期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Ground stability of new surface buildings erected on site above worked-out area
1
作者 ZHANG Jun-ying~(1,2), WANG Jin-zhuang~1 (1.China University of Mining and Technology Beijing Campus, Beijing 100083, China 2. Tangshan Branch, China Coal Research Institute, Tangshan 063012, China) 《中国有色金属学会会刊:英文版》 CSCD 2005年第S1期116-120,共5页
The subsided area caused by mining is expanding gradually in coal mining areas. In order to occupy less or no farmland, many mining areas are constructing or intend to erect new buildings (structures) on the ground si... The subsided area caused by mining is expanding gradually in coal mining areas. In order to occupy less or no farmland, many mining areas are constructing or intend to erect new buildings (structures) on the ground sites above the worked-out areas. The long-term safety of the new buildings is of great importance. This matter should be, therefore, handled with great care. Following an analysis of the different conditions of the worked-out areas, and the characteristics of the failure of different types of worked-out areas and their overlying strata, the cause for the occurrence of residual deformation of the surface above the worked-out area was explained. The techniques for (evaluating) the stability of ground site for erecting new buildings above worked-out area, and the technical measures for protecting such buildings were proposed. The ground stability evaluation techniques were introduced by reference to specific cases. 展开更多
关键词 worked-out area BUILDING GROUND LOAD STABILITY measures
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部