期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Research on the Optimal Strategy of"Working Together with One Heart"Project
1
作者 Jing Cong 《Journal of Contemporary Educational Research》 2022年第5期96-101,共6页
The"Working Together with One Heart"project,also known as the"One Heart Drum"project,is a collaboration skill development project,which assesses the collaboration skills of its team members.In this... The"Working Together with One Heart"project,also known as the"One Heart Drum"project,is a collaboration skill development project,which assesses the collaboration skills of its team members.In this paper,the method of combining actual problems with physical model analysis is used to determine the influence of different factors in the project operation,and a geometric analysis model is also established.Through MATLAB simulation and assignment operation,the optimal strategy of the project is finally obtained. 展开更多
关键词 "working Together with One Heart"project Conservation of momentum Geometric model Kinetic energy theorem
下载PDF
Project-Work——提高英语综合能力的有效途径
2
作者 田凤英 《重庆大学学报(社会科学版)》 2004年第6期102-103,共2页
Project-Work是一种提高英语综合能力的练习方式。本文论述了Project-Work的适用性、优点及不足,探讨了进行Project-Work教学的详细过程,包括如何准备、进行、评价和指导,并辅以实例说明。
关键词 project—work 英语教学 英语综合能力
下载PDF
Concealed fault analysis based on the CT projection matrix 被引量:2
3
作者 Yang Zhen Yao Wenli +1 位作者 Ma Liuzhu Wise Lucas 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第2期361-367,共7页
This paper proposes the concept of projection curves based on the theory of CT image reconstruction to probe the internal structure of the working panel prior to formal mining of the working panel.As well as reducing ... This paper proposes the concept of projection curves based on the theory of CT image reconstruction to probe the internal structure of the working panel prior to formal mining of the working panel.As well as reducing costs,this method provides safe and efficient excavation of the working panel.According to the results of the numerical model and the actual working panel,the new method has been proven to be accurate in detecting the location of the fault that extends into the face.Concealed faults of the internal working panel,as well as the start and end points of the fault,can be detected by this method.Engineering practice has proven that the method is highly reliable,has a highly decisive impact on faults for coal mining,and can be used to guide the safe mining of the working panel. 展开更多
关键词 working panel Computed tomography Concealed fault project curve
下载PDF
What to Do for Three Gorges Project This Year?
4
作者 周双超 《Electricity》 2001年第2期16-19,共4页
According to the planned schedule of Three Gorges Project: to realize initial water storage, electricity generation of first batch of hydro-generator units and open of permanent shiplock to navigation in 2003, this pa... According to the planned schedule of Three Gorges Project: to realize initial water storage, electricity generation of first batch of hydro-generator units and open of permanent shiplock to navigation in 2003, this paper presents the investment and amount of works to be completed for Three Gorges Project this year. In 2001, Three Gorges Project will be faced with a new aspect of construction: concrete pouring being in continuous high intense state; installation and erection of metallic structures, mechanical and electrical equipment as well as grouting works overall entering peaking year. 展开更多
关键词 Three Gorges project investment amount of works installation and adjustment
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部