This paper studies the feasibility of a supply-side wind-coal integrated energy system.Based on grid-side data,the load regulation model of coal-fired power and the wind-coal integrated energy system model are establi...This paper studies the feasibility of a supply-side wind-coal integrated energy system.Based on grid-side data,the load regulation model of coal-fired power and the wind-coal integrated energy system model are established.According to the simulation results,the reasons why the wind-coal combined power supply is difficult to meet the grid-side demand are revealedthrough scenario analysis.Basedon thewind-coal combinedoperation,a wind-coalstorage integrated energy system was proposed by adding lithium-iron phosphate battery energy storage system(LIPBESS)to adjust the load of the system.According to the four load adjustment scenarios of grid-side instructions of the wind-coal system,the difficulty of load adjustment in each scenario is analyzed.Based on the priority degree of LIPBESS charge/discharge in four scenarios at different time periods,the operation mode of two charges and two discharges per day was developed.Based on the independent operation level of coal-fired power,after the addition of LIPBESS(5.5 MWh),the average qualified rate of multi-power operation in March and June reached the level of independent operation of coal-fired power,while the average qualified rate of the remaining months was only 5.4%different from that of independent operation of coal-fired power.Compared with the wind storage mode,the energy storage capacity and investment cost of wind-coal-storage integrated energy system are reduced by 54.2%and 53.7%,respectively.展开更多
In this paper,a typical-operation-curve generation method of a hydrogen energy storage system operating under the mode of stabilizing wind power fluctuations is proposed.This method is used to optimize the power and c...In this paper,a typical-operation-curve generation method of a hydrogen energy storage system operating under the mode of stabilizing wind power fluctuations is proposed.This method is used to optimize the power and capacity configuration of the energy storage system.The time series curves of the charging and discharging powers of the hydrogen energy storage are obtained by EMD decomposition,and the curves are classified according to the similarities and differences of the characteristic parameters in different time periods.After the classification,typical charging and discharging power values of each type of curve at each moment are obtained by a cloud model,and then,typical operation curves of each type are obtained by integration.On this basis,the power and capacity of the energy storage system are optimized with the objective of economic optimization through the MATLAB CPLEX toolbox.Combined with the measured data of a wind farm with an installed capacity of 400 MW in Northeast China,the validity and rationality of the typical operation curve generation method proposed in this paper are verified.展开更多
Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuratio...Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuration of transmission capacity,which has the features of low utilization and poor economy,is hardly matching correctly due to the volatility and low energy density of wind.The usage of energy storage can mitigate wind power fluctuations and reduce the requirement of out-delivery transmission capacity,but facing the issue of energy storage cost recovery.Therefore,it is necessary to optimize the allocation of energy storage while considering the problem of wind power transmission.This paper studies the joint optimization of large-scale wind power transmission capacity and energy storage,reveals the mechanism of energy storage in order to reduce the power fluctuation of wind power base and slow down the demand of transmission.Then,analyze the multi-functional cost-sharing mode of energy storage,improve the efficiency of energy storage cost recovery.Constructs the coordination optimization configuration model to deal with the problem of large-scale wind power transmission capacity and energy storage,and realizes the transmission capacity optimization coordination and optimization with energy storage.The proposed method is verified by a wind base located in Northeast China.展开更多
With the increased promotion of integrated energy power systems(IEPS),renewable energy and energy storage systems(ESS)play a more important role.However,the fluctuation and intermittent nature of wind not only results...With the increased promotion of integrated energy power systems(IEPS),renewable energy and energy storage systems(ESS)play a more important role.However,the fluctuation and intermittent nature of wind not only results in substantial reliability and stability defects,but it also weakens the competitiveness of wind generation in the electric power market.Meanwhile,the way to further enhance the system reliability effectively improving market profits of wind farms is one of the most important aspects of Wind-ESS joint operational design.In this paper,a market-oriented optimized dispatching strategy for a wind farm with a multiple stage hybrid ESS is proposed.The first stage ESS is designed to improve the profits of wind generation through day-ahead market operations,the real-time marketbased second stage ESS is focused on day-ahead forecasting error elimination and wind power fluctuation smoothing,while the backup stage ESS is associated with them to provide the ancillary service.An interval forecasting method is adopted to help to ensure reliable forecast results of day-ahead wind power,electricity prices and loads.With this hybrid ESS design,supply reliability and market profits are simultaneously achieved for wind farms.展开更多
Wind power has been proven to have the ability to participate in the frequency modulation(FM)market.Using batteries to improve wind power stability can better aid wind farms participating in the FM market.Battery ener...Wind power has been proven to have the ability to participate in the frequency modulation(FM)market.Using batteries to improve wind power stability can better aid wind farms participating in the FM market.Battery energy storage system(BESS)has a promising future in applying regulation and load management in the power grid.For regulation services,normally,the regulation power prediction is estimated based on the required maximum regulation capacity;the power needed for the specific regulation service is unknown to the BESS owner.However,this information is needed in the regulation model when formulating the linearised BESS model with a constraint on the state of charge(SoC).This compromises the accuracy of the model greatly when it is applied for regulation service.Moreover,different control strategies can be employed by BESS.However,the current depth of discharge(DoD)based models have difficulties in being used in a linearization problem.Due to the consideration of the control strategy,the model becomes highly nonlinear and cannot be solved.In this paper,a charging rate(C-rate)based model is introduced,which can consider different control strategies of a BESS for cooperation with wind farms to participate in wind farm estimation error compensation,load management,energy bid,and regulation bid.First,the limitation of conventional BESS models are listed,and a new C-rate-based model is introduced.Then the C-rate-based BESS model is adopted in a wind farm and BESS cooperation scheme.Finally,experimental studies are carried out,and the DoD model and C-rate model optimization results are compared to prove the rationality of the C-rate model.展开更多
基金supported by the Natural Science Foundation of China(Grant No.52076079)Natural Science Foundation of Hebei Province,China(Grant No.E2020502013)the Fundamental Research Funds for the Central Universities(2021MS076,2021MS079).
文摘This paper studies the feasibility of a supply-side wind-coal integrated energy system.Based on grid-side data,the load regulation model of coal-fired power and the wind-coal integrated energy system model are established.According to the simulation results,the reasons why the wind-coal combined power supply is difficult to meet the grid-side demand are revealedthrough scenario analysis.Basedon thewind-coal combinedoperation,a wind-coalstorage integrated energy system was proposed by adding lithium-iron phosphate battery energy storage system(LIPBESS)to adjust the load of the system.According to the four load adjustment scenarios of grid-side instructions of the wind-coal system,the difficulty of load adjustment in each scenario is analyzed.Based on the priority degree of LIPBESS charge/discharge in four scenarios at different time periods,the operation mode of two charges and two discharges per day was developed.Based on the independent operation level of coal-fired power,after the addition of LIPBESS(5.5 MWh),the average qualified rate of multi-power operation in March and June reached the level of independent operation of coal-fired power,while the average qualified rate of the remaining months was only 5.4%different from that of independent operation of coal-fired power.Compared with the wind storage mode,the energy storage capacity and investment cost of wind-coal-storage integrated energy system are reduced by 54.2%and 53.7%,respectively.
基金This work was supported by the National Key Research and Development Program of China(Materials and Process Basis of Electrolytic Hydrogen Production from Fluctuating Power Sources such as Photovoltaic/Wind Power,No.2021YFB4000100).
文摘In this paper,a typical-operation-curve generation method of a hydrogen energy storage system operating under the mode of stabilizing wind power fluctuations is proposed.This method is used to optimize the power and capacity configuration of the energy storage system.The time series curves of the charging and discharging powers of the hydrogen energy storage are obtained by EMD decomposition,and the curves are classified according to the similarities and differences of the characteristic parameters in different time periods.After the classification,typical charging and discharging power values of each type of curve at each moment are obtained by a cloud model,and then,typical operation curves of each type are obtained by integration.On this basis,the power and capacity of the energy storage system are optimized with the objective of economic optimization through the MATLAB CPLEX toolbox.Combined with the measured data of a wind farm with an installed capacity of 400 MW in Northeast China,the validity and rationality of the typical operation curve generation method proposed in this paper are verified.
基金supported by the National Key Research and Development Program(2016YFB0900100)。
文摘Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuration of transmission capacity,which has the features of low utilization and poor economy,is hardly matching correctly due to the volatility and low energy density of wind.The usage of energy storage can mitigate wind power fluctuations and reduce the requirement of out-delivery transmission capacity,but facing the issue of energy storage cost recovery.Therefore,it is necessary to optimize the allocation of energy storage while considering the problem of wind power transmission.This paper studies the joint optimization of large-scale wind power transmission capacity and energy storage,reveals the mechanism of energy storage in order to reduce the power fluctuation of wind power base and slow down the demand of transmission.Then,analyze the multi-functional cost-sharing mode of energy storage,improve the efficiency of energy storage cost recovery.Constructs the coordination optimization configuration model to deal with the problem of large-scale wind power transmission capacity and energy storage,and realizes the transmission capacity optimization coordination and optimization with energy storage.The proposed method is verified by a wind base located in Northeast China.
基金This work was supported in part by the National Natural Science Foundation of China(No.51607025).
文摘With the increased promotion of integrated energy power systems(IEPS),renewable energy and energy storage systems(ESS)play a more important role.However,the fluctuation and intermittent nature of wind not only results in substantial reliability and stability defects,but it also weakens the competitiveness of wind generation in the electric power market.Meanwhile,the way to further enhance the system reliability effectively improving market profits of wind farms is one of the most important aspects of Wind-ESS joint operational design.In this paper,a market-oriented optimized dispatching strategy for a wind farm with a multiple stage hybrid ESS is proposed.The first stage ESS is designed to improve the profits of wind generation through day-ahead market operations,the real-time marketbased second stage ESS is focused on day-ahead forecasting error elimination and wind power fluctuation smoothing,while the backup stage ESS is associated with them to provide the ancillary service.An interval forecasting method is adopted to help to ensure reliable forecast results of day-ahead wind power,electricity prices and loads.With this hybrid ESS design,supply reliability and market profits are simultaneously achieved for wind farms.
文摘Wind power has been proven to have the ability to participate in the frequency modulation(FM)market.Using batteries to improve wind power stability can better aid wind farms participating in the FM market.Battery energy storage system(BESS)has a promising future in applying regulation and load management in the power grid.For regulation services,normally,the regulation power prediction is estimated based on the required maximum regulation capacity;the power needed for the specific regulation service is unknown to the BESS owner.However,this information is needed in the regulation model when formulating the linearised BESS model with a constraint on the state of charge(SoC).This compromises the accuracy of the model greatly when it is applied for regulation service.Moreover,different control strategies can be employed by BESS.However,the current depth of discharge(DoD)based models have difficulties in being used in a linearization problem.Due to the consideration of the control strategy,the model becomes highly nonlinear and cannot be solved.In this paper,a charging rate(C-rate)based model is introduced,which can consider different control strategies of a BESS for cooperation with wind farms to participate in wind farm estimation error compensation,load management,energy bid,and regulation bid.First,the limitation of conventional BESS models are listed,and a new C-rate-based model is introduced.Then the C-rate-based BESS model is adopted in a wind farm and BESS cooperation scheme.Finally,experimental studies are carried out,and the DoD model and C-rate model optimization results are compared to prove the rationality of the C-rate model.