obtained in tests of prediction performance were mean absolute percentage error of 3.7134%,root mean square error of 0.0638,and R-value of 0.9984.Therefore,thewater qualitymanagement system developed in this study can quickly provide practitioners with highly accurate data,which is essential for a timely response to water quality issues.This study was performed in collaboration with the Taiwan Industrial Technology Research Institute and a local fishery company.Practical application of the system by the fishery company confirmed that the monitoring system is effective in improving the survival rate of farmed fish by providing data needed to maintain DOC higher than the standard value.展开更多
At present,water pollution has become an important factor affecting and restricting national and regional economic development.Total phosphorus is one of the main sources of water pollution and eutrophication,so the p...At present,water pollution has become an important factor affecting and restricting national and regional economic development.Total phosphorus is one of the main sources of water pollution and eutrophication,so the prediction of total phosphorus in water quality has good research significance.This paper selects the total phosphorus and turbidity data for analysis by crawling the data of the water quality monitoring platform.By constructing the attribute object mapping relationship,the correlation between the two indicators was analyzed and used to predict the future data.Firstly,the monthly mean and daily mean concentrations of total phosphorus and turbidity outliers were calculated after cleaning,and the correlation between them was analyzed.Secondly,the correlation coefficients of different times and frequencies were used to predict the values for the next five days,and the data trend was predicted by python visualization.Finally,the real value was compared with the predicted value data,and the results showed that the correlation between total phosphorus and turbidity was useful in predicting the water quality.展开更多
Recent trends in environmental management of water resource have enlarged the demand for predicting techniques that can provide reliable, efficient and accurate water quality. In this case study, the authors applied t...Recent trends in environmental management of water resource have enlarged the demand for predicting techniques that can provide reliable, efficient and accurate water quality. In this case study, the authors applied the Artificial Neural Networks (ANN) to estimate the water quality index on the Dong Nai River flowing through Dong Nai and Binh Duong provinces. The information and data including 10 water quality parameters of the Dong Nai River at 23 monitoring stations were collected during the recorded time period from 2010 to 2014 to build water quality prediction models. The results of the study demonstrated that the Water Quality Index (WQI) forecasted with GRNN was very significant and had high correlation coefficient (R2 = 0.974 and p = 0.0) compared to the real values of the WQI. Moreover, the ANN models provided better predicted values than the multiple regression models did.展开更多
Artificial Neural Network(ANN)models have been extensively applied in the prediction of water resource variables,and Geographical Information System(GIS)includes powerful functions to visualize spatial data.In order t...Artificial Neural Network(ANN)models have been extensively applied in the prediction of water resource variables,and Geographical Information System(GIS)includes powerful functions to visualize spatial data.In order to provide an efficient tool for environmental assessment and management that combines the advantages of these two modules,a GIS-based ANN water quality prediction system was developed in the present study.The ANN module and ArcGIS Engine module,along with a dynamic database,were imbedded in the system,which integrates water quality prediction via the ANN model and spatial presentation of the model results.The structure of the ANN model could be modified through the graphical user interface to optimize the model performance.The developed system was applied to a real case study for the prediction of the total phosphorus concentration in the Lake Champlain area.The prediction results were verified with the monitoring data,and the performance of the developed model was further evaluated through graphical techniques and quantitative statistical methods.Overall,the developed system provided satisfactory prediction results,and spatial distribution maps of the predicted results were obtained,which coincided with the monitored values.The developed GIS-based ANN water quality prediction system could serve as an efficient tool for engineers and decision makers.展开更多
Chaos theory was introduced for water quality, prediction, and the model of water quality prediction was established by combining phase space reconstruction theory and BP neural network forecasting method. Through the...Chaos theory was introduced for water quality, prediction, and the model of water quality prediction was established by combining phase space reconstruction theory and BP neural network forecasting method. Through the phase space reconstruction, the one-dimensional water quality time series were mapped to be multi-dimensional sequence, which enriched the spatial information of water quality change and expanded mapping region of training samples of BP neural network. Established model of combining chaos theory and BP neural network were applied to forecast turbidity time series of a certain reservoir. Contrast to BP neural network method, the relative error and the mean squared error of the combined method had all varying degrees of lower. Results indicated the neural network model with chaos theory had the higher prediction accuracy, at the same time, it had better fault-tolerant capability and generalization performance .展开更多
Neural networks(NNs)have been used extensively in surface water prediction tasks due to computing algorithm improvements and data accumulation.An essential step in developing an NN is the hyperparameter selection.In p...Neural networks(NNs)have been used extensively in surface water prediction tasks due to computing algorithm improvements and data accumulation.An essential step in developing an NN is the hyperparameter selection.In practice,it is common to manually determine hyperparameters in the studies of NNs in water resources tasks.This may result in considerable randomness and require significant computation time;therefore,hyperparameter optimization(HPO)is essential.This study adopted five representatives of the HPO techniques in the surface water quality prediction tasks,including the grid sampling(GS),random search(RS),genetic algorithm(GA),Bayesian optimization(BO)based on the Gaussian process(GP),and the tree Parzen estimator(TPE).For the evaluation of these techniques,this study proposed a method:first,the optimal hyperparameter value sets achieved by GS were regarded as the benchmark;then,the other HPO techniques were evaluated and compared with the benchmark in convergence,optimization orientation,and consistency of the optimized values.The results indicated that the TPE-based BO algorithm was recommended because it yielded stable convergence,reasonable optimization orientation,and the highest consistency rates with the benchmark values.The optimization consistency rates via TPE for the hyperparameters hidden layers,hidden dimension,learning rate,and batch size were 86.7%,73.3%,73.3%,and 80.0%,respectively.Unlike the evaluation of HPO techniques directly based on the prediction performance of the optimized NN in a single HPO test,the proposed benchmark-based HPO evaluation approach is feasible and robust.展开更多
Efficiently predicting effluent quality through data-driven analysis presents a significant advancement for consistent wastewater treatment operations.In this study,we aimed to develop an integrated method for predict...Efficiently predicting effluent quality through data-driven analysis presents a significant advancement for consistent wastewater treatment operations.In this study,we aimed to develop an integrated method for predicting effluent COD and NH3 levels.We employed a 200 L pilot-scale sequencing batch reactor(SBR)to gather multimodal data from urban sewage over 40 d.Then we collected data on critical parameters like COD,DO,pH,NH_(3),EC,ORP,SS,and water temperature,alongside wastewater surface images,resulting in a data set of approximately 40246 points.Then we proposed a brain-inspired image and temporal fusion model integrated with a CNN-LSTM network(BITF-CL)using this data.This innovative model synergized sewage imagery with water quality data,enhancing prediction accuracy.As a result,the BITF-CL model reduced prediction error by over 23%compared to traditional methods and still performed comparably to conventional techniques even without using DO and SS sensor data.Consequently,this research presents a cost-effective and precise prediction system for sewage treatment,demonstrating the potential of brain-inspired models.展开更多
Efficient water quality monitoring and ensuring the safety of drinking water by government agencies in areas where the resource is constantly depleted due to anthropogenic or natural factors cannot be overemphasized. ...Efficient water quality monitoring and ensuring the safety of drinking water by government agencies in areas where the resource is constantly depleted due to anthropogenic or natural factors cannot be overemphasized. The above statement holds for West Texas, Midland, and Odessa Precisely. Two machine learning regression algorithms (Random Forest and XGBoost) were employed to develop models for the prediction of total dissolved solids (TDS) and sodium absorption ratio (SAR) for efficient water quality monitoring of two vital aquifers: Edward-Trinity (plateau), and Ogallala aquifers. These two aquifers have contributed immensely to providing water for different uses ranging from domestic, agricultural, industrial, etc. The data was obtained from the Texas Water Development Board (TWDB). The XGBoost and Random Forest models used in this study gave an accurate prediction of observed data (TDS and SAR) for both the Edward-Trinity (plateau) and Ogallala aquifers with the R<sup>2</sup> values consistently greater than 0.83. The Random Forest model gave a better prediction of TDS and SAR concentration with an average R, MAE, RMSE and MSE of 0.977, 0.015, 0.029 and 0.00, respectively. For the XGBoost, an average R, MAE, RMSE, and MSE of 0.953, 0.016, 0.037 and 0.00, respectively, were achieved. The overall performance of the models produced was impressive. From this study, we can clearly understand that Random Forest and XGBoost are appropriate for water quality prediction and monitoring in an area of high hydrocarbon activities like Midland and Odessa and West Texas at large.展开更多
Anaerobic process is regarded as a green and sustainable process due to low carbon emission and minimal energy consumption in wastewater treatment plants(WWTPs).However,some water quality metrics are not measurable in...Anaerobic process is regarded as a green and sustainable process due to low carbon emission and minimal energy consumption in wastewater treatment plants(WWTPs).However,some water quality metrics are not measurable in real time,thus influencing the judgment of the operators and may increase energy consumption and carbon emission.One of the solutions is using a soft-sensor prediction technique.This article introduces a water quality soft-sensor prediction method based on Bidirectional Gated Recurrent Unit(BiGRU)combined with Gaussian Progress Regression(GPR)optimized by Tree-structured Parzen Estimator(TPE).TPE automatically optimizes the hyperparameters of BiGRU,and BiGRU is trained to obtain the point prediction with GPR for the interval prediction.Then,a case study applying this prediction method for an actual anaerobic process(2500 m^(3)/d)is carried out.Results show that TPE effectively optimizes the hyperparameters of BiGRU.For point prediction of CODeff and biogas yield,R^(2)values of BiGRU,which are 0.973 and 0.939,respectively,are increased by 1.03%–7.61%and 1.28%–10.33%,compared with those of other models,and the valid prediction interval can be obtained.Besides,the proposed model is assessed as a reliable model for anaerobic process through the probability prediction and reliable evaluation.It is expected to provide high accuracy and reliable water quality prediction to offer basis for operators in WWTPs to control the reactor and minimize carbon emission and energy consumption.展开更多
Lake Fuxian is the largest deep freshwater lake in China. Although its average water quality meets Class I of the China National Water Quality Standard (CNWQS), i.e., GB3838-2002, monitoring data indicate that the w...Lake Fuxian is the largest deep freshwater lake in China. Although its average water quality meets Class I of the China National Water Quality Standard (CNWQS), i.e., GB3838-2002, monitoring data indicate that the water quality approaches the Class II threshold in some areas. Thus it is urgent to reduce the watershed load through the total maximum daily load (TMDL) program. A three-dimensional hydrodynamic and water quality model was developed for Lake Fuxian, simulating flow circulation and pollutant fate and transport. The model development process consists of several steps, including grid generation, initial and boundary condition configurations, and model calibration processes. The model accurately reproduced the observed water surface elevation, spatiotemporal variations in temperature, and total nitrogen (TN), total phosphorus (TP), and chemical oxygen demand (COD) concentrations, suggesting a reasonable numerical representation of the prototype system for further TMDL analyses. The TMDL was calculated using two interpretations of the water quality standards for Class I of the CNWQS based on the maximum instantaneous surface and annual average surface water concentrations. Analysis of the first scenario indicated that the TN, TP and COD loads should be reduced by 66%, 68% and 57%, respectively. Water quality was the highest priority; however, local economic development and cost feasibility for load reduction can pose significant issues. In the second interpretation, the model results showed that, under the existing conditions, the average water quality meets the Class I standard and therefore load reduction is unnecessary. Future studies are needed to conduct risk and cost assessments for realistic decision-making.展开更多
Data-driven approaches that make timely predictions about pollutant concentrations in the effluent of constructed wetlands are essential for improving the treatment performance of constructed wetlands.However,the effe...Data-driven approaches that make timely predictions about pollutant concentrations in the effluent of constructed wetlands are essential for improving the treatment performance of constructed wetlands.However,the effect of the meteorological condition and flow changes in a real scenario are generally neglected in water quality prediction.To address this problem,in this study,we propose an approach based on multi-source data fusion that considers the following indicators:water quality indicators,water quantity indicators,and meteorological indicators.In this study,we establish four representative methods to simultaneously predict the concentrations of three representative pollutants in the effluent of a practical large-scale constructed wetland:(1)multiple linear regression;(2)backpropagation neural network(BPNN);(3)genetic algorithm combined with the BPNN to solve the local minima problem;and(4)long short-term memory(LSTM)neural network to consider the influence of past results on the present.The results suggest that the LSTM-predicting model performed considerably better than the other deep neural network-based model or linear method,with a satisfactory R^(2).Additionally,given the huge fluctuation of different pollutant concentrations in the effluent,we used a moving average method to smooth the original data,which successfully improved the accuracy of traditional neural networks and hybrid neural networks.The results of this study indicate that the hybrid modeling concept that combines intelligent and scientific data preprocessing methods with deep learning algorithms is a feasible approach for forecasting water quality in the effluent of actual engineering.展开更多
基金funded by the National Natural Science Foundation of China(No.51775185),Natural Science Foundation of Hunan Province(2022JJ90013)Scientific Research Fund of Hunan Province Education Department(18C0003)+1 种基金Research project on teaching reform in colleges and universities of Hunan Province Education Department(20190147)Hunan Normal University University-Industry Cooperation.This work is implemented at the 2011 Collaborative Innovation Center for Development and Utilization of Finance and Economics Big Data Property,Universities of Hunan Province,Open project,Grant Number 20181901CRP04.
文摘Water resources are an indispensable and valuable resource for human survival and development.Water quality predicting plays an important role in the protection and development of water resources.It is difficult to predictwater quality due to its random and trend changes.Therefore,amethod of predicting water quality which combines Auto Regressive Integrated Moving Average(ARIMA)and clusteringmodelwas proposed in this paper.By taking thewater qualitymonitoring data of a certain river basin as a sample,thewater quality Total Phosphorus(TP)index was selected as the prediction object.Firstly,the sample data was cleaned,stationary analyzed,and white noise analyzed.Secondly,the appropriate parameters were selected according to the Bayesian Information Criterion(BIC)principle,and the trend component characteristics were obtained by using ARIMA to conduct water quality predicting.Thirdly,the relationship between the precipitation and the TP index in themonitoring water field was analyzed by the K-means clusteringmethod,and the random incremental characteristics of precipitation on water quality changes were calculated.Finally,by combining with the trend component characteristics and the random incremental characteristics,the water quality prediction results were calculated.Compared with the ARIMA water quality prediction method,experiments showed that the proposed method has higher accuracy,and its Mean Absolute Error(MAE),Mean Square Error(MSE),and Mean Absolute Percentage Error(MAPE)were respectively reduced by 44.6%,56.8%,and 45.8%.
基金Publication costs are funded by the Ministry of Science and Technology,Taiwan,under Grant Numbers MOST 110-2221-E-153-010.
文摘Aquaculture has long been a critical economic sector in Taiwan.Since a key factor in aquaculture production efficiency is water quality,an effective means of monitoring the dissolved oxygen content(DOC)of aquaculture water is essential.This study developed an internet of things system for monitoring DOC by collecting essential data related to water quality.Artificial intelligence technology was used to construct a water quality prediction model for use in a complete system for managing water quality.Since aquaculture water quality depends on a continuous interaction among multiple factors,and the current state is correlated with the previous state,a model with time series is required.Therefore,this study used recurrent neural networks(RNNs)with sequential characteristics.Commonly used RNNs such as long short-term memory model and gated recurrent unit(GRU)model have a memory function that appropriately retains previous results for use in processing current results.To construct a suitable RNN model,this study used Taguchi method to optimize hyperparameters(including hidden layer neuron count,iteration count,batch size,learning rate,and dropout ratio).Additionally,optimization performance was also compared between 5-layer and 7-layer network architectures.The experimental results revealed that the 7-layer GRU was more suitable for the application considered in this study.The values obtained in tests of prediction performance were mean absolute percentage error of 3.7134%,root mean square error of 0.0638,and R-value of 0.9984.Therefore,thewater qualitymanagement system developed in this study can quickly provide practitioners with highly accurate data,which is essential for a timely response to water quality issues.This study was performed in collaboration with the Taiwan Industrial Technology Research Institute and a local fishery company.Practical application of the system by the fishery company confirmed that the monitoring system is effective in improving the survival rate of farmed fish by providing data needed to maintain DOC higher than the standard value.
基金the National Natural Science Foundation of China(No.51775185)Natural Science Foundation of Hunan Province(No.2022JJ90013)+1 种基金Intelligent Environmental Monitoring Technology Hunan Provincial Joint Training Base for Graduate Students in the Integration of Industry and Education,and Hunan Normal University University-Industry Cooperation.the 2011 Collaborative Innovation Center for Development and Utilization of Finance and Economics Big Data Property,Universities of Hunan Province,Open Project,Grant Number 20181901CRP04.
文摘At present,water pollution has become an important factor affecting and restricting national and regional economic development.Total phosphorus is one of the main sources of water pollution and eutrophication,so the prediction of total phosphorus in water quality has good research significance.This paper selects the total phosphorus and turbidity data for analysis by crawling the data of the water quality monitoring platform.By constructing the attribute object mapping relationship,the correlation between the two indicators was analyzed and used to predict the future data.Firstly,the monthly mean and daily mean concentrations of total phosphorus and turbidity outliers were calculated after cleaning,and the correlation between them was analyzed.Secondly,the correlation coefficients of different times and frequencies were used to predict the values for the next five days,and the data trend was predicted by python visualization.Finally,the real value was compared with the predicted value data,and the results showed that the correlation between total phosphorus and turbidity was useful in predicting the water quality.
文摘Recent trends in environmental management of water resource have enlarged the demand for predicting techniques that can provide reliable, efficient and accurate water quality. In this case study, the authors applied the Artificial Neural Networks (ANN) to estimate the water quality index on the Dong Nai River flowing through Dong Nai and Binh Duong provinces. The information and data including 10 water quality parameters of the Dong Nai River at 23 monitoring stations were collected during the recorded time period from 2010 to 2014 to build water quality prediction models. The results of the study demonstrated that the Water Quality Index (WQI) forecasted with GRNN was very significant and had high correlation coefficient (R2 = 0.974 and p = 0.0) compared to the real values of the WQI. Moreover, the ANN models provided better predicted values than the multiple regression models did.
基金Supported by the National Natural Science Foundation of China(Nos.41807247,41807229)the Special Fund for Shandong Post-doctoral Innovation Project。
文摘Artificial Neural Network(ANN)models have been extensively applied in the prediction of water resource variables,and Geographical Information System(GIS)includes powerful functions to visualize spatial data.In order to provide an efficient tool for environmental assessment and management that combines the advantages of these two modules,a GIS-based ANN water quality prediction system was developed in the present study.The ANN module and ArcGIS Engine module,along with a dynamic database,were imbedded in the system,which integrates water quality prediction via the ANN model and spatial presentation of the model results.The structure of the ANN model could be modified through the graphical user interface to optimize the model performance.The developed system was applied to a real case study for the prediction of the total phosphorus concentration in the Lake Champlain area.The prediction results were verified with the monitoring data,and the performance of the developed model was further evaluated through graphical techniques and quantitative statistical methods.Overall,the developed system provided satisfactory prediction results,and spatial distribution maps of the predicted results were obtained,which coincided with the monitored values.The developed GIS-based ANN water quality prediction system could serve as an efficient tool for engineers and decision makers.
文摘Chaos theory was introduced for water quality, prediction, and the model of water quality prediction was established by combining phase space reconstruction theory and BP neural network forecasting method. Through the phase space reconstruction, the one-dimensional water quality time series were mapped to be multi-dimensional sequence, which enriched the spatial information of water quality change and expanded mapping region of training samples of BP neural network. Established model of combining chaos theory and BP neural network were applied to forecast turbidity time series of a certain reservoir. Contrast to BP neural network method, the relative error and the mean squared error of the combined method had all varying degrees of lower. Results indicated the neural network model with chaos theory had the higher prediction accuracy, at the same time, it had better fault-tolerant capability and generalization performance .
基金financially supported by the National Key R&D Project(No.2022YFC3203203)the Shaanxi Province Science Fund for Distinguished Young Scholars(No.S2023-JC-JQ-0036).
文摘Neural networks(NNs)have been used extensively in surface water prediction tasks due to computing algorithm improvements and data accumulation.An essential step in developing an NN is the hyperparameter selection.In practice,it is common to manually determine hyperparameters in the studies of NNs in water resources tasks.This may result in considerable randomness and require significant computation time;therefore,hyperparameter optimization(HPO)is essential.This study adopted five representatives of the HPO techniques in the surface water quality prediction tasks,including the grid sampling(GS),random search(RS),genetic algorithm(GA),Bayesian optimization(BO)based on the Gaussian process(GP),and the tree Parzen estimator(TPE).For the evaluation of these techniques,this study proposed a method:first,the optimal hyperparameter value sets achieved by GS were regarded as the benchmark;then,the other HPO techniques were evaluated and compared with the benchmark in convergence,optimization orientation,and consistency of the optimized values.The results indicated that the TPE-based BO algorithm was recommended because it yielded stable convergence,reasonable optimization orientation,and the highest consistency rates with the benchmark values.The optimization consistency rates via TPE for the hyperparameters hidden layers,hidden dimension,learning rate,and batch size were 86.7%,73.3%,73.3%,and 80.0%,respectively.Unlike the evaluation of HPO techniques directly based on the prediction performance of the optimized NN in a single HPO test,the proposed benchmark-based HPO evaluation approach is feasible and robust.
基金supported by the National Key R&D Program of China(No.2021YFC1809001).
文摘Efficiently predicting effluent quality through data-driven analysis presents a significant advancement for consistent wastewater treatment operations.In this study,we aimed to develop an integrated method for predicting effluent COD and NH3 levels.We employed a 200 L pilot-scale sequencing batch reactor(SBR)to gather multimodal data from urban sewage over 40 d.Then we collected data on critical parameters like COD,DO,pH,NH_(3),EC,ORP,SS,and water temperature,alongside wastewater surface images,resulting in a data set of approximately 40246 points.Then we proposed a brain-inspired image and temporal fusion model integrated with a CNN-LSTM network(BITF-CL)using this data.This innovative model synergized sewage imagery with water quality data,enhancing prediction accuracy.As a result,the BITF-CL model reduced prediction error by over 23%compared to traditional methods and still performed comparably to conventional techniques even without using DO and SS sensor data.Consequently,this research presents a cost-effective and precise prediction system for sewage treatment,demonstrating the potential of brain-inspired models.
文摘Efficient water quality monitoring and ensuring the safety of drinking water by government agencies in areas where the resource is constantly depleted due to anthropogenic or natural factors cannot be overemphasized. The above statement holds for West Texas, Midland, and Odessa Precisely. Two machine learning regression algorithms (Random Forest and XGBoost) were employed to develop models for the prediction of total dissolved solids (TDS) and sodium absorption ratio (SAR) for efficient water quality monitoring of two vital aquifers: Edward-Trinity (plateau), and Ogallala aquifers. These two aquifers have contributed immensely to providing water for different uses ranging from domestic, agricultural, industrial, etc. The data was obtained from the Texas Water Development Board (TWDB). The XGBoost and Random Forest models used in this study gave an accurate prediction of observed data (TDS and SAR) for both the Edward-Trinity (plateau) and Ogallala aquifers with the R<sup>2</sup> values consistently greater than 0.83. The Random Forest model gave a better prediction of TDS and SAR concentration with an average R, MAE, RMSE and MSE of 0.977, 0.015, 0.029 and 0.00, respectively. For the XGBoost, an average R, MAE, RMSE, and MSE of 0.953, 0.016, 0.037 and 0.00, respectively, were achieved. The overall performance of the models produced was impressive. From this study, we can clearly understand that Random Forest and XGBoost are appropriate for water quality prediction and monitoring in an area of high hydrocarbon activities like Midland and Odessa and West Texas at large.
基金This research was supported by the National Natural Science Foundation of China(Nos.41977300 and 41907297)the Science and Technology Program of Guangzhou(China)(No.202002020055)the Fujian Provincial Natural Science Foundation(China)(No.2020I1001).
文摘Anaerobic process is regarded as a green and sustainable process due to low carbon emission and minimal energy consumption in wastewater treatment plants(WWTPs).However,some water quality metrics are not measurable in real time,thus influencing the judgment of the operators and may increase energy consumption and carbon emission.One of the solutions is using a soft-sensor prediction technique.This article introduces a water quality soft-sensor prediction method based on Bidirectional Gated Recurrent Unit(BiGRU)combined with Gaussian Progress Regression(GPR)optimized by Tree-structured Parzen Estimator(TPE).TPE automatically optimizes the hyperparameters of BiGRU,and BiGRU is trained to obtain the point prediction with GPR for the interval prediction.Then,a case study applying this prediction method for an actual anaerobic process(2500 m^(3)/d)is carried out.Results show that TPE effectively optimizes the hyperparameters of BiGRU.For point prediction of CODeff and biogas yield,R^(2)values of BiGRU,which are 0.973 and 0.939,respectively,are increased by 1.03%–7.61%and 1.28%–10.33%,compared with those of other models,and the valid prediction interval can be obtained.Besides,the proposed model is assessed as a reliable model for anaerobic process through the probability prediction and reliable evaluation.It is expected to provide high accuracy and reliable water quality prediction to offer basis for operators in WWTPs to control the reactor and minimize carbon emission and energy consumption.
基金supported by the National Natural Science Foundation of China (No. 41101180)the China National Water Pollution Control Program (No.2010ZX07102-006)
文摘Lake Fuxian is the largest deep freshwater lake in China. Although its average water quality meets Class I of the China National Water Quality Standard (CNWQS), i.e., GB3838-2002, monitoring data indicate that the water quality approaches the Class II threshold in some areas. Thus it is urgent to reduce the watershed load through the total maximum daily load (TMDL) program. A three-dimensional hydrodynamic and water quality model was developed for Lake Fuxian, simulating flow circulation and pollutant fate and transport. The model development process consists of several steps, including grid generation, initial and boundary condition configurations, and model calibration processes. The model accurately reproduced the observed water surface elevation, spatiotemporal variations in temperature, and total nitrogen (TN), total phosphorus (TP), and chemical oxygen demand (COD) concentrations, suggesting a reasonable numerical representation of the prototype system for further TMDL analyses. The TMDL was calculated using two interpretations of the water quality standards for Class I of the CNWQS based on the maximum instantaneous surface and annual average surface water concentrations. Analysis of the first scenario indicated that the TN, TP and COD loads should be reduced by 66%, 68% and 57%, respectively. Water quality was the highest priority; however, local economic development and cost feasibility for load reduction can pose significant issues. In the second interpretation, the model results showed that, under the existing conditions, the average water quality meets the Class I standard and therefore load reduction is unnecessary. Future studies are needed to conduct risk and cost assessments for realistic decision-making.
基金funded by National Natural Science Foundation of China(No.51908161&52100044)Guangdong Basic and Applied Basic Research Foundation(No.2019A1515010807)+1 种基金State Key Laboratory of Urban Water Resource and Environment(Harbin Institute of Technology)(2021TS30)Shenzhen Science and Technology Program(No.KQTD20190929172630447,KCXFZ20211020163404007 and GXWD20201230155427003-20200824100026001).
文摘Data-driven approaches that make timely predictions about pollutant concentrations in the effluent of constructed wetlands are essential for improving the treatment performance of constructed wetlands.However,the effect of the meteorological condition and flow changes in a real scenario are generally neglected in water quality prediction.To address this problem,in this study,we propose an approach based on multi-source data fusion that considers the following indicators:water quality indicators,water quantity indicators,and meteorological indicators.In this study,we establish four representative methods to simultaneously predict the concentrations of three representative pollutants in the effluent of a practical large-scale constructed wetland:(1)multiple linear regression;(2)backpropagation neural network(BPNN);(3)genetic algorithm combined with the BPNN to solve the local minima problem;and(4)long short-term memory(LSTM)neural network to consider the influence of past results on the present.The results suggest that the LSTM-predicting model performed considerably better than the other deep neural network-based model or linear method,with a satisfactory R^(2).Additionally,given the huge fluctuation of different pollutant concentrations in the effluent,we used a moving average method to smooth the original data,which successfully improved the accuracy of traditional neural networks and hybrid neural networks.The results of this study indicate that the hybrid modeling concept that combines intelligent and scientific data preprocessing methods with deep learning algorithms is a feasible approach for forecasting water quality in the effluent of actual engineering.