The research selected 13 factors from individual and family characters, construction site characters and work characters and analyzed the influences on the willingness of purchasing houses on construction sites with L...The research selected 13 factors from individual and family characters, construction site characters and work characters and analyzed the influences on the willingness of purchasing houses on construction sites with Logistic regression mod- el. The results showed that gender, age differences, personality, willingness on fami- ly land conversion, management of enterprises on construction sites, relatives and friends on construction lands, and Job satisfaction were approved by significant testing, but marital status, annual household income, the rate of migrant worker in a household, transportation in work city, and corporate reputation were not approved by significant testing.展开更多
At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equ...At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises.展开更多
The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in...The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective.展开更多
■woman among ■peopie who are working at the ■site of China’s world ■Three ■a driver of No One ■orporation under the Gezhouba Group,she ■drives a 34-ton Karter truck every day.
基金Supported by National Natural Science Foundation of China(71363027)Humanities and Social Sciences of Ministry of Education(11YJA790088)Jiangxi Humanities and Social Sciences(10YJ17)~~
文摘The research selected 13 factors from individual and family characters, construction site characters and work characters and analyzed the influences on the willingness of purchasing houses on construction sites with Logistic regression mod- el. The results showed that gender, age differences, personality, willingness on fami- ly land conversion, management of enterprises on construction sites, relatives and friends on construction lands, and Job satisfaction were approved by significant testing, but marital status, annual household income, the rate of migrant worker in a household, transportation in work city, and corporate reputation were not approved by significant testing.
文摘At present,with the development of society,China’s civil construction equipment installation engineering has many majors,complete catego-ries and high functional requirements.In particular,the installation of the equipment is a large amount of work,with a large number of types of work,with a strong degree of specialization,and also technically complex.In the construction of construction projects in China,the installation of engineer-ing equipment is a key control point of construction safety,and equipment installation has always been a key point that construction enterprises at-tach great importance to.The installation of engineering equipment will not only affect the overall progress of engineering construction,but also affect the quality of the project,therefore,the installation of construction equipment has played a vital role and has attracted increasing attention.Combined with the actual situation of construction enterprises,this paper briefly introduces some problems and solutions existing in the construction of construction enterprises.
基金Project(41202220)supported by the National Natural Science Foundation of ChinaProject(20120022120003)supported by the Research Fund for the Doctoral Program of Higher Education,China+1 种基金Project(2652012065)supported by the Fundamental Research Funds for the Central Universities of ChinaProject(2013006)supported by the Research Fund for Key Laboratory on Deep Geo Drilling Technology,Ministry of Land and Resources,China
文摘The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective.
文摘■woman among ■peopie who are working at the ■site of China’s world ■Three ■a driver of No One ■orporation under the Gezhouba Group,she ■drives a 34-ton Karter truck every day.