期刊文献+
共找到2,088篇文章
< 1 2 105 >
每页显示 20 50 100
Application Strategies of Shotcrete Anchor Support Technology in Highway Bridge and Tunnel Engineering
1
作者 Ruiquan Liu 《Journal of Architectural Research and Development》 2024年第1期56-61,共6页
This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan for... This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan formulation,mortar shotcrete anchor construction,grid steel frame construction,steel mesh construction,and concrete support construction.This analysis aims to provide a guideline for those interested in applying this technology and improving the quality and safety of highway bridges and tunnels construction. 展开更多
关键词 Highway bridge engineering tunnel construction Shotcrete support Support plan Support construction
下载PDF
Construction Technology of Pile Foundation for Subway Tunnel Crossing Bridge
2
作者 Ruiquan Liu 《Journal of World Architecture》 2024年第2期37-42,共6页
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe... Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference. 展开更多
关键词 Subway tunnel bridge pile foundation Replacement construction
下载PDF
Discussion on Construction Technology of Subway Tunnel Expansion under Bridge Foundation
3
作者 Ruiquan Liu 《Journal of Architectural Research and Development》 2024年第2期37-42,共6页
As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of con... As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering. 展开更多
关键词 Subway tunnel bridge foundation underpass expansion Construction technology Steel truss support construction
下载PDF
Safety of the express freight train running over a long-span bridge
4
作者 Jingcheng Wen Yihao Qin +1 位作者 Ye Bai Xiaoqing Dong 《Railway Sciences》 2024年第4期469-479,共11页
Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of win... Purpose-Express freight transportation is in rapid development currently.Owing to the higher speed of express freight train,the deformation of the bridge deck worsens the railway line condition under the action of wind and train moving load when the train runs over a long-span bridge.Besides,the blunt car body of vehicle has poor aerodynamic characteristics,bringing a greater challenge on the running stability in the crosswind.Design/methodology/approach-In this study,the aerodynamic force coefficients of express freight vehicles on the bridge are measured by scale model wind tunnel test.The dynamic model of the train-long-span steel truss bridge coupling system is established,and the dynamic response as well as the running safety of vehicle are evaluated.Findings-The results show that wind speed has a significant influence on running safety,which is mainly reflected in the over-limitation of wheel unloading rate.The wind speed limit decreases with train speed,and it reduces to 18.83 m/s when the train speed is 160 km/h.Originality/value-This study deepens the theoretical understanding of the interaction between vehicles and bridges and proposes new methods for analyzing similar engineering problems.It also provides a new theoretical basis for the safety assessment of express freight trains. 展开更多
关键词 Express freight train Long-span bridge CROSSWIND Wind tunnel test Running safety Paper type Research paper
下载PDF
Influence of water-rich tunnel by shield tunneling on existing bridge pile foundation in layered soils 被引量:7
5
作者 HUANG Kan SUN Yi-wei +3 位作者 ZHOU De-quan LI Yu-jian JIANG Meng HUANG Xian-qiang 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第8期2574-2588,共15页
At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groun... At present,shield tunneling often needs to pass through a large number of bridge pile foundations.However,there are few studies on the influence of shield tunneling on adjacent pile foundations by combining with groundwater seepage.Based on Winkler model,the calculation equations of shield tunneling on vertical and horizontal displacement of adjacent bridge pile are derived.Meanwhile,full and part three-dimensional finite element models are established to analyze the trend of bridge pier settlement,ground surface settlement trough,vertical and horizontal displacement of the pile and pile stress under three calculation conditions,i.e.,not considering groundwater effect,considering stable groundwater effect and fluid-soil interaction.The results show that the calculated value is small when the effect of groundwater is not considered;the seepage velocity of the soil above the excavation face is faster than that of the surrounding soil under fluid-soil interaction,and after the shield passing,the groundwater on both sides shows a flow trend of“U”shape on the ground surface supplying to the upper part of the tunnel;the vertical displacement of the pile body is bounded by the horizontal position of the top of the tunnel,the upper pile body settles,and the lower pile body deforms upward.The horizontal displacement of pile body presents a continuous“S”shape distribution,causing stress concentration near the tunnel.The calculated results of fluid-soil interaction are in good agreement with the field measured data and accord with the actual situation. 展开更多
关键词 shield tunnel bridge pile foundation Winkler model fluid-soil interaction numerical analysis
下载PDF
Wind tunnel measurement of aerodynamic characteristics of trains passing each other on a simply supported box girder bridge 被引量:9
6
作者 Xiaozhen Li Yiling Tan +2 位作者 Xiaowei Qiu Zhenhua Gong Ming Wang 《Railway Engineering Science》 2021年第2期152-162,共11页
The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scal... The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas. 展开更多
关键词 Aerodynamic coefficient Two trains passing each other Simply supported box girder bridge Wind tunnel
下载PDF
Particle Swarm-Based Translation Control for Immersed Tunnel Element in the Hong Kong–Zhuhai–Macao Bridge Project 被引量:2
7
作者 LI Jun-jun YANG Xiao-jun +2 位作者 XIAO Ying-jie XU Bo-wei WU Hua-feng 《China Ocean Engineering》 SCIE EI CSCD 2018年第1期32-40,共9页
Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide ... Immersed tunnel is an important part of the Hong Kong–Zhuhai–Macao Bridge(HZMB) project. In immersed tunnel floating, translation which includes straight and transverse movements is the main working mode. To decide the magnitude and direction of the towing force for each tug, a particle swarm-based translation control method is presented for non-power immersed tunnel element. A sort of linear weighted logarithmic function is exploited to avoid weak subgoals. In simulation, the particle swarm-based control method is evaluated and compared with traditional empirical method in the case of the HZMB project. Simulation results show that the presented method delivers performance improvement in terms of the enhanced surplus towing force. 展开更多
关键词 immersed tunnel element translation control Hong Kong–Zhuhai–Macao bridge(HZMB) project particle swarm optimization
下载PDF
Wind tunnel study of aerodynamic wind loading on middle pylon of Taizhou Bridge 被引量:1
8
作者 Zhang Zhen Ma Rujin +1 位作者 Hu Xiaohong Chen Airong 《Engineering Sciences》 EI 2011年第2期69-73,共5页
Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force mea... Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force measuring tests, aerodynamic force coefficients of every segment of the pylon columns have been obtained. It is found that the tested aerodynamic force coefficients are much smaller than those given by codes. The interference effects of aerodynamic force coefficients between columns of pylon are discussed. The results show that the interference effect is the most evident when the yaw angle is about 30 ° from transverse direction. This kind of interference effect can be described as diminutions in transverse aerodynamic force coefficients and magnifications in longitudinal aerodynamic force coefficients of downstream columns. 展开更多
关键词 wind tunnel test aerodynamic force coefficient interference effects segment sectional model tests middle pylon Taizhou bridge
下载PDF
Wind Tunnel Test on the Wind-Resistant Behavior of a Long-Span Cable-Stayed Bridge during Erection
9
作者 马存明 廖海黎 陶奇 《Journal of Southwest Jiaotong University(English Edition)》 2010年第2期112-117,共6页
In order to investigate the aerodynamic behavior of the Sutong bridge over Yangtze River during erection, a 1:50 sectional model of the bridge deck, a 1: 100 full aeroelastic model of the free standing pylon and a 1... In order to investigate the aerodynamic behavior of the Sutong bridge over Yangtze River during erection, a 1:50 sectional model of the bridge deck, a 1: 100 full aeroelastic model of the free standing pylon and a 1: 125 full aeroelastic model for the maxim cantilever configuration were built. The test results show that there was no serious vortex-induced vibration at the bridge deck, and that the free standing tower, the model scale and the turbulence intensity influenced static loading. The buffeting responses during the maximum cantilever configuration did not affect the safety of the bridge under construction. 展开更多
关键词 Cable-stayed bridge Erection stage Aerodynamic behavior Wind tunnel test
下载PDF
Pavement structure and materials design for sea-crossing bridges and tunnel:Case study of the Hong Kong-Zhuhai-Macao Bridge 被引量:1
10
作者 Aimin Sha Wei Jiang +3 位作者 Jinhuan Shan Wangjie Wu Yupeng Li Shuangjiao Zhang 《Journal of Road Engineering》 2022年第2期99-113,共15页
With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology o... With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology of Hong Kong-Zhuhai-Macao Bridge(HZMB),one of the most representative sea-crossing passageways,is instructive for the construction of other large sea-crossing infrastructures.At present,the pavement design method of sea-crossing passageways lacks pertinence as it still refers to specifications for design of common pavement.Therefore,it is necessary to consider the bridge and tunnel pavement of HZMB as a typical example to analyze key technical problems encountered in its design,construction and operation.Novel solutions for material selection and structural design built upon the analysis of such critical problems should thus follow up.Based on comprehensive literature research,it can be found that environmental variability,tunnel closure,structural differential settlement and expansion deformation are the key technical problems faced by pavement of sea-crossing passageways.In view of the environmental variability,the steel deck-paving material and structure design of GMA-10 t SMA-13 is innovatively proposed.As for the closure of immersed tube tunnel,warm-mix flame retardant asphalt mixture is used to control pavement design through key indexes such as temperature and limit oxygen index.Regarding the deformation of immersed pipe joints,BJ200 asphalt seamless expansion joint material is introduced,which effectively satisfies the multi-directional deformation between pipe joints and ensures the smoothness of the road surface and driving comfort.For segmental joints,double-layer waterproof-coiled material is used to effectively prevent reflective cracks while ensuring the continuity of asphalt concrete pavement.Therefore,this paper provides a panel of ideas and methods for the pavement design of the same type of sea-crossing passageways. 展开更多
关键词 Hong Kong-Zhuhai-Macao bridge Steel deck paving Immersed tunnel pavement GMA Flame retardant and smoke suppression Seamless expansion joint
下载PDF
Wind tunnel tests on aerodynamic characteristics of vehicles on same-storey highway and rail bridge under crosswind
11
作者 ZOU Yun-feng XUE Fan-rong +2 位作者 HE Xu-hui HAN Yan LIU Qing-kuan 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2513-2531,共19页
In recent years,the safety and comfort of road vehicles driving on bridges under crosswinds have attracted more attention due to frequent occurrences of wind-induced disasters.This study focuses on a container truck a... In recent years,the safety and comfort of road vehicles driving on bridges under crosswinds have attracted more attention due to frequent occurrences of wind-induced disasters.This study focuses on a container truck and CRH2 high-speed train as research targets.Wind tunnel experiments are performed to investigate shielding effects of trains on aerodynamic characteristics of trucks.The results show that aerodynamic interference between trains and trucks varies with positions of trains(upstream,downstream)and trucks(upwind,downwind)and numbers of trains.To summarize,whether the train is upstream or downstream of tracks has basically no effect on aerodynamic forces,other than moments,of a truck driving on windward sides of bridges(upwind).In contrast,the presence of trains on the bridge deck has a significant impact on aerodynamic characteristics of a truck driving on leeward sides(downwind)at the same time.The best shielding effect on lateral forces of trucks occurs when the train is located downstream of tracks.Finally,the pressure measuring system shows that only lift forces on trains are affected by trucks,while other forces and moments are primarily affected by adjacent trains. 展开更多
关键词 same-storey highway and rail bridge container truck CRH2 high-speed train aerodynamic characteristics wind tunnel test CROSSWIND
下载PDF
Countermeasures for the Maintenance Management of Expressway Bridges and Tunnels
12
作者 Yuan Yin 《Journal of World Architecture》 2022年第3期49-55,共7页
In order to improve the maintenance of expressway bridges and tunnels as well as to maximize the utilization rate of expressway bridges and tunnels,this paper studies the countermeasures for the maintenance management... In order to improve the maintenance of expressway bridges and tunnels as well as to maximize the utilization rate of expressway bridges and tunnels,this paper studies the countermeasures for the maintenance management of expressway bridges and tunnels.Through theoretical analysis,this paper expounds the problems existing in the maintenance management of expressway bridges and tunnels as well as proposes corresponding solutions to these problems.By implementing the countermeasures for the maintenance management of expressway bridges and tunnels,it is possible improve the maintenance effect of expressway bridges and tunnels as well as ensure the smooth and safe operation of expressway bridges and tunnels. 展开更多
关键词 EXPRESSWAY bridgeS tunnel Maintenance management
下载PDF
Analysis on Bearing Capacity of Tunnel-Type Anchorage of a Long-Span Suspension Bridge
13
作者 Zhu Yu Wei Jun +2 位作者 Yang Manjuan Li Hao Liu Hongqing 《Journal of China University of Geosciences》 SCIE CSCD 2005年第3期277-282,共6页
Due to complicated rock structure and environment, a prototype test for a tunnel-type anchorage is infeasible. Based on the rock mass parameters from tests, a three-dimensional (3D) elastoplastic analysis was perfor... Due to complicated rock structure and environment, a prototype test for a tunnel-type anchorage is infeasible. Based on the rock mass parameters from tests, a three-dimensional (3D) elastoplastic analysis was performed to simulate the influence of the construction procedure of Siduhe bridge with tunnel-type anchorage (TTA) in Hubei Province, China. The surrounding rock and concrete anchorage body were simulated by 8 nodes 3D brick elements. The geostatic state of the complex geometric structure was established with initial data. The in-situ concrete casting of the anchorage body and excavation of the rock mass were simulated by tetrahedral shell elements. The results show that the surrounding rock is in an elastic state under the designed cable force. The numerical overloading analysis indicates that the capacity of the surrounding anchorage is 7 times that of the designed cable force. The failure pattern shows that two anchorage bodies would be pulled out in the end. The maximum shear stress appears 10 m before the back anchorage face. The maximum range influenced by the TTA under ultimate loads is about 16 m. 展开更多
关键词 tunnel-type anchorage suspension bridge elasto-plastic analysis bearing capacity
下载PDF
The Hong Kong–Zhuhai–Macao Bridge 被引量:12
14
作者 Yongling Zhu Ming Lin +2 位作者 Fanchao Meng Xiaodong Liu Wei Lin 《Engineering》 SCIE EI 2019年第1期10-14,共5页
The Hong Kong–Zhuhai–Macao Bridge (HZMB) is located at the Pearl River Estuary on the southeast coast of China;it is the longest as-build marine crossings made of island, tunnel, and bridge. It links Hong Kong in th... The Hong Kong–Zhuhai–Macao Bridge (HZMB) is located at the Pearl River Estuary on the southeast coast of China;it is the longest as-build marine crossings made of island, tunnel, and bridge. It links Hong Kong in the east with Zhuhai–Macao in the west with a total length of 55 km. The link was built according to the highway standard of six lanes with three lanes going each way;it has a design speed of 100 km·h^-1 and a design life of 120 years. The HZMB has improved traffic conditions on the east and west sides of the coast of the Pearl River Estuary and strengthened the communication, transportation, and economic integration of the three regions, thus accelerating the formation of the Guangdong–Hong Kong–Macao Greater Bay Area. This paper introduces the design and construction of the HZMB, with a focus on the new technologies involved in building the artificial islands and immersed tunnel. 展开更多
关键词 bridge marine tunnel EAST HAS was is it
下载PDF
Aerodynamic characteristics of a high-speed train crossing the wake of a bridge tower from moving model experiments 被引量:5
15
作者 Jinfeng Wu Xiaozhen Li +1 位作者 C.S.Cai Dejun Liu 《Railway Engineering Science》 2022年第2期221-241,共21页
In a strong crosswind,the wake of a bridge tower will lead to an abrupt change of the aerodynamic forces acting on a vehicle passing through it,which may result in problems related to the transportation safety.This st... In a strong crosswind,the wake of a bridge tower will lead to an abrupt change of the aerodynamic forces acting on a vehicle passing through it,which may result in problems related to the transportation safety.This study investigates the transient aerodynamic characteristics of a high-speed train moving in a truss girder bridge and passing by a bridge tower in a wind tunnel.The scaled ratio of the train,bridge,and tower are 1:30.Effects of various parameters such as the incoming wind speed,train speed,and yaw angle on the aerodynamic performance of the train were considered.Then the sudden change mechanism of aerodynamic loads on the train when it crosses over the tower was further discussed.The results show that the bridge tower has an apparent shielding effect on the train passing through it,with the influencing width being larger than the width of the tower.The train speed is the main factor affecting the influencing width of aerodynamic coefficients,and the mutation amplitude is mainly related to the yaw angle obtained by changing the incoming wind speed or train speed.The vehicle movement introduces an asymmetry of loading on the train in the process of approaching and leaving the wake of the bridge tower,which should not be neglected. 展开更多
关键词 Vehicle aerodynamics Wind tunnel test Moving train bridge tower Shielding effect Sudden change mechanism Truss bridge
下载PDF
Effects of wind barriers on the aerodynamic characteristics of bridge-train system for a road-rail same-story truss bridge 被引量:1
16
作者 LIU Lu-lu ZOU Yun-feng +2 位作者 HE Xu-hui WANG Zhen ZHOU Xu-hong 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2690-2705,共16页
Wind barriers are commonly adopted to prevent the effects of wind on high-speed railway trains,but their wind-proofing effects are greatly affected by substructures.To investigate the effects of wind barriers on the a... Wind barriers are commonly adopted to prevent the effects of wind on high-speed railway trains,but their wind-proofing effects are greatly affected by substructures.To investigate the effects of wind barriers on the aerodynamic characteristic of road-rail same-story truss bridge-train systems,wind tunnel experiments were carried out using a 1:50 scale model.Taking a wind barrier with a porosity of 30%as an example,the aerodynamic characteristics of the bridge train system under different wind barrier layouts(single-sided and double-sided),positions(inside and outside)and heights(2.5 m,3.0 m,3.5 m and 4.0 m)were tested.The results indicate that the downstream inside wind barrier has almost no effect on the aerodynamic characteristics of the train-bridge system,but the downstream outside wind barrier increases the drag coefficient of the bridge and reduces both the lift coefficient and drag coefficient of the train due to its effect on the trains wind pressure distribution,especially on the trains leeward surface.When the wind barriers are arranged on the outside,their effects on the drag coefficient of the bridge and shielding effect on the train are greater than when they are arranged on the inside.As the height of the wind barrier increases,the drag coefficient of the bridge also gradually increases,and the lift coefficient and drag coefficient of the train gradually decrease,but the degree of variation of the aerodynamic coefficient with the height is slightly different due to the different wind barrier layouts.When 3.0 m high double-sided wind barriers are arranged on the outside of the truss bridge,the drag coefficient of the bridge only increases by 12%,while the drag coefficient of the train decreases by 55%. 展开更多
关键词 wind barriers road-rail same-story truss bridge high-speed railway aerodynamic coefficients train-bridge system wind tunnel test
下载PDF
Numerical simulation of aerodynamic derivatives and critical wind speed for long-span bridges based on simplified steady wind field
17
作者 辛大波 欧进萍 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2007年第2期197-203,共7页
Combining the computational fluid dynamics-based numerical simulation with the forced vibration technique for extraction of aerodynamic derivatives, an approach for calculating the aerodynamic derivatives and the crit... Combining the computational fluid dynamics-based numerical simulation with the forced vibration technique for extraction of aerodynamic derivatives, an approach for calculating the aerodynamic derivatives and the critical flutter wind speed for long-span bridges is presented in this paper. The RNG k-ε turbulent model is introduced to establish the governing equations, including the continuity equation and the Navier-Stokes equations, for solving the wind flow field around a two-dimensional bridge section. To illustrate the effectiveness and accuracy of the proposed approach, a simple application to the Hume Bridge in China is provided, and the numerical results show that the aerodynamic derivatives and the critical flutter wind speed obtained agree well with the wind tunnel test results. 展开更多
关键词 aerodynamic derivatives critical flutter wind speed numerical simulation wind tunnel test long-span bridges
下载PDF
Cross-spectral recognition method of bridge deck aerodynamic admittance function
18
作者 Zhao Lin Ge Yaojun 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2015年第4期595-609,共15页
This study proposes a new identification algorithm about the admittance function, which can estimate the full set of six aerodynamic admittance functions considering cross power spectral density functions about the fo... This study proposes a new identification algorithm about the admittance function, which can estimate the full set of six aerodynamic admittance functions considering cross power spectral density functions about the forces and the turbulence components. The method was first numerically validated through Monte Carlo simulations, and then adopted to estimate the aerodynamic admittance of a streamlined bridge deck. The identification method was further validated through a comparison between the numerical calculation and wind tunnel tests on a moving bridge section. © 2015, Institute of Engineering Mechanics, China Earthquake Administration and Springer-Verlag Berlin Heidelberg. 展开更多
关键词 ALGORITHMS bridge decks Intelligent systems Monte Carlo methods Numerical methods Power spectral density Spectral density Wind stress Wind tunnels
下载PDF
Tuning the Mottness in Sr_(3)Ir_(2)O_(7)via Bridging Oxygen Vacancies
19
作者 徐妙 邹昌炜 +8 位作者 龚本超 贾可 叶树森 郝镇齐 刘凯 石友国 卢仲毅 蔡鹏 王亚愚 《Chinese Physics Letters》 SCIE EI CAS CSCD 2023年第3期25-30,共6页
The electronic evolution of Mott insulators into exotic correlated phases remains puzzling,because of electron interaction and inhomogeneity.Introduction of individual imperfections in Mott insulators could help captu... The electronic evolution of Mott insulators into exotic correlated phases remains puzzling,because of electron interaction and inhomogeneity.Introduction of individual imperfections in Mott insulators could help capture the main mechanism and serve as a basis to understand the evolution.Here we utilize scanning tunneling microscopy to probe the atomic scale electronic structure of the spin-orbit-coupling assisted Mott insulator Sr_(3)Ir_(2)O_(7).It is found that the tunneling spectra exhibit a homogeneous Mott gap in defect-free regions,but near the oxygen vacancy in the rotated Ir O_(2)plane the local Mott gap size is significantly enhanced.We attribute the enhanced gap to the locally reduced hopping integral between the 5d electrons of neighboring Ir sites via the bridging planar oxygen p orbitals.Such bridging defects have a dramatic influence on local bandwidth,thus provide a new way to manipulate the strength of Mottness in a Mott insulator. 展开更多
关键词 bridgING tunnelING utilize
下载PDF
时速120 km地铁快线空气动力学试验研究 被引量:1
20
作者 陈勇 李杨 +1 位作者 左建勇 梁习锋 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第3期1156-1167,共12页
为探明设计时速120 km快速地铁列车在多区段桥隧衔接线路运行时的气动效应和气密性能,采用实车试验的方法,在武汉某多区段桥隧衔接地铁快线对某4车编组的新研A型密封性地铁列车开展空气动力学测试。实验测试系统采用LL-250-15A型Kulite... 为探明设计时速120 km快速地铁列车在多区段桥隧衔接线路运行时的气动效应和气密性能,采用实车试验的方法,在武汉某多区段桥隧衔接地铁快线对某4车编组的新研A型密封性地铁列车开展空气动力学测试。实验测试系统采用LL-250-15A型Kulite压力传感器,通过测量列车外部和内部的瞬态压力变化,分析全线路车外压力波动特性,对比沿列车长度方向不同测点位置的压力变化幅值,并分析不同空调状态下的车内压力舒适性。经过3次实验测试分析,该实验的结果具有可重复性。研究结果表明:全线路运行时,列车在隧道段内加减速导致车外压力变化幅值明显大于高架段,气动效应最恶劣的位置为地下段人防门变截面处,列车上行通过该处时车外任意3 s内压力变化幅值为1 071 Pa,下行通过该处时车外任意3 s内压力变化幅值为905 Pa;相对于下行线全线路,上行线车外任意3 s内压力变化幅值大18.3%;列车正线运营时压力波保护阀会在压力变化剧烈区段进行动作响应,列车上行时,空调开启、压力波保护阀正常启用状态下,车内任意3 s内压力变化幅值相对于压力波保护阀打开未启用时减少了16%,下行时,减少了28%,空调压力波保护阀能够有效降低车外压力波动对车内气压变化的影响。本文研究成果可为快速地铁线路设计、地铁列车运营及地铁气密性优化提供参考依据。 展开更多
关键词 地铁快线 桥隧衔接 实车试验 压力波 气密性
下载PDF
上一页 1 2 105 下一页 到第
使用帮助 返回顶部