Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction.After geological investigation into the dam foundation,a few...Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction.After geological investigation into the dam foundation,a few large-scale weak discontinuities are observed.The rock masses in the left dam foundation are intensively unloaded,approximately to the depth of 150–300 m.These serious geological defects lead to a geological asymmetry on the left and right banks,and thus some major diffculties of dam construction are encountered.In this paper,the influences of geological defects on the project are analyzed,followed by the concepts and methods of treatment design.Based on the analysis,the treatment methods of the weak rock masses and discontinuities are carefully determined,including the concrete cushion,concrete replacement grids,and consolidation grouting.They work together to enhance the strength and integrity of the dam foundation.Evaluations and calibrations through geo-mechanical model tests in combination with feld monitoring results in early impoundment period show that the arch dam and its foundation are roughly stable,suggesting that the treatment designs are reasonable and effective.The proposed treatment methods and concepts in the context can be helpful for similar complex rock projects.展开更多
Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHA...Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHADs will be reviewed and discussed in this and consecutive papers, including Xiluodu, Jinping I in China, Baktiary in Iran, ete. , on the topics of the research method, criterion for evaluation and engineering application of dam safety analysis and evaluation, reasonable dam base interface, dam shape optimization, comprehensive treatments of complex foundation, anti-seismic engineering, dam construction material, concrete placement and temperature control, instrumentation and monitoring of dam operation, etc. This paper will mainly focus on the overall safety of SHADs, reasonable dam base interface analysis and evaluation and their engineering application.展开更多
The statistics on Chinese wind power installed capacity for year 2005 show that the wind power farm construction grew rapidly but the capability of equipment domestication remained weak. Looking back at the events occ...The statistics on Chinese wind power installed capacity for year 2005 show that the wind power farm construction grew rapidly but the capability of equipment domestication remained weak. Looking back at the events occurred in 2005 that have milestone significance for wind power, we can see how they influence the development tendency. Also, this article points out the progress and lessons of wind power in the period of the Tenth Five-Year Plan, and emphasizes that the wind power performance in the coming five years should be appraised based on the capability of equipment domestication and electric energy sent to network.展开更多
文摘Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction.After geological investigation into the dam foundation,a few large-scale weak discontinuities are observed.The rock masses in the left dam foundation are intensively unloaded,approximately to the depth of 150–300 m.These serious geological defects lead to a geological asymmetry on the left and right banks,and thus some major diffculties of dam construction are encountered.In this paper,the influences of geological defects on the project are analyzed,followed by the concepts and methods of treatment design.Based on the analysis,the treatment methods of the weak rock masses and discontinuities are carefully determined,including the concrete cushion,concrete replacement grids,and consolidation grouting.They work together to enhance the strength and integrity of the dam foundation.Evaluations and calibrations through geo-mechanical model tests in combination with feld monitoring results in early impoundment period show that the arch dam and its foundation are roughly stable,suggesting that the treatment designs are reasonable and effective.The proposed treatment methods and concepts in the context can be helpful for similar complex rock projects.
文摘Some super high arch dams ( SHADs), like Xiluodu Arch Dam, after their heights reaching the magnitude of 300 m, confront lots of technical challenges in design and construction. Several crucial technologies of 6 SHADs will be reviewed and discussed in this and consecutive papers, including Xiluodu, Jinping I in China, Baktiary in Iran, ete. , on the topics of the research method, criterion for evaluation and engineering application of dam safety analysis and evaluation, reasonable dam base interface, dam shape optimization, comprehensive treatments of complex foundation, anti-seismic engineering, dam construction material, concrete placement and temperature control, instrumentation and monitoring of dam operation, etc. This paper will mainly focus on the overall safety of SHADs, reasonable dam base interface analysis and evaluation and their engineering application.
文摘The statistics on Chinese wind power installed capacity for year 2005 show that the wind power farm construction grew rapidly but the capability of equipment domestication remained weak. Looking back at the events occurred in 2005 that have milestone significance for wind power, we can see how they influence the development tendency. Also, this article points out the progress and lessons of wind power in the period of the Tenth Five-Year Plan, and emphasizes that the wind power performance in the coming five years should be appraised based on the capability of equipment domestication and electric energy sent to network.