Managing TG-51 reference dosimetry in a large hospital network can be a challenging task. The objectives of this study are to investigate the effectiveness of using Statistical Process Control (SPC) to manage TG-51 wo...Managing TG-51 reference dosimetry in a large hospital network can be a challenging task. The objectives of this study are to investigate the effectiveness of using Statistical Process Control (SPC) to manage TG-51 workflow in such a network. All the sites in the network performed the annual reference dosimetry in water according to TG-51. These data were used to cross-calibrate the same ion chambers in plastic phantoms for monthly QA output measurements. An energy-specific dimensionless beam quality cross-calibration factor, <img src="Edit_6bfb9907-c034-4197-97a7-e8337a7fc21a.png" width="20" height="19" alt="" />, was derived to monitor the process across multiple sites. The SPC analysis was then performed to obtain the mean, <img src="Edit_c630a2dd-f714-4042-a46e-da0ca863cb41.png" width="30" height="20" alt="" /> , standard deviation, <span style="font-size:6.5pt;font-family:;" "=""><span style="white-space:normal;"><span style="font-size:6.5pt;font-family:"">σ</span><span style="white-space:nowrap;"><sub><i>k</i></sub></span></span></span>, the Upper Control Limit (UCL) and Lower Control Limit (LCL) in each beam. This process was first applied to 15 years of historical data at the main campus to assess the effectiveness of the process. A two-year prospective study including all 30 linear accelerators spread over the main campus and seven satellites in the network followed. The ranges of the control limits (±3σ) were found to be in the range of 1.7% - 2.6% and 3.3% - 4.2% for the main campus and the satellite sites respectively. The wider range in the satellite sites was attributed to variations in the workflow. Standardization of workflow was also found to be effective in narrowing the control limits. The SPC is effective in identifying variations in the workflow and was shown to be an effective tool in managing large network reference dosimetry.展开更多
A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project r...A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects.展开更多
In software development life cycle, Software Process Management (SPM) acts as a significant part throughout the execution of project. In this study, the application of control chart for analyzing the stability of soft...In software development life cycle, Software Process Management (SPM) acts as a significant part throughout the execution of project. In this study, the application of control chart for analyzing the stability of software process and defects in the software product is discussed. This paper will discuss the analyzing impact or collision of rework effort, defect density, inspection performance and productivity by using control charts. This paper also explains the benefits and challenges of using control charts in software organization.展开更多
The main goal of this paper is to analyze situations of financial crisis in Italian companies. The analysis has also been focused on the company's attitude to overcome the financial crisis. Secondly, the authors have...The main goal of this paper is to analyze situations of financial crisis in Italian companies. The analysis has also been focused on the company's attitude to overcome the financial crisis. Secondly, the authors have analyzed if the recovery project has required the introduction of a new management control system or changes to the existing management control system. The methodology is composed of several steps. First of all, the authors have analyzed the existing literature. Secondly, the authors have referred to a sample of 98 Italian recovery projects formalized by Italian private companies. The analysis of the literature and the recovery projects permits to achieve some provisional results, which have been tested through surveys. The methodology approach is inspired by the grounded theory. The findings have been several: (1) The crisis is a usual event in the lifecycle of a firm, due to a deterioration of its strength and a change of the context; (2) The timing factor has played a fundamental role in managing the crisis situation, because a late identification of the symptoms or a minimization of them can generate an irreversible situation; and (3) In addition, a recovery project includes the introduction of a new management control system or changes to the existing management control system. These new or modified management control systems use "feed-forward" mechanisms, which make early predictions about the changes in the characteristics of the competitive framework.展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
Information-centric networking(ICN) aims to improve the efficiency of content delivery and reduce the redundancy of data transmission by caching contents in network nodes. An important issue is to design caching metho...Information-centric networking(ICN) aims to improve the efficiency of content delivery and reduce the redundancy of data transmission by caching contents in network nodes. An important issue is to design caching methods with better cache hit rate and achieve allocating on-demand. Therefore, an in-network caching scheduling scheme for ICN was designed, distinguishing different kinds of contents and dynamically allocating the cache size on-demand. First discussing what was appropriated to be cached in nodes, and then a classification about the contents could be cached was proposed. Furthermore, we used AHP to weight different contents classes through analyzing users' behavior. And a distributed control process was built, to achieve differentiated caching resource allocation and management. The designed scheme not only avoids the waste of caching resource, but also further enhances the cache availability. Finally, the simulation results are illustrated to show that our method has the superior performance in the aspects of server hit rate and convergence.展开更多
The paper covers analysis and investigation of lighting automation system in low-traffic long-roads. The main objective is to provide optimal solution between expensive safe design that utilizes continuous street ligh...The paper covers analysis and investigation of lighting automation system in low-traffic long-roads. The main objective is to provide optimal solution between expensive safe design that utilizes continuous street lighting system at night for the entire road, or inexpensive design that sacrifices the safety, relying on using vehicles lighting, to eliminate the problem of high cost energy consumption during the night operation of the road. By taking into account both of these factors, smart lighting automation system is proposed using Pattern Recognition Technique applied on vehicle number-plates. In this proposal, the road is sectionalized into zones, and based on smart Pattern Recognition Technique, the control system of the road lighting illuminates only the zone that the vehicles pass through. Economic analysis is provided in this paper to support the value of using this design of lighting control system.展开更多
The aim of this work is mathematical education through the knowledge system and mathematical modeling. A net model of formation of mathematical knowledge as a deductive theory is suggested here. Within this model the ...The aim of this work is mathematical education through the knowledge system and mathematical modeling. A net model of formation of mathematical knowledge as a deductive theory is suggested here. Within this model the formation of deductive theory is represented as the development of a certain informational space, the elements of which are structured in the form of the orientated semantic net. This net is properly metrized and characterized by a certain system of coverings. It allows injecting net optimization parameters, regulating qualitative aspects of knowledge system under consideration. To regulate the creative processes of the formation and realization of mathematical know- edge, stochastic model of formation deductive theory is suggested here in the form of branching Markovian process, which is realized in the corresponding informational space as a semantic net. According to this stochastic model we can get correct foundation of criterion of optimization creative processes that leads to “great main points” strategy (GMP-strategy) in the process of realization of the effective control in the research work in the sphere of mathematics and its applications.展开更多
The internal control process, which is designed to help an organization accomplish specific control objectives, is one of the most important processes, as it can determine whether or not the organization is in complia...The internal control process, which is designed to help an organization accomplish specific control objectives, is one of the most important processes, as it can determine whether or not the organization is in compliance with its internal or external requirements. Internal controls emerge from different perspectives. Currently, experts view and act on one control perspective at a time, which creates inefficiencies and duplication. This software engineering research is aimed at proposing a multiperspective framework for representing internal controls, in order to obtain a centralized and comprehensive view of all internal control mechanisms. To carry out this research, we also needed to represent the many different stakeholder perspectives of internal controls. Based on a literature review of mathematical and psychological analysis, we searched for the most suitable multiperspective representation of internal controls, and assessed the many representation options using the AHP (analytical hierarchical process) sensitivity analysis approach. This approach has been applied to a study group which has been called to answer to a questionnaire.展开更多
In order to solve information island problem of offshore oil and gas field production-related information system,including repetitive reporting and input of data,data isolation of central control system,inadequate fol...In order to solve information island problem of offshore oil and gas field production-related information system,including repetitive reporting and input of data,data isolation of central control system,inadequate follow-up analysis and development to support oil and gas field production management,and so on.Therefore,the introduction of MES(Manufacturing Execution System)production execution system in the manufacturing industry and downstream production of offshore oil has become an inevitable choice.This system utilizes the real-time database combined with relational database to collect the scattered structured data,such as the production process real-time data,production management documents and statistical tables of offshore oil and gas production facilities.It establishes a unified data center platform for each operation area and production site,so as to centralize the related production management data at production sites.This system realizes many functions,including the production management support like production report generation as well as presentation and POB,equipment management support like PM optimization,remote configuration and monitoring of production operation,status trend analysis,and production event prediction.The implementation of MES system in offshore oil and gas field production management perfects the overall information system of China National Offshore Oil Corporation more and gradually enhances its comprehensive benefits.展开更多
The history of creation in 1971–1975 years at SDB MMS of the Institute of Cybernetics (Kyiv city) the control system for the deuterium pre-concentration stage in heavy water production at Dneprodzerzhinsk chemical pl...The history of creation in 1971–1975 years at SDB MMS of the Institute of Cybernetics (Kyiv city) the control system for the deuterium pre-concentration stage in heavy water production at Dneprodzerzhinsk chemical plant (now Kamianske city, PJSC “DneprAzot”) is considered. It is given a technological block-diagram of the stage with its components and block-diagram of ACSTP which was developed in consequence of investigations of this complex managed object. A mathematical model of the distillation columns in the separating units of hydrogen isotopes which was used for synthesis of an algorithm of the adaptive stochastic optimal system with active accumulation of information about managed probabilistic processes is described. The results of the carried out tests of the system confirmed its efficiency.展开更多
目的探讨重症监护室(intensive care unit,ICU)住院患者中应用循环质控理念联合风险管理模式的效果。方法选取2023年1—5月寿光市人民医院ICU住院患者335例作为对照组,实施常规医院感染管理;选取2023年6—12月ICU住院患者340例作为干预...目的探讨重症监护室(intensive care unit,ICU)住院患者中应用循环质控理念联合风险管理模式的效果。方法选取2023年1—5月寿光市人民医院ICU住院患者335例作为对照组,实施常规医院感染管理;选取2023年6—12月ICU住院患者340例作为干预组,实施循环质控理念联合风险管理模式。比较2组管理质量、风险事件、医院感染发生率及患者满意度。结果干预组管理质量(感染监测、组织管理、风险评估、制度建设)评分高于对照组(P<0.05);干预组风险事件发生率(1.47%)低于对照组(4.48%)(P<0.05);干预组医院感染发生率(3.82%)低于对照组(7.46%)(P<0.05);干预组患者满意度(98.24%)低于对照组(95.52%)(P<0.05)。结论循环质控理念联合风险管理模式应用于ICU住院患者中,可提高管理质量,减少风险事件与医院感染发生,促进患者满意度提升,体现了《ICU十大安全目标》的执行标准。展开更多
文摘Managing TG-51 reference dosimetry in a large hospital network can be a challenging task. The objectives of this study are to investigate the effectiveness of using Statistical Process Control (SPC) to manage TG-51 workflow in such a network. All the sites in the network performed the annual reference dosimetry in water according to TG-51. These data were used to cross-calibrate the same ion chambers in plastic phantoms for monthly QA output measurements. An energy-specific dimensionless beam quality cross-calibration factor, <img src="Edit_6bfb9907-c034-4197-97a7-e8337a7fc21a.png" width="20" height="19" alt="" />, was derived to monitor the process across multiple sites. The SPC analysis was then performed to obtain the mean, <img src="Edit_c630a2dd-f714-4042-a46e-da0ca863cb41.png" width="30" height="20" alt="" /> , standard deviation, <span style="font-size:6.5pt;font-family:;" "=""><span style="white-space:normal;"><span style="font-size:6.5pt;font-family:"">σ</span><span style="white-space:nowrap;"><sub><i>k</i></sub></span></span></span>, the Upper Control Limit (UCL) and Lower Control Limit (LCL) in each beam. This process was first applied to 15 years of historical data at the main campus to assess the effectiveness of the process. A two-year prospective study including all 30 linear accelerators spread over the main campus and seven satellites in the network followed. The ranges of the control limits (±3σ) were found to be in the range of 1.7% - 2.6% and 3.3% - 4.2% for the main campus and the satellite sites respectively. The wider range in the satellite sites was attributed to variations in the workflow. Standardization of workflow was also found to be effective in narrowing the control limits. The SPC is effective in identifying variations in the workflow and was shown to be an effective tool in managing large network reference dosimetry.
基金Supported bythe Plan of New Technology Projectsin China National Packaging Corporation2005 (05ZBJA011)the Na-tional Natural Science Foundation of China (60373062) National Sci-ence Foundation of Hunan Province(04JJ3052)
文摘A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects.
文摘In software development life cycle, Software Process Management (SPM) acts as a significant part throughout the execution of project. In this study, the application of control chart for analyzing the stability of software process and defects in the software product is discussed. This paper will discuss the analyzing impact or collision of rework effort, defect density, inspection performance and productivity by using control charts. This paper also explains the benefits and challenges of using control charts in software organization.
文摘The main goal of this paper is to analyze situations of financial crisis in Italian companies. The analysis has also been focused on the company's attitude to overcome the financial crisis. Secondly, the authors have analyzed if the recovery project has required the introduction of a new management control system or changes to the existing management control system. The methodology is composed of several steps. First of all, the authors have analyzed the existing literature. Secondly, the authors have referred to a sample of 98 Italian recovery projects formalized by Italian private companies. The analysis of the literature and the recovery projects permits to achieve some provisional results, which have been tested through surveys. The methodology approach is inspired by the grounded theory. The findings have been several: (1) The crisis is a usual event in the lifecycle of a firm, due to a deterioration of its strength and a change of the context; (2) The timing factor has played a fundamental role in managing the crisis situation, because a late identification of the symptoms or a minimization of them can generate an irreversible situation; and (3) In addition, a recovery project includes the introduction of a new management control system or changes to the existing management control system. These new or modified management control systems use "feed-forward" mechanisms, which make early predictions about the changes in the characteristics of the competitive framework.
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
基金supported in part by The National High Technology Research and Development Program of China (863 Program) under Grant No. 2015AA016101The National Natural Science Foundation of China under Grant No. 61501042+1 种基金Beijing Nova Program under Grant No. Z151100000315078BUPT Special Program for Youth Scientific Research Innovation under Grant No. 2015RC10
文摘Information-centric networking(ICN) aims to improve the efficiency of content delivery and reduce the redundancy of data transmission by caching contents in network nodes. An important issue is to design caching methods with better cache hit rate and achieve allocating on-demand. Therefore, an in-network caching scheduling scheme for ICN was designed, distinguishing different kinds of contents and dynamically allocating the cache size on-demand. First discussing what was appropriated to be cached in nodes, and then a classification about the contents could be cached was proposed. Furthermore, we used AHP to weight different contents classes through analyzing users' behavior. And a distributed control process was built, to achieve differentiated caching resource allocation and management. The designed scheme not only avoids the waste of caching resource, but also further enhances the cache availability. Finally, the simulation results are illustrated to show that our method has the superior performance in the aspects of server hit rate and convergence.
文摘The paper covers analysis and investigation of lighting automation system in low-traffic long-roads. The main objective is to provide optimal solution between expensive safe design that utilizes continuous street lighting system at night for the entire road, or inexpensive design that sacrifices the safety, relying on using vehicles lighting, to eliminate the problem of high cost energy consumption during the night operation of the road. By taking into account both of these factors, smart lighting automation system is proposed using Pattern Recognition Technique applied on vehicle number-plates. In this proposal, the road is sectionalized into zones, and based on smart Pattern Recognition Technique, the control system of the road lighting illuminates only the zone that the vehicles pass through. Economic analysis is provided in this paper to support the value of using this design of lighting control system.
文摘The aim of this work is mathematical education through the knowledge system and mathematical modeling. A net model of formation of mathematical knowledge as a deductive theory is suggested here. Within this model the formation of deductive theory is represented as the development of a certain informational space, the elements of which are structured in the form of the orientated semantic net. This net is properly metrized and characterized by a certain system of coverings. It allows injecting net optimization parameters, regulating qualitative aspects of knowledge system under consideration. To regulate the creative processes of the formation and realization of mathematical know- edge, stochastic model of formation deductive theory is suggested here in the form of branching Markovian process, which is realized in the corresponding informational space as a semantic net. According to this stochastic model we can get correct foundation of criterion of optimization creative processes that leads to “great main points” strategy (GMP-strategy) in the process of realization of the effective control in the research work in the sphere of mathematics and its applications.
文摘The internal control process, which is designed to help an organization accomplish specific control objectives, is one of the most important processes, as it can determine whether or not the organization is in compliance with its internal or external requirements. Internal controls emerge from different perspectives. Currently, experts view and act on one control perspective at a time, which creates inefficiencies and duplication. This software engineering research is aimed at proposing a multiperspective framework for representing internal controls, in order to obtain a centralized and comprehensive view of all internal control mechanisms. To carry out this research, we also needed to represent the many different stakeholder perspectives of internal controls. Based on a literature review of mathematical and psychological analysis, we searched for the most suitable multiperspective representation of internal controls, and assessed the many representation options using the AHP (analytical hierarchical process) sensitivity analysis approach. This approach has been applied to a study group which has been called to answer to a questionnaire.
文摘In order to solve information island problem of offshore oil and gas field production-related information system,including repetitive reporting and input of data,data isolation of central control system,inadequate follow-up analysis and development to support oil and gas field production management,and so on.Therefore,the introduction of MES(Manufacturing Execution System)production execution system in the manufacturing industry and downstream production of offshore oil has become an inevitable choice.This system utilizes the real-time database combined with relational database to collect the scattered structured data,such as the production process real-time data,production management documents and statistical tables of offshore oil and gas production facilities.It establishes a unified data center platform for each operation area and production site,so as to centralize the related production management data at production sites.This system realizes many functions,including the production management support like production report generation as well as presentation and POB,equipment management support like PM optimization,remote configuration and monitoring of production operation,status trend analysis,and production event prediction.The implementation of MES system in offshore oil and gas field production management perfects the overall information system of China National Offshore Oil Corporation more and gradually enhances its comprehensive benefits.
文摘The history of creation in 1971–1975 years at SDB MMS of the Institute of Cybernetics (Kyiv city) the control system for the deuterium pre-concentration stage in heavy water production at Dneprodzerzhinsk chemical plant (now Kamianske city, PJSC “DneprAzot”) is considered. It is given a technological block-diagram of the stage with its components and block-diagram of ACSTP which was developed in consequence of investigations of this complex managed object. A mathematical model of the distillation columns in the separating units of hydrogen isotopes which was used for synthesis of an algorithm of the adaptive stochastic optimal system with active accumulation of information about managed probabilistic processes is described. The results of the carried out tests of the system confirmed its efficiency.
文摘目的探讨重症监护室(intensive care unit,ICU)住院患者中应用循环质控理念联合风险管理模式的效果。方法选取2023年1—5月寿光市人民医院ICU住院患者335例作为对照组,实施常规医院感染管理;选取2023年6—12月ICU住院患者340例作为干预组,实施循环质控理念联合风险管理模式。比较2组管理质量、风险事件、医院感染发生率及患者满意度。结果干预组管理质量(感染监测、组织管理、风险评估、制度建设)评分高于对照组(P<0.05);干预组风险事件发生率(1.47%)低于对照组(4.48%)(P<0.05);干预组医院感染发生率(3.82%)低于对照组(7.46%)(P<0.05);干预组患者满意度(98.24%)低于对照组(95.52%)(P<0.05)。结论循环质控理念联合风险管理模式应用于ICU住院患者中,可提高管理质量,减少风险事件与医院感染发生,促进患者满意度提升,体现了《ICU十大安全目标》的执行标准。