期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Predictability of well construction time with multivariate probabilistic approach
1
作者 LUU Quang-Hung LAU Man Fai +3 位作者 NG Sebastian P.H. TING Clement P.W. WEE Reuben THEN Patrick H.H. 《Petroleum Exploration and Development》 CSCD 2021年第4期987-998,共12页
Current univariate approach to predict the probability of well construction time has limited accuracy due to the fact that it ignores key factors affecting the time.In this study,we propose a multivariate probabilisti... Current univariate approach to predict the probability of well construction time has limited accuracy due to the fact that it ignores key factors affecting the time.In this study,we propose a multivariate probabilistic approach to predict the risks of well construction time.It takes advantage of an extended multi-dimensional Bernacchia–Pigolotti kernel density estimation technique and combines probability distributions by means of Monte-Carlo simulations to establish a depth-dependent probabilistic model.This method is applied to predict the durations of drilling phases of 192 wells,most of which are located in the AustraliaAsia region.Despite the challenge of gappy records,our model shows an excellent statistical agreement with the observed data.Our results suggested that the total time is longer than the trouble-free time by at least 4 days,and at most 12 days within the 10%–90% confidence interval.This model allows us to derive the likelihoods of duration for each phase at a certain depth and to generate inputs for training data-driven models,facilitating evaluation and prediction of the risks of an entire drilling operation. 展开更多
关键词 well construction time multivariate probabilistic modelling probabilistic approach Markov Chain Monte-Carlo
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部