期刊文献+
共找到3,317篇文章
< 1 2 166 >
每页显示 20 50 100
Analysis of Water Insulating Effect of Compound Water-Resisting Key Strata in Deep Mining 被引量:11
1
作者 FENG Mei-mei MAO Xian-biao BAI Hai-bo MIAO Xie-xing 《Journal of China University of Mining and Technology》 EI 2007年第1期1-5,共5页
The problem of water preservation in mining and the prevention of water-bursts has been one of the more important issues in deep mining. Based on the concept of water-resisting key strata, the mechanics model of the k... The problem of water preservation in mining and the prevention of water-bursts has been one of the more important issues in deep mining. Based on the concept of water-resisting key strata, the mechanics model of the key strata is established given the structural characteristics and the mechanical properties of the roof rock layers of the working face in a particular coal mine. Four other models were derived from this model by rearranging the order of the layers in the key strata. The distribution characteristics of stress, deformation, pore pressure and the flow vector of all the models are computed using the analytical module of fluid-structure interaction in the FLAC software and the corresponding risks of a water-burst are analyzed. The results indicate that the water-insulating ability of the key strata is related to the arrangement of soft and hard rocks. The water-insulating ability of the compound water-resisting key strata (CWKS) with a hard-hard-soft-hard-soft compounding order is the best under the five given simulated conditions. 展开更多
关键词 deep mining water-resisting key strata fluid-structure interaction numerical simulation mechanical analysis
下载PDF
Structural motion of water-resisting key strata lying on overburden 被引量:4
2
作者 PU Hai MIAO Xie-xing +1 位作者 YAO Bang-hua TIAN Mu-jun 《Journal of China University of Mining and Technology》 EI 2008年第3期353-357,共5页
Water-preserved mining is one of the important parts of the ‘Green Mining’ technological system. The purpose of wa-ter-preserved mining is to prevent water from bursting out in coal mines and thus to protect water r... Water-preserved mining is one of the important parts of the ‘Green Mining’ technological system. The purpose of wa-ter-preserved mining is to prevent water from bursting out in coal mines and thus to protect water resources. The principle of wa-ter-resisting key strata (WKS) is proposed to establish a model capable of guiding and developing water-preserved mining technol-ogy. The experimental model of the WKS is constructed following requirements of the Data Image Correlative Method (DICM). Five experimental schemes are designed according to different combined patterns of the WKS. The water-resisting performance of the WKS is analyzed from observation of structural stability. All of them provide referential value for water-preserved mining. 展开更多
关键词 water-preserved mining water-resisting key strata (WKS) digital image correlative method (DICM) water-inrush in coal mine
下载PDF
Water-resisting ability of cemented broken rocks 被引量:3
3
作者 Yu Bangyong Chen Zhanqing Yu Linli 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期449-454,共6页
Using the self-designed testing system, the seepage tests for cemented broken rocks were conducted, and the impact of different factors on water-resisting ability was analyzed. The results show that(1) seepage process... Using the self-designed testing system, the seepage tests for cemented broken rocks were conducted, and the impact of different factors on water-resisting ability was analyzed. The results show that(1) seepage process of the cemented broken rocks can be divided into two categories: in one category, seepage instability occurs after a period of time, in the other, the permeability decreases slowly and tends to be stable,and seepage instability does not occur;(2) cementing performance of cementing agent and grain size distribution are the decisive factors for water-resisting ability, with the increase of cementing performance and the mass percentage of large grains, the water-resisting ability of the specimen strengthens;(3)aggregate type has little effect on seepage stability, for the specimens with different aggregate types,the permeability and the duration of seepage instability have small difference;(4) initial porosity has a certain effect on the water-resisting ability of the specimen, but has no decisive role. With the increase of the initial porosity, the duration of seepage instability decreases. 展开更多
关键词 Cemented broken rocks Permeability water-resisting ability Seepage instability
下载PDF
Pore structure characteristics of the relative water-resisting layer on the top of the Ordovician in Longgu Coal Mine 被引量:3
4
作者 Rong Huren Bai Haibo 《International Journal of Mining Science and Technology》 SCIE EI 2014年第5期657-661,共5页
In order to study the permeability and water-resisting ability of the strata on the top of the Ordovician in Longgu Coal Mine, this paper tested the permeability and porosity of the strata, investigated the fracture a... In order to study the permeability and water-resisting ability of the strata on the top of the Ordovician in Longgu Coal Mine, this paper tested the permeability and porosity of the strata, investigated the fracture and pore structure features of the strata, and identified the main channels which govern the permeability and water-resisting ability of the strata. The permeability of the upper, central and lower strata shows as 2.0504 × 10^-3-2.782762× 10^-3, 4.1092 × 10^-3 -7.3387 × 10^-3 and 2.0891 ×10^-3-3.2705 × 10-3 μm^2, respectively, and porosity of that is 0.6786-0.9197%, 0.3109-0.3951% and 0.9829-1.8655%, respectively. The results indicate that: (I) the main channels of the relative water-resisting layer are the pore throats with a diameter more than 6 μm; (2) the major proportion of pore throats in the vertical flow channel and the permeability first increases and then sharply decreases; (3) the fractures occurring from the top to 20 m in depth of the strata were filled and there occurred almost no fracture under the depth of 40 m; and (4) the ratio of turning point of the main flow channel in the strata on top of Ordovician can be used to confirm the thickness of filled water-resisting lavers. 展开更多
关键词 Relative water-resisting layer Filling effect Main channels of seepage Pore structure
下载PDF
Numerical analysis of the destruction of water-resisting strata in a coal seam floor in mining above aquifers 被引量:2
5
作者 Jiang Zhihai 《Mining Science and Technology》 EI CAS 2011年第4期537-541,共5页
With the increase in mining depth many mining areas in China have entered a period necessitating mining above aquifers. Production safety in coal mines in northern China is under serious threat from Ordovician karst w... With the increase in mining depth many mining areas in China have entered a period necessitating mining above aquifers. Production safety in coal mines in northern China is under serious threat from Ordovician karst water on coal seam floors, in order to analyze the destruction of water-resisting strata in floors of coal seams being mined and to achieve safe mining above deep aquifers, we established a numerical model of water-resisting strata, considering the structural characteristics and mechanical properties of a floor layered with hard and soft rock. We simulated the distribution characteristics of deformation, failure and seepage using the analytical module of fluid-structure interaction of FLAt:. We also obtained the corresponding stress distribution, deformation and flow vectors. Our results indi- cate that: (1) the advance of the working face causes water-resisting strata in goaf floors to form a deep double-clamped beam, subject to homogeneous loading at the bottom; (2) the two sides of the rock beam are subject 1~0 shear failure; (3) both sides of the rock seam at the bottom of the water-resisting strata are subject to tension and the greater the working face advance, the more serious the failure; C4) the original balance of the stress and seepage fields are broken and redistributed due to mining activities, especially the interaction of the abutment pressure in both sides of the goal; the lateral pressure on the goal floor and the water pressure on the floor of the aquifer promote floor heave and shear failure on both sides of the floor, forming a water-inrush passage. Our study results can provide references for the mechanism of water-inrush on mine floors. 展开更多
关键词 Mining above aquifer water-resisting strata in floors Numerical simulation Seepage fieldStress field
下载PDF
Water-resistant organic thermoelectric generator with >10μW output 被引量:2
6
作者 Shinichi Hata Kanto Maeshiro +6 位作者 Misaki Shiraishi Soichiro Yasuda Yuta Shiozaki Koudai Kametani Yukou Du Yukihide Shiraishi Naoki Toshima 《Carbon Energy》 SCIE CSCD 2023年第4期55-67,共13页
Flexible p–n thermoelectric generator(TEG)technology has rapidly advanced with power enhancement and size reduction.To achieve a stable power supply and highly efficient energy conversion,absolute chemical stability ... Flexible p–n thermoelectric generator(TEG)technology has rapidly advanced with power enhancement and size reduction.To achieve a stable power supply and highly efficient energy conversion,absolute chemical stability of n-type materials is essential to ensuring large temperature differences between device terminals and ambient stability.With the aim of improving the long-term stability of the n-type operation of carbon nanotubes(CNTs)in air and water,this study uses cationic surfactants,such as octylene-1,8-bis(dimethyldodecylammonium bromide)(12-8-12),a gemini surfactant,to stabilize the nanotubes in a coating,which retains the n-doped state for more than 28 days after exposure to air and water in experiments.TEGs with 10 p-n units of 12-8-12/CNT(n-type)and sodium dodecylbenzene sulfonate/CNT(p-type)layers are manufactured,and their water stability is evaluated.The initial maximum output of 16.1μW(75 K temperature difference)is retained after water immersion for 40 days without using a sealant to prevent TEG module degradation.The excellent stability of these CNT-based TEGs makes them suitable for underwater applications,such as battery-free health monitoring and information gathering systems,and facilitates the development of soft electronics. 展开更多
关键词 gemini surfactant n-type carbon nanotube surfactant doping thermoelectric properties water-resistant generators water stability
下载PDF
重庆官栈河大桥主桥主墩基础锁口钢管桩围堰加固 被引量:1
7
作者 钱骥 荚瑞馨 +1 位作者 宋世杰 杨纪鹏 《桥梁建设》 EI CSCD 北大核心 2024年第1期148-154,共7页
重庆官栈河大桥主桥为(62+110+62)m三跨连续刚构桥,主墩基础采用锁口钢管桩围堰施工。围堰施工正常水位+325.300 m,施工期控制水位+330.500 m。在该桥主墩围堰完成四周锁口钢管桩插打及前4道内支撑安装后,因极端天气原因,长寿湖水位上涨... 重庆官栈河大桥主桥为(62+110+62)m三跨连续刚构桥,主墩基础采用锁口钢管桩围堰施工。围堰施工正常水位+325.300 m,施工期控制水位+330.500 m。在该桥主墩围堰完成四周锁口钢管桩插打及前4道内支撑安装后,因极端天气原因,长寿湖水位上涨到+332.200 m,危及围堰安全。为解决钢管桩围堰的安全问题,提出采用水下施工内支撑的加固方案。待围堰内部水头与外部保持一致后,将已经插打的锁口钢管桩加高至标高+334.000 m,拆除已安装好的4道内支撑,重新安装6道内支撑。采用MIDAS Civil软件分别建立加固前、后钢管桩围堰结构有限元模型,分析钢管桩及内支撑的受力安全与稳定性。结果表明:施工控制水位+330.500 m下,围堰结构最大正应力由加固前的162.6 MPa下降到加固后的82.3 MPa,下降了49.3%;承载水位可从施工控制水位+330.500 m增加到目标控制水位+333.500 m,且强度和刚度等均留有一定储备。水下施工内支撑的加固方案可提升围堰的承载能力。该桥围堰加固后整体受力效果良好,已顺利完成承台浇筑施工。 展开更多
关键词 刚构桥 锁口钢管桩围堰 加固 有限元法 桥梁施工
下载PDF
强涌潮区管袋围堰施工安全风险仿真研究 被引量:1
8
作者 江新 赵力 张腾飞 《人民长江》 北大核心 2024年第5期163-171,共9页
强涌潮区的水域环境复杂多变,这极大增加了管袋围堰施工安全管理的难度。为确定强涌潮区管袋围堰施工从清基到维护阶段的安全管控重点,首先利用系统理论过程分析法(STPA)对施工安全风险因素进行定性分析,从人员、物资、管理、技术、环境... 强涌潮区的水域环境复杂多变,这极大增加了管袋围堰施工安全管理的难度。为确定强涌潮区管袋围堰施工从清基到维护阶段的安全管控重点,首先利用系统理论过程分析法(STPA)对施工安全风险因素进行定性分析,从人员、物资、管理、技术、环境5个维度构建了强涌潮区管袋围堰施工安全风险指标体系;然后建立系统动力学(SD)演化模型,并运用网络层次分析法(ANP)确定各指标权重;最后结合工程实例进行模拟仿真。结果表明:随着工程推进以及对安全投入的逐步增加,管袋围堰施工安全风险水平呈现出先大幅上升,后逐步下降,最终趋于平缓的趋势;人员、物资是清基和吹填期影响施工安全的主要因素,而在排水和维护期,环境、管理是主要影响因素;人员、管理和环境这三因素对安全投入变化更为敏感。建议在施工过程中重视不同阶段之间的管控重点差异,及时转换管理策略并采取针对性措施以有效降低施工安全风险。 展开更多
关键词 施工安全风险 管袋围堰 强涌潮区 系统理论过程分析(STPA) 系统动力学(SD)
下载PDF
TRD工法在赣江尾闾围堰防渗工程中的应用
9
作者 王海东 姜命强 赵永磊 《中国建筑防水》 2024年第4期30-33,40,共5页
赣江下游尾闾综合整治工程4支枢纽采用TRD工法对防渗墙进行施工,并针对重难点区段调整了施工工艺,该做法克服了地质条件复杂、砂卵砾石地层厚度大、防渗墙深度大等不利因素的影响,施工效率高且安全环保,取得了良好的防渗效果。
关键词 TRD工法 围堰 防渗墙 砂砾石地层
下载PDF
钢板桩围堰结构设计及稳定性分析
10
作者 袁淑霞 裴龙瑶 +3 位作者 齐文娇 吴松 张宇鹏 段育轩 《科学技术与工程》 北大核心 2024年第8期3155-3163,共9页
钢板桩围堰适用于深水、滩涂等复杂地质,对钢板桩围堰打桩及工作过程进行了稳定性分析。采用Fluent软件对不同工况下打桩过程进行流体动力学研究并计算其动载荷。并对钢板桩稳定性进行了校核。提出流体动力学和固体力学相结合的打桩过... 钢板桩围堰适用于深水、滩涂等复杂地质,对钢板桩围堰打桩及工作过程进行了稳定性分析。采用Fluent软件对不同工况下打桩过程进行流体动力学研究并计算其动载荷。并对钢板桩稳定性进行了校核。提出流体动力学和固体力学相结合的打桩过程稳定性分析方法。采用ANSYS屈曲分析外压载荷作用下围堰整体结构的稳定性。结果表明:动载荷受幂律指数、稠度系数及静载荷的综合影响,稠度系数与流体黏度呈线性关系,幂律指数体现了流体的非牛顿性,而不同载荷作用下流体黏度也会发生变化,需结合屈曲分析结果、打桩时间等综合选择适宜打桩力。采用特征值屈曲分析和非线性屈曲分析得到的围堰临界失稳应力较为接近,非线性屈曲分析考虑了材料的非线性,包含塑性变形成分,因此临界失稳应力更大。 展开更多
关键词 围堰 非牛顿流体 幂律指数 稠度系数 屈曲分析
下载PDF
深水薄覆盖层区大型双壁钢围堰施工技术
11
作者 穆清君 李贤仰 +1 位作者 杨武 潘传宗 《中国港湾建设》 2024年第6期83-90,共8页
以长沙香炉洲大桥索塔墩基础施工为依托,综合考虑桥址区的地质、水文、沿岸地形地貌、吊装能力等因素,对双壁钢围堰制造、下水、浮运、精确定位、着床等施工关键技术进行研究,提出竖向分节、水平成环接高、整体浮运、平台拉锚系统精确... 以长沙香炉洲大桥索塔墩基础施工为依托,综合考虑桥址区的地质、水文、沿岸地形地貌、吊装能力等因素,对双壁钢围堰制造、下水、浮运、精确定位、着床等施工关键技术进行研究,提出竖向分节、水平成环接高、整体浮运、平台拉锚系统精确定位大型钢围堰施工工艺。工程实践证明,提出的深水薄覆盖层场域钢围堰精确定位施工成套技术是成功的,可为类似工程提供参考。 展开更多
关键词 深水 薄覆盖层 桥梁基础 双壁钢围堰 定位系统
下载PDF
嵌岩低桩承台锁口钢管桩围堰设计与施工技术 被引量:2
12
作者 别士勇 李江 安浩兵 《世界桥梁》 北大核心 2024年第2期43-49,共7页
昌九高铁扬子洲赣江公铁大桥西支主桥为(48+144+320+144+48)m无砟轨道钢箱桁组合梁斜拉桥。桥塔墩位于通航河道内,桥位处河床覆盖层浅,基岩强度高,基础由大直径钻孔桩和矩形嵌岩低桩承台组成,承台采用锁口钢管桩围堰施工方案。G33号主... 昌九高铁扬子洲赣江公铁大桥西支主桥为(48+144+320+144+48)m无砟轨道钢箱桁组合梁斜拉桥。桥塔墩位于通航河道内,桥位处河床覆盖层浅,基岩强度高,基础由大直径钻孔桩和矩形嵌岩低桩承台组成,承台采用锁口钢管桩围堰施工方案。G33号主墩围堰平面设计尺寸54.56 m×28.52 m,锁口钢管桩采用Q345B材质∅1020 mm螺旋钢管,长28 m,钢管桩之间采用C-T形锁扣连接;围堰设置4层内支撑,单层内支撑设3道对撑,内支撑四角设型钢斜撑;基底设置混凝土垫层参与围堰结构受力。围堰采用XR360旋挖钻机在岩层中引孔,孔内换填细砂后插打钢管桩,钢管桩壁内、外两侧换填砂采用高压旋喷注浆加固。围堰设置智能化监测系统,对围堰受力、变形等进行实时动态监控。实践证明,该桥围堰结构安全可靠、止水效果良好、施工快捷高效。 展开更多
关键词 公路铁路两用桥 围堰 锁口钢管桩 引孔 换填细砂 高压旋喷注浆 围堰设计 施工技术
下载PDF
碾盘山水利水电枢纽二期围堰防渗体系构建技术研究
13
作者 马辉文 《水利建设与管理》 2024年第10期1-7,共7页
为创造坝体干地施工条件及评价围堰防渗体系效果,本文以碾盘山水利水电枢纽二期工程左岸连接土坝为例,对新旧防渗墙接头处理进行优化设计,采用3种钻孔法对高喷墙的渗透系数进行试验检查与成果分析,通过水位观测及安全监测资料分析评价... 为创造坝体干地施工条件及评价围堰防渗体系效果,本文以碾盘山水利水电枢纽二期工程左岸连接土坝为例,对新旧防渗墙接头处理进行优化设计,采用3种钻孔法对高喷墙的渗透系数进行试验检查与成果分析,通过水位观测及安全监测资料分析评价防渗体系整体防渗效果。实践表明本工程土石围堰防渗体系的防渗效果达到预期,可为其他类似工程提供借鉴与参考。 展开更多
关键词 堰坝结合 围堰防渗 防渗墙 高喷
下载PDF
某水库水位变化对库区围堰坝体边坡稳定性的影响 被引量:2
14
作者 施学铭 魏迎春 +1 位作者 魏宇 施炳甫 《水电能源科学》 北大核心 2024年第2期129-133,共5页
为查明水库围堰边坡设计的合理性及水位变化对边坡稳定性的影响,基于FLAC3D数值模拟软件,针对百色市某水库建立三维模型,模拟了围堰边坡在水位下降、水位上升和基坑排水3种情景下的变形情况,分析了水位变化对边坡稳定性的影响。结果表明... 为查明水库围堰边坡设计的合理性及水位变化对边坡稳定性的影响,基于FLAC3D数值模拟软件,针对百色市某水库建立三维模型,模拟了围堰边坡在水位下降、水位上升和基坑排水3种情景下的变形情况,分析了水位变化对边坡稳定性的影响。结果表明,围堰边坡上游一、二级台阶及下游二级台阶区域易发生较大变形;库水位下降引起各监测点水平位移为40~230 mm、竖向位移为260~390 mm,库水位上升引起各监测点水平位移为60~360 mm、竖向位移约为150 mm,基坑排水引起各监测点水平位移为580~600 mm、竖向位移为21~57 mm,对围堰边坡变形的影响大小依次为基坑排水>库水位下降>库水位上升;边坡安全系数与水位变化呈正相关关系,安全系数增量随水位上升先增大后减小。研究结果为边坡设计和防护提供了理论依据。 展开更多
关键词 围堰边坡 FLAC3D 水位变化 边坡稳定
下载PDF
土石围堰防渗墙快速施工时泥浆渗透特性及渗透系数反演方法研究
15
作者 徐世濠 赵银超 +1 位作者 吴都督 苏凯 《中国农村水利水电》 北大核心 2024年第7期177-182,共6页
土石围堰防渗墙施工过程中的固壁泥浆具有一定的防渗能力。如果工程中出现一些突发事件严重影响施工进度,为了确保主体建筑物施工进度,工程中可以采用围堰防渗墙施工过程中提前进行基坑抽水的施工策略,但此时固壁泥浆的防渗能力以及堰... 土石围堰防渗墙施工过程中的固壁泥浆具有一定的防渗能力。如果工程中出现一些突发事件严重影响施工进度,为了确保主体建筑物施工进度,工程中可以采用围堰防渗墙施工过程中提前进行基坑抽水的施工策略,但此时固壁泥浆的防渗能力以及堰体稳定是否满足要求还有待研究。利用ABAQUS有限元计算软件,以渗流量为评价参数,研究了围堰不透水层深度、泥浆渗透系数以及泥浆影响带对围堰防渗能力的影响。并在此基础上,提出了基于围堰渗流量的泥浆渗透系数反演方法,为围堰防渗墙施工与基坑提前排水同时进行的施工策略研究提供了重要的依据。研究成果可为类似工程提供参考。 展开更多
关键词 土石围堰 泥浆 渗透系数
下载PDF
济阳黄河公铁两用特大桥施工关键技术 被引量:3
16
作者 姜贺 牛伟锋 +1 位作者 韩胜利 李宁 《世界桥梁》 北大核心 2024年第1期45-50,共6页
济阳黄河公铁两用特大桥主桥为(84+144+228+240+300+120+60)m非对称、多跨、不等高、矮塔钢桁梁斜拉桥,采用塔梁固结、塔墩分离的结构体系。主梁采用N形双主桁、双层桥面布置,上层通行6车道公路,下层通行双线铁路。主墩桩基利用黄河枯... 济阳黄河公铁两用特大桥主桥为(84+144+228+240+300+120+60)m非对称、多跨、不等高、矮塔钢桁梁斜拉桥,采用塔梁固结、塔墩分离的结构体系。主梁采用N形双主桁、双层桥面布置,上层通行6车道公路,下层通行双线铁路。主墩桩基利用黄河枯水期采用大型旋挖钻机成孔,位于黄河主河槽的主墩承台采用锁口钢管桩围堰成套施工技术,其余主墩采用钢板桩围堰施工。主墩承台大体积混凝土结构采用自动测温及内部循环冷却水控制的智能化温度控制系统,承台混凝土未出现有害裂纹。钢桁梁利用门吊吊装杆件,设置墩旁托架和临时墩,采用双悬臂拼装+单侧悬臂拼装方式架设,结合钢塔两侧跨度不对称及跨黄河险工河段、施工条件受限等特点,通过定点精确配重+移动配重+索力调整,确保了钢桁梁线形满足设计要求、架设过程安全稳定。钢塔利用组合起重设备和定位工装分节组拼,钢横梁利用塔顶吊架整体提升,保证了钢塔安装精度。 展开更多
关键词 公路铁路两用桥 矮塔斜拉桥 钢围堰 智能化温度控制系统 不等跨悬臂架设 移动配重 塔顶吊架 施工技术
下载PDF
复合过水围堰高效填筑技术 被引量:1
17
作者 张睿 李子昌 +6 位作者 曹丰泽 聂宇辛 杜立兵 林鹏 杨社亚 潘新波 娄威立 《水利水电科技进展》 CSCD 北大核心 2024年第1期73-78,94,共7页
针对非洲的朱利叶斯·尼雷尔(Julius Nyerere)水电站大坝成功截流后,上游过水围堰建造期短、工程量大、施工要求高等难题,提出了一种复合过水围堰新型高效填筑技术,重点介绍了底部赶水混凝土浇筑、左岸堆石混凝土浇筑、下游预制挡... 针对非洲的朱利叶斯·尼雷尔(Julius Nyerere)水电站大坝成功截流后,上游过水围堰建造期短、工程量大、施工要求高等难题,提出了一种复合过水围堰新型高效填筑技术,重点介绍了底部赶水混凝土浇筑、左岸堆石混凝土浇筑、下游预制挡块模板施工、上游黏土防渗层平起施工、主体胶凝砂砾石变态碾压施工5种高效填筑施工流程及关键技术。工程实践表明,该新型高效填筑技术大幅优化了施工组织与效率,最终在汛期来临之前安全、高效、优质地完成了过水围堰的修筑工作。 展开更多
关键词 复合过水围堰 胶凝砂砾石 高效填筑 施工技术 朱利叶斯·尼雷尔水电站
下载PDF
基坑提前排水围堰渗流稳定及排水策略研究
18
作者 吴都督 赵银超 +1 位作者 曾伟 向金虎 《中国农村水利水电》 北大核心 2024年第5期243-248,共6页
围堰渗流及边坡稳定关系到围堰自身稳定以及基坑能否及时形成干地施工条件,极大影响到主体建筑物的工期。依托于澜沧江TB水电站围堰施工与基坑排水工作,对围堰防渗墙各施工阶段基坑水位骤降条件下的堰体渗流稳定与边坡稳定性进行了研究... 围堰渗流及边坡稳定关系到围堰自身稳定以及基坑能否及时形成干地施工条件,极大影响到主体建筑物的工期。依托于澜沧江TB水电站围堰施工与基坑排水工作,对围堰防渗墙各施工阶段基坑水位骤降条件下的堰体渗流稳定与边坡稳定性进行了研究。结果表明:随着防渗墙的施工逐步完成,围堰体浸润线的再次稳定用时逐步减小,且基坑内外水位差更大的条件下浸润线稳定用时更长;在围堰防渗墙处于一期槽施工完成二期槽泥浆固壁条件下,若能控制基坑单次水位骤降不超过0.9 m,则堰体边坡能保持稳定,此时可允许基坑提前排水。在此基础上,对TB水电站基坑提前排水策略及方案进行了研究。研究结果可为类似工程提供参考。 展开更多
关键词 围堰 渗流稳定 边坡稳定 基坑排水
下载PDF
水上应急封堵工程施工中LEC法的应用及安全措施研究 被引量:1
19
作者 余冲 王海军 陈崇德 《水电与新能源》 2024年第6期63-66,共4页
在汉江干流兴隆水利枢纽下游横向围堰缺口段应急封堵工程施工中,用LEC法对施工中的危险源进行辨识、分析,并研究了采取的专项实施方案和相应的安全保证措施,对于指导施工起到了积极地作用。4个多月的施工紧张有序,对出现的危险因素事先... 在汉江干流兴隆水利枢纽下游横向围堰缺口段应急封堵工程施工中,用LEC法对施工中的危险源进行辨识、分析,并研究了采取的专项实施方案和相应的安全保证措施,对于指导施工起到了积极地作用。4个多月的施工紧张有序,对出现的危险因素事先有预测和相应措施落实到位,未出现任何事故,实现了确保工程质量与安全的目标。LEC法对危险等级划分需要的资料较多,在实践中根据具体情况可对判断适当修正。 展开更多
关键词 围堰缺口 应急封堵 LEC法 安全措施 兴隆水利枢纽
下载PDF
丹江口水库特大桥钢-混凝土组合围堰施工技术
20
作者 于得安 姜永生 +1 位作者 周范武 高海涛 《桥梁建设》 EI CSCD 北大核心 2024年第3期135-141,共7页
丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,主墩采用整体式承台+大直径群桩基础,主墩承台平面为八边形,尺寸为48 m(横桥向)×26 m(顺桥向)×6.5 m(高),承台底部设置26根直径2.8 m钻孔灌注桩。为适应库区倾... 丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,主墩采用整体式承台+大直径群桩基础,主墩承台平面为八边形,尺寸为48 m(横桥向)×26 m(顺桥向)×6.5 m(高),承台底部设置26根直径2.8 m钻孔灌注桩。为适应库区倾斜裸岩地形,降低施工难度及施工费用,主墩围堰采用下部混凝土挡墙围堰+上部单壁钢围堰的钢-混凝土组合围堰方案。下部混凝土挡墙围堰采用衡重式挡墙围堰及抗滑桩挡墙围堰,高3~11 m;上部单壁钢围堰分块设置,其长度与下部挡墙围堰匹配,高8 m。钢-混凝土组合围堰施工时,首先根据地形条件进行挡墙围堰分段,之后采用破碎锤开挖混凝土挡墙围堰基础;混凝土挡墙围堰采用分层、分块施工,顶部圈梁与挡墙围堰同步浇筑;上部单壁钢围堰采用加工厂预制+现场分块安装,并预留竖向型钢接长部分;最后进行单壁钢围堰底部及组合围堰山体连接处止水混凝土施工,完成钢-混凝土组合围堰施工。钢-混凝土组合围堰的应用,有效缩短了基础施工周期,降低了围堰施工难度及施工费用,经济合理,满足现场施工各项要求。 展开更多
关键词 部分地锚式斜拉桥 倾斜裸岩 钢-混凝土组合围堰 混凝土挡墙围堰 单壁钢围堰 施工技术
下载PDF
上一页 1 2 166 下一页 到第
使用帮助 返回顶部