期刊文献+
共找到2,256篇文章
< 1 2 113 >
每页显示 20 50 100
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:3
1
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion Project(MR-SNWDP) China
下载PDF
Impact of the eastern water diversion from the south to the north project on the saltwater intrusion in the Changjiang Estuary in China 被引量:10
2
作者 XU Kun ZHU Jianrong GU Yuliang 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2012年第3期47-58,共12页
The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as ... The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as the sectional salt flux is calculated in the North Branch (NB),the South Branch (SB),the North Channel (NC),the South Channel (SC),the North Passage (NP) and the South Passage (SP),respectively.The net seaward water flux in the SB is reduced,and the net water flux spilling over from the NB to the SB is enhanced after the eastern WDP.Under the mean river discharge condition in the dry season,the net salt flux spilling over from the NB to the SB is increased by 2.09 t/s and 0.52 t/s during the spring and neap tides,respectively,due to the eastern WDP.The saltwater intrusion in the Changjiang Estuary is enhanced by the eastern WDP.Compared with that during the spring tide,the net water diversion ratio during the neap tide in the NC is smaller,and thus the enhancement of the saltwater intrusion by the eastern WDP is smaller in the NC,and larger in the NP and the SP.The tidally averaged surface salinity at the water intakes of the Dongfengxisha Reservoir,the Chenhang Reservoir and the Qingcaosha Reservoir rises both during the spring and neap tides. 展开更多
关键词 eastern water diversion from the south to the north project saltwater intrusion Changjiang Estuary numerical calculation the water resource
下载PDF
Optimization and coordination of South-to-North Water Diversion supply chain with strategic customer behavior 被引量:4
3
作者 Zhi-song CHEN Hui-min WANG 《Water Science and Engineering》 EI CAS 2012年第4期464-477,共14页
The South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, th... The South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, this study defined the supply chain system for the SNWD Project, considering the actual project conditions, built a decentralized decision model and a centralized decision model with strategic customer behavior (SCB) using a floating pricing mechanism (FPM), and constructed a coordination mechanism via a revenue-sharing contract. The results suggest the following: (1) owing to water shortage supplements and the excess water sale policy provided by the FPM, the optimal ordering quantity of water resources is less than that without the FPM, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without the FPM; (2) wholesale pricing and supplementary wholesale pricing with SCB are higher than those without SCB, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without SCB; and (3) considering SCB and introducing the FPM help increase the optimal profits of the whole supply chain, supplier, and external distributor, and improve the efficiency of water resources usage. 展开更多
关键词 south-to-north water diversion supply chain strategic customer behavior floatingpricing mechanism
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
4
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion Project reliability model management chain parallel connection series connection
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
5
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion Project project portfolio critical chain
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
6
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion Project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
7
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion Project River regime water environment Mathematical model
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
8
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer Project
下载PDF
The variation of DOM during long distance water transport by the China South to North Water Diversion Scheme and impact on drinking water treatment 被引量:1
9
作者 Hankun Yang Yujuan Li +6 位作者 Hongyu Liu Nigel J.D.Graham Xue Wu Jiawei Hou Mengjie Liu Wenyu Wang Wenzheng Yu 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2024年第5期85-100,共16页
In this study,samples were taken from three locations,upstream to downstream,along the central route project of the China South to North Water Diversion(SNWD)scheme in summer and winter.These were used to reveal the v... In this study,samples were taken from three locations,upstream to downstream,along the central route project of the China South to North Water Diversion(SNWD)scheme in summer and winter.These were used to reveal the variations of dissolved organic matter(DOM)during the water transfer process,and the effects of these variations on drinking water treatment and disinfection by-products formation potential(DBPs-FP).The results showed that polysaccharides accumulate in summer and reduce in winter with flow distance,which has an important effect on the overall properties of DOM,as well as on the performance of coagulation,ultrafiltration,and the formation of DBPs.Humic substances,and their hydrophilic content,also increased in summer and decreased in winter with flow distance.In contrast,the concentration of small organic substances(MW≤1000 Da)increased in both summer and winter with flow distance,which affected both nanofiltration(NF)membrane fouling and DBPs-FP.The results provide a useful case study of spatial and temporal changes in raw water DOM during long distance water transfer and their impact on the treatment and quality of drinking water from the SNWD. 展开更多
关键词 Long-distance water transfer The China south to north water diversion Scheme COAGULATION Membrane filtration Disinfection by-products
原文传递
Application of SEDEA to evaluation of degree of harmony between water resources and economic development 被引量:1
10
作者 Jun MA Chui-yong ZHENG 《Water Science and Engineering》 EI CAS 2011年第1期110-120,共11页
This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North W... This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North Water Diversion Project (SNWDP). For this evaluation, a super-efficiency DEA (SEDEA) model was developed based on the super-efficiency method. To verify the applicability of the SEDEA model, both the SEDEA model and a normal-efficiency DEA (NEDEA) model were used to evaluate the degree of harmony between water resources and economic development of typical cities in the SNWDP water conservancy area. The results show that the SEDEA model ranks the degree of harmony of typical cities more efficiently than the NEDEA model, and thus can better evaluate the degree of harmony between water resources and economic development of different cities than the NEDEA model. Furthermore, the SEDEA model can be applied as an operational research tool in regional water resources management. 展开更多
关键词 degree of harmony super-efficiency DEA model water conservancy area south-to-north water diversion Project
下载PDF
Computing payment for ecosystem services in watersheds: An analysis of the Middle Route Project of South-to-North Water Diversion in China 被引量:12
11
作者 Zhengju Dong Yan Yan +5 位作者 Jing Duan Xiao Fu Qingrong Zhou Xiang Huang Xiangen Zhu Jingzhu Zhao 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2011年第12期2005-2012,共8页
Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechani... Payment for ecosystem services (PES) has attracted considerable attention as an economic incentive for promoting natural resource management recently. As emphasis has been placed on using the incentive-based mechanism by the central government, rapid progress on PES research and practice has been achieved. However PES still faces many difficulties. A key issue is the lack of a fully-fledged theory and method to clearly define the design scope, accounting and feasibility of PES criteria. An improved watershed criteria model was developed in light of research on PES practices in China, investigations on the water source area for the Middle Route Project of South-to-North Water Diversion and ecosystem services outflows theory. The basic principle of assessment is the direct and opportunity cost for ecological conservation and environmental protection in the water source area deduct nationally-financed PES and internal effect. Then the scope and the criteria methods were determined, and internal effect was put forward to define benefits brought from water source area. Finally, Shiyan City, which is the main water source area for the Project of Water Diversion, was analyzed by this model and its payment was calculated. The results showed that: (1) during 2003–2050, the total direct cost and opportunity cost would reach up to 262.70 billion and 256.33 billion Chinese Yuan (CNY, 2000 constant prices), i.e., 50.61% and 49.38% of total cost, respectively; (2) Shiyan City would gain 0.23, 0.06 and 0.03 CNY/m3 in 2014–2020, 2021–2030, and 2031–2050, respectively. 展开更多
关键词 waterSHED payment for ecosystem services ecosystem services cost-benefit analysis Middle Route Project of south-to- north water diversion
原文传递
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
12
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern Route south-to-north water diversion Project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
南水北调西线工程水源区可调水量“十问” 被引量:1
13
作者 胡鹏 王浩 +13 位作者 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 《中国工程科学》 CSCD 北大核心 2024年第2期210-223,共14页
南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区... 南水北调西线工程是我国“四横三纵”国家水网主骨架尚待建设的最后一环,而水源区可调水量是西线工程规划论证面临的焦点和难点问题。本文从水资源本底条件与演变趋势,生态环境与经济社会发展需水,调蓄水库与输水工程规模,调水对水源区及其下游水资源开发利用、水生态环境、水力发电、航运等方面影响的角度,提出了与水源区可调水量相关的10个问题;以长江上游分布式水文模型为基础,建立了南水北调西线工程水源区可调水量模拟分析模型,力图系统、定量地回答所提问题。本文的主要研究结论有:在仅考虑满足水源区河道内外生态环境和经济社会需水的前提下,“上线+下线”组合方案多年平均可调水量为1.59×10^(10)m^(3),“完全下线”方案在建设岗托水库进行联调时,多年平均可调水量将达到1.74×10^(10)m^(3);在综合考虑调水对水源区水平衡、水力发电和航运影响及其可接受程度后,南水北调西线水源区可调水量为1.22×10^(10)~1.26×10^(10)m^(3)。长远来看,应谋划西南片区水网与国家水网主骨架、“大动脉”的连接与融合,在减小南水北调西线工程调水影响的同时,提高南水北调西线工程的整体供水能力以及对气候变化等外部条件的适应性。 展开更多
关键词 南水北调西线工程 水源区 可调水量 生态需水 跨流域调水
下载PDF
水网布局下黄河流域应对极端枯水的关键科学问题 被引量:2
14
作者 王煜 彭少明 +1 位作者 郑小康 尚文绣 《水科学进展》 EI CAS CSCD 北大核心 2024年第1期11-23,共13页
变化环境下极端气象水文事件频发,长江、黄河面临同枯风险。在国家水网建设背景下,为提高长江、黄河同枯的极端不利情景下黄河流域水资源安全保障能力,本文分析了长江、黄河两大流域水资源安全面临的现实问题,识别了变化环境下大型流域... 变化环境下极端气象水文事件频发,长江、黄河面临同枯风险。在国家水网建设背景下,为提高长江、黄河同枯的极端不利情景下黄河流域水资源安全保障能力,本文分析了长江、黄河两大流域水资源安全面临的现实问题,识别了变化环境下大型流域枯水遭遇—水危机形成—跨流域调水潜力—多线路成网互济—极端枯水下水资源安全保障中亟需破解的关键科学问题,构建了水网布局下黄河流域应对极端枯水的总体研究框架,提出该领域重点研究方向包括:变化环境下长江、黄河极端枯水遭遇规律与空间变异机制,水危机风险多链路传导与复合影响定量评估,极端枯水下跨流域调水挖潜增供,长江和黄河跨流域联合调配与多线路互济精细化调控、极端枯水下流域水资源韧性提升优化调控等。 展开更多
关键词 极端枯水 枯水遭遇 水危机 跨流域水资源调配 水资源系统韧性 南水北调 黄河 长江
下载PDF
北京市南水北调配套工程调蓄工程勘察关键技术
15
作者 张琦伟 刘晓锋 +3 位作者 杨良权 姚旭初 张如满 袁鸿鹄 《水利水电技术(中英文)》 北大核心 2024年第S01期97-102,共6页
北京市南水北调配套工程调蓄工程是北京市“26213”供水格局的重要组成部分,工程分布于北京市西、北、南不同地区,场地建设环境条件复杂,地层结构分布及组合多样,水文地质条件复杂,工程建设面临诸多地质问题及难题。工程勘察成果全面、... 北京市南水北调配套工程调蓄工程是北京市“26213”供水格局的重要组成部分,工程分布于北京市西、北、南不同地区,场地建设环境条件复杂,地层结构分布及组合多样,水文地质条件复杂,工程建设面临诸多地质问题及难题。工程勘察成果全面、涉及面广、涵盖工程勘察综合类的全专业领域,完成专业全面的技术成果文件与研究报告60余册,发表学术论文50余篇,取得七大方面技术创新、30余个技术创新点。勘察总体工作思路、技术路线、研发的创新技术、利用的先进手段等方面具有实践推广价值,特别是对城市复杂地质环境条件下建设城市供水调蓄工程具有借鉴作用。 展开更多
关键词 调蓄工程 南水北调 勘察 综合物探 复杂地质环境
下载PDF
气候变化对南水北调西线工程的影响及建议
16
作者 王国庆 虞畅 +3 位作者 金君良 宁忠瑞 王云 孙高霞 《人民黄河》 CAS 北大核心 2024年第9期60-66,共7页
南水北调工程是国家水网的重要组成部分,其西线工程建设是缓解我国西北、华北地区水资源短缺的重要举措。气候变化下西线工程引水区和受水区水资源情势直接关系到工程的规划建设与运行方式。基于历史实测资料和气候模式情景,采用数理统... 南水北调工程是国家水网的重要组成部分,其西线工程建设是缓解我国西北、华北地区水资源短缺的重要举措。气候变化下西线工程引水区和受水区水资源情势直接关系到工程的规划建设与运行方式。基于历史实测资料和气候模式情景,采用数理统计与水文模拟相结合的途径分析了气候变化对南水北调西线工程引水区和受水区水资源的影响。结果表明:1)1961—2020年西线调水区和受水区气候变化以暖湿化为主要特征,调水区年径流量整体稳定略增,受水区年径流量显著性减少。2)未来中期(2035年)和远期(2050年),调水区和受水区气温继续显著升高,降水多呈非显著增加;未来中期、远期调水区年径流量较基准期(1961—2000年)分别增加1.42%和2.08%,受水区年径流量分别减少1.02%和0.28%。3)未来气候变化下,调水区年径流量相对稳定,能够满足调水需求,受水区年径流量略减,对跨流域调水需求有所增加。为确保南水北调西线工程的长期稳定运行,建议加强气候变化及其影响的不确定性研究,制定科学合理的应对措施,以应对未来可能的水资源短缺的挑战。 展开更多
关键词 气候变化 RCCC-WBM模型 水资源 南水北调西线工程
下载PDF
综合水价内涵、形成机制及实施路径探析
17
作者 秦长海 武文红 +2 位作者 何凡 姜珊 王浩 《中国水利》 2024年第10期20-24,共5页
在我国南水北调工程受水区水价管理问题分析的基础上,考虑我国南水北调受水区推进综合水价改革的现实需求,参考电价和天然气价格形成机制,系统解析了综合水价内涵及形成机制,明确综合水价具有区域水资源一体化管理、各类水源成本统一核... 在我国南水北调工程受水区水价管理问题分析的基础上,考虑我国南水北调受水区推进综合水价改革的现实需求,参考电价和天然气价格形成机制,系统解析了综合水价内涵及形成机制,明确综合水价具有区域水资源一体化管理、各类水源成本统一核算和用户终端水价差异化核定特征,提出综合水价需具备工程一体化、管理一体化、监管制度化的实施基础,通过供给侧一体化定价、用户侧差别化定价和管理侧梯次化推进落实综合水价改革,最后提出了推进综合水价改革的相关建议,为我国综合水价改革提供技术支撑,并服务于相关决策的制定。 展开更多
关键词 水资源 综合水价 南水北调 机制 水资源费(税)
下载PDF
局部降温对输水渠道水华抑制的影响分析
18
作者 张雅卓 宋芷萱 +2 位作者 姚烨 闫琳琳 徐楚涵 《水资源与水工程学报》 CSCD 北大核心 2024年第2期130-138,148,共10页
南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象... 南水北调中线工程自通水以来,发挥着巨大的社会和经济效益,已成为京津地区的主力水源。中线工程输水的水质理化指标相对稳定,但局部渠段存在藻类异常增殖现象,有水华爆发的风险。针对出现的藻类异常增殖问题,在通冷风这一改变局部气象条件的工程措施基础上,建立了澎河—沙河渡槽段平面二维水动力和水质模型,研究了通风位置、通风温度和通风时长等因素对输水渠道水温和藻类的影响。研究表明:水温和叶绿素a浓度均与通风位置、通风温度和通风时长有关,通风温度越低、通风时长越长,平均水温和叶绿素a浓度下降幅度越大,平均水温最高可下降约2℃,叶绿素a浓度最大可降低约54.5%,且仅上游和全渠段通风均可有效降低水温和抑制藻类生长,仅下游通风对水温和藻类的影响较小。因此,采取局部降温的方式可以起到一定的降低叶绿素a浓度的作用,综合考虑藻类抑制效果和工程成本,在水华易爆发渠段的上游通冷风是行之有效的工程措施。 展开更多
关键词 输水渠道水华 局部降温 通冷风 叶绿素A 水温 数值模拟 南水北调中线工程
下载PDF
南水北调中线冬季冰情变化特征及输水能力提升策略研究
19
作者 郭新蕾 潘佳佳 +3 位作者 苑希民 王军 罗秋实 苏霞 《水利学报》 EI CSCD 北大核心 2024年第4期389-402,共14页
南水北调中线工程冰期输水能力受限已成为制约工程安全运行和社会效益发挥的巨大障碍。认识和辨析通水以来中线干渠冬季水温冰情演变规律及影响机理,是中线干渠冬季输水能力提升亟需解决的关键问题。本文基于2011—2023年中线干渠连续1... 南水北调中线工程冰期输水能力受限已成为制约工程安全运行和社会效益发挥的巨大障碍。认识和辨析通水以来中线干渠冬季水温冰情演变规律及影响机理,是中线干渠冬季输水能力提升亟需解决的关键问题。本文基于2011—2023年中线干渠连续12个冬季的气象、水力、冰情等原型观测资料,分析了中线干渠水温冰情时空分布本底和特征规律,明晰了影响中线干渠冰凌生消的关键因素,针对性提出了冬季输水能力提升的相关应对策略。分析表明:通水以来冰情发生的范围和时间相比理论预想偏小、偏短,冰凌影响区为七里河倒虹吸至北拒马河暗渠段,冰塞风险区为滹沱河倒虹吸至北拒马河暗渠段,多年平均冰厚15 cm,历史极端冰塞厚2.9 m,冰凌壅水最高值0.73 m;干渠冬季水温由南向北递减,依次出现岸冰、流冰和冰盖,日均气温转负后相应的断面平均测量水温在2.5、1.0和0.25℃左右,且沿程水温下降速率与流量和气温呈负相关,即增大输水流量可减缓水温下降速度;影响冰凌生消的关键因素是气温、流量、太阳辐射和风速,典型年如2016年的严重冰情与1月低累计负积温、大输水流量和短时寒潮叠加有关,漕河等渡槽失温快产冰量大与风速密切相关。基于上述分析,未来可考虑结合气象、水情、冰情实时监测和智能预警预报,建立水温-水量-水力协同调控和动态调度技术体系,重点从缩短冰期输水时长、降低冰情影响范围、优化关键控制指标和挖潜渠道防冰塞性能等多方面全面提升南水北调中线工程冬季输水能力。 展开更多
关键词 水温冰情 时空分布 南水北调中线 冬季防凌 输水能力
下载PDF
多源多特征集成的南水北调工程丹江库区湿地时空格局演变
20
作者 王晓峰 马娟 +3 位作者 周继涛 尧文洁 涂又 王筱雪 《地球科学与环境学报》 CAS 北大核心 2024年第5期569-583,共15页
丹江口水库是中国南水北调工程的关键水源区。随着城镇化发展以及大坝二次建设,库区湿地生态系统变化显著,亟需湿地生态科学监测。以丹江库区为例,依托Google Earth Engine(GEE)平台,首先采用已有土地覆盖数据集生成湿地样本集,其次整合... 丹江口水库是中国南水北调工程的关键水源区。随着城镇化发展以及大坝二次建设,库区湿地生态系统变化显著,亟需湿地生态科学监测。以丹江库区为例,依托Google Earth Engine(GEE)平台,首先采用已有土地覆盖数据集生成湿地样本集,其次整合Landsat影像、DEM等数据构建多源特征集合,并基于Jeffries-Matusita(JM)距离进行特征优选,使用随机森林(RF)算法实现了1985~2023年丹江库区湿地制图。结果表明:①本文提出的样本采集流程可有效提高样本质量,为长时序分类样本采集提供参考;②湿地分类特征优选后特征数由37个减为27个,分类总体精度变化不大,优选后的特征应用于丹江库区湿地分类的平均总体精度(OA)以及平均数量和分配分歧指数(QADI)分别为89.53%和0.0802,说明特征优选有效减少信息冗余,提高影像分类效率;③1985~2023年,丹江库区湿地面积呈波动增加趋势,从1985年的17839.85 ha扩大到2023年的28872.48 ha,面积增长38.12%。总体来说,丹江库区湿地生态系统呈现出逐步恢复和优化的良好态势。 展开更多
关键词 遥感监测 湿地分类 特征优选 随机森林 Landsat影像 时空特征 丹江口水库 南水北调工程
下载PDF
上一页 1 2 113 下一页 到第
使用帮助 返回顶部