The goal of asset management is to identify and track the maintenance and replacement of assets that have reached their useful life. For that reason, gathering data and collecting information is a critical step when d...The goal of asset management is to identify and track the maintenance and replacement of assets that have reached their useful life. For that reason, gathering data and collecting information is a critical step when developing an asset management plan. Such data gathering includes physical and operational properties of the assets as well as collecting and tracking important events during the lifespan of the asset (i.e., pipe breaks, replacement year, maintenance performed, etc.). Critical factors in the asset management plan may be overlooked when there is no data or poor quality data. However, many utilities lack the resources for examining buried infrastructure and lack good quality work order data, so other methods of data collection are needed. The concept for this paper was to develop a means to acquire data on the assets for a condition assessment to identify pipes that were most likely to break and those with the highest consequences for same. Three utilities were used as examples. It was found that for buried infrastructure, much more information was known than anticipated but the actual predictions relied on only a few factors related to pipe type. However, there is a need to track the consequences, in this case breaks, which would indicate a failure. The latter would be useful for predicting future maintenance needs and the most at-risk assets, but is often missing in utility systems as many utilities do not adequately track breaks sufficiently. In this case two utilities were analyzed and predication on a third was developed.展开更多
Nuisance algal blooms have been a topic of discussion in Florida as a result of highly visible adverse impacts to coastal waters, but algae is hardly a new concern for warm weather communities. The typical treatment i...Nuisance algal blooms have been a topic of discussion in Florida as a result of highly visible adverse impacts to coastal waters, but algae is hardly a new concern for warm weather communities. The typical treatment is with copper sulfate. However, copper has been identified by regulatory agencies as a contaminant of concern in coastal waters and has been targeted for stricter regulations, potentially limiting its use in the future for algae control. The EMOH device was proposed as a means to test whether a “green” solution could be found to this algae concern. EMOH creates high volume oxidation in concert with activated organisms. The initial treatment effort covered one year (2016). During treatment, water quality was monitored with periodic measurements of the benthic detrital layer, which is a precursor to algal blooms in these ponds. Photographs of the extent of algal coverage on the surface, water quality in the pond and thickness measurements of the detrital layer defined success. Through the hot summer, despite regular influx of nutrients and rain, the amount of algae declined, and the detrital layer decreased in thickness from 22 - 24 inches to 7 - 8 inches. The decrease of the detrital layer means that over time, the benthic source of nutrient availability can be more controlled. The authors concluded that the EMOH process was successful and that physically removing the detrital layer may be an important step in long-term algal reductions.展开更多
The recharge of non-potable water into a drinking water aquifer is one means to overcome decreasing groundwater supplies and maintain availability of these resources for current and future generations. However, health...The recharge of non-potable water into a drinking water aquifer is one means to overcome decreasing groundwater supplies and maintain availability of these resources for current and future generations. However, health concerns exist regarding the use of waters of “impaired quality” such as reclaimed wastewater for aquifer recharge. The objective of this study is to evaluate the potential risk to drinking water from the use of reclaimed water for recharge purposes using computational modeling with MODFLOW and MT3D groundwater transport simulation based on an actual situation using rotavirus as a surrogate. The results from the simulation showed that after seven months, the risk of contamination based on concentration contours from the injection well to the production wells was stabilized below 10-6.展开更多
文摘The goal of asset management is to identify and track the maintenance and replacement of assets that have reached their useful life. For that reason, gathering data and collecting information is a critical step when developing an asset management plan. Such data gathering includes physical and operational properties of the assets as well as collecting and tracking important events during the lifespan of the asset (i.e., pipe breaks, replacement year, maintenance performed, etc.). Critical factors in the asset management plan may be overlooked when there is no data or poor quality data. However, many utilities lack the resources for examining buried infrastructure and lack good quality work order data, so other methods of data collection are needed. The concept for this paper was to develop a means to acquire data on the assets for a condition assessment to identify pipes that were most likely to break and those with the highest consequences for same. Three utilities were used as examples. It was found that for buried infrastructure, much more information was known than anticipated but the actual predictions relied on only a few factors related to pipe type. However, there is a need to track the consequences, in this case breaks, which would indicate a failure. The latter would be useful for predicting future maintenance needs and the most at-risk assets, but is often missing in utility systems as many utilities do not adequately track breaks sufficiently. In this case two utilities were analyzed and predication on a third was developed.
文摘Nuisance algal blooms have been a topic of discussion in Florida as a result of highly visible adverse impacts to coastal waters, but algae is hardly a new concern for warm weather communities. The typical treatment is with copper sulfate. However, copper has been identified by regulatory agencies as a contaminant of concern in coastal waters and has been targeted for stricter regulations, potentially limiting its use in the future for algae control. The EMOH device was proposed as a means to test whether a “green” solution could be found to this algae concern. EMOH creates high volume oxidation in concert with activated organisms. The initial treatment effort covered one year (2016). During treatment, water quality was monitored with periodic measurements of the benthic detrital layer, which is a precursor to algal blooms in these ponds. Photographs of the extent of algal coverage on the surface, water quality in the pond and thickness measurements of the detrital layer defined success. Through the hot summer, despite regular influx of nutrients and rain, the amount of algae declined, and the detrital layer decreased in thickness from 22 - 24 inches to 7 - 8 inches. The decrease of the detrital layer means that over time, the benthic source of nutrient availability can be more controlled. The authors concluded that the EMOH process was successful and that physically removing the detrital layer may be an important step in long-term algal reductions.
文摘The recharge of non-potable water into a drinking water aquifer is one means to overcome decreasing groundwater supplies and maintain availability of these resources for current and future generations. However, health concerns exist regarding the use of waters of “impaired quality” such as reclaimed wastewater for aquifer recharge. The objective of this study is to evaluate the potential risk to drinking water from the use of reclaimed water for recharge purposes using computational modeling with MODFLOW and MT3D groundwater transport simulation based on an actual situation using rotavirus as a surrogate. The results from the simulation showed that after seven months, the risk of contamination based on concentration contours from the injection well to the production wells was stabilized below 10-6.