利用Info Works ICM模型建立深圳市光明新区新城公园雨水管网模型,分别以检查井和雨水口作为模型的节点划分汇水区,分析不同的汇水区划分方式对公园出口流量模拟结果的影响。结果表明:在中小降雨条件下,汇水区节点选取对峰值流量模拟结...利用Info Works ICM模型建立深圳市光明新区新城公园雨水管网模型,分别以检查井和雨水口作为模型的节点划分汇水区,分析不同的汇水区划分方式对公园出口流量模拟结果的影响。结果表明:在中小降雨条件下,汇水区节点选取对峰值流量模拟结果的影响不明显;在暴雨或特大暴雨的条件下,汇水区节点选取对峰值流量模拟结果的影响较大;与以检查井为节点的划分方式相比,以雨水口为节点的划分方式产流时间会有一定程度的推迟;在模型建立过程中应综合考虑研究目标、区域尺度和降雨特征等对汇水区进行合理划分。展开更多
In order to improve the stormwater regulation functions of urban greenways on the basis of literature research and case study the relationships between urban greenway and low impact development LID and green stormwate...In order to improve the stormwater regulation functions of urban greenways on the basis of literature research and case study the relationships between urban greenway and low impact development LID and green stormwater infrastructure GSI are analyzed. Then the classification system of urban greenways is proposed based on their stormwater regulation function and the suitable technical measures for stormwater management which can be used in different kinds of greenways are selected. According to China’s urban planning system the greenway planning method combined with the urban drainage system is developed and the design methods of the greenway stormwater system and individual stormwater facilities are put forward. The relationships between the greenway stormwater system and other systems are also analyzed in terms of stormwater inlet vertical design and overflow.Finally the waterfront greenway and street greenway demonstration projects in Jiaxing City which adopts the above concept and method are introduced. The results show that the reduction rates of annual total stormwater runoff and average total runoff contaminants TSS of the stormwater system are not less than 30% and 40% respectively.展开更多
Construction wastes were selected as the adsorbents and static and dynamic adsorption batch experiments were carried out to investigate the adsorption of Pb to construction wastes with different particle size gradatio...Construction wastes were selected as the adsorbents and static and dynamic adsorption batch experiments were carried out to investigate the adsorption of Pb to construction wastes with different particle size gradations in the simulated stormwater runoff system.The experimental results show that the pseudo-second-order kinetics model can better characterize the adsorption process of Pb than the pseudo-first-order kinetics model.The adsorption equilibrium data can be well fitted by the Freundlich isotherm model. The construction wastes with different tested size gradations can greatly remove Pb from stormwater runoff and their average removal rate can reach up to 99%.The construction wastes with narrow size distribution can better remove Pb but with worse permeability than those with wide size distribution. The particle size gradation of construction wastes greatly influences the equilibrium time rate and the capacity of Pb adsorption.The equilibrium adsorption rate and capacity are 18.1 μg/min and 5.5 μg/g respectively for the construction wastes with the size of 2.36 to 4.75 mm which are the greatest among the different size gradations.The present study provides a scientific basis for effectively controlling Pb pollution from stormwater runoff and the construction wastes resource utilization.展开更多
文摘利用Info Works ICM模型建立深圳市光明新区新城公园雨水管网模型,分别以检查井和雨水口作为模型的节点划分汇水区,分析不同的汇水区划分方式对公园出口流量模拟结果的影响。结果表明:在中小降雨条件下,汇水区节点选取对峰值流量模拟结果的影响不明显;在暴雨或特大暴雨的条件下,汇水区节点选取对峰值流量模拟结果的影响较大;与以检查井为节点的划分方式相比,以雨水口为节点的划分方式产流时间会有一定程度的推迟;在模型建立过程中应综合考虑研究目标、区域尺度和降雨特征等对汇水区进行合理划分。
基金The National Natural Science Foundation of China(No.51208020)
文摘In order to improve the stormwater regulation functions of urban greenways on the basis of literature research and case study the relationships between urban greenway and low impact development LID and green stormwater infrastructure GSI are analyzed. Then the classification system of urban greenways is proposed based on their stormwater regulation function and the suitable technical measures for stormwater management which can be used in different kinds of greenways are selected. According to China’s urban planning system the greenway planning method combined with the urban drainage system is developed and the design methods of the greenway stormwater system and individual stormwater facilities are put forward. The relationships between the greenway stormwater system and other systems are also analyzed in terms of stormwater inlet vertical design and overflow.Finally the waterfront greenway and street greenway demonstration projects in Jiaxing City which adopts the above concept and method are introduced. The results show that the reduction rates of annual total stormwater runoff and average total runoff contaminants TSS of the stormwater system are not less than 30% and 40% respectively.
基金The National Natural Science Foundation of China(No.51208022)the National Science and Technology Major Project of China(No.2011ZX07301-004-01)
文摘Construction wastes were selected as the adsorbents and static and dynamic adsorption batch experiments were carried out to investigate the adsorption of Pb to construction wastes with different particle size gradations in the simulated stormwater runoff system.The experimental results show that the pseudo-second-order kinetics model can better characterize the adsorption process of Pb than the pseudo-first-order kinetics model.The adsorption equilibrium data can be well fitted by the Freundlich isotherm model. The construction wastes with different tested size gradations can greatly remove Pb from stormwater runoff and their average removal rate can reach up to 99%.The construction wastes with narrow size distribution can better remove Pb but with worse permeability than those with wide size distribution. The particle size gradation of construction wastes greatly influences the equilibrium time rate and the capacity of Pb adsorption.The equilibrium adsorption rate and capacity are 18.1 μg/min and 5.5 μg/g respectively for the construction wastes with the size of 2.36 to 4.75 mm which are the greatest among the different size gradations.The present study provides a scientific basis for effectively controlling Pb pollution from stormwater runoff and the construction wastes resource utilization.