期刊文献+
共找到26篇文章
< 1 2 >
每页显示 20 50 100
Deformation Mechanism and Design Countermeasures of Tunnel Portal in Volcanic Deposit Clay Stratum
1
作者 XIA Jian Engineer Senior ZHENG Mingda(Translated) 《Chinese Railways》 2024年第1期38-45,共8页
Shortly after tunneling,problems such as primary-support through cracks and clearance infringement are found in the shallow-buried section of tunnel No.4 of the Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR),... Shortly after tunneling,problems such as primary-support through cracks and clearance infringement are found in the shallow-buried section of tunnel No.4 of the Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR),and orthogonal cracks can be found on the earth surface in front of the working face,which brings great challenges to the tunnel construction.In view of the above engineering problems,the sliding surface is speculated according to the geological and field conditions,and the impact of landslides is applied in the model in the form of external load.The paper uses the numerical simulation method to analyze and compare the impact of landslides on the tunnel structure and deformation,and puts forward the reinforcement measures.The conclusions of the studies are:(1)under the influence of heavy rainfall,the strength index of volcanic deposit clay stratum drops sharply,and meanwhile the multiple factors including tunnel excavation are liable to cause sliding of the front slope;(2)parallel landslide in front of the tunnel has a great impact on the tunnel,so setting-up of pre-reinforcement measures to control landslide shall be the focus of similar projects during design;(3)the deformation and stress of the tunnel structure can be significantly controlled for safe construction by strengthening the shallow-buried tunnel with pile foundation and longitudinal and transverse beam frames during landslide. 展开更多
关键词 Jakarta-Bandung HSR tunnel clay stratum numerical simulation deformation mechanism anti-slide pile
下载PDF
Design Concept and Innovation of Jakarta-Bandung HSR
2
作者 HE Aikuan ZHAO Dou +4 位作者 GUO Xiaochen ZHANG Baoqun WANG Shujie LIU Xinyu SHEN Meiying(Translated) 《Chinese Railways》 2024年第1期23-29,共7页
This paper analyzes the geographical,climatic,cultural and religious factors that influence station building design,and discusses the characteristics and design concepts of traditional Indonesian building.Additionally... This paper analyzes the geographical,climatic,cultural and religious factors that influence station building design,and discusses the characteristics and design concepts of traditional Indonesian building.Additionally,the following innovative concepts are proposed for station building design:innovation in the building form that organically integrates high speed railway characteristics with regional features;innovation in spatial layout that adapts to the local climate and culture;innovation in flexible flow lines and diverse commercial spaces;innovation in interior design that fully incorporates the local culture.The station buildings of Jakarta-Bandung HSR not only fulfill the function of passenger riding but also serve as prominent landmark structures that spread regional culture and represent the city's image so as to offer valuable insights for the design of high speed railway station buildings in future overseas projects. 展开更多
关键词 Jakarta-Bandung HSR station building design concept INNOVATION spatial layout
下载PDF
The GSM-R Implementation Plan of Jakarta-Bandung High-speed Railway
3
作者 WEN Shiya PENG Liangyong ZHOU Yanfang(Translated) 《Chinese Railways》 2024年第1期46-51,共6页
GSM-R system mainly provides dispatching communication servicessuch as train operation dispatching, realizes wired and wireless dispatchingcommunication, and provides safe and reliable train-ground informationtransmis... GSM-R system mainly provides dispatching communication servicessuch as train operation dispatching, realizes wired and wireless dispatchingcommunication, and provides safe and reliable train-ground informationtransmission services for high-speed train operation control system. Jakarta-Bandung HSR is the first “going global” HSR with whole industry chain built by China. It isconstructed based on CTCS-3 train control system standard. In order to ensure the safetransmission of train control system information under high-speed operation environment, aset of GSM-R system implementation scheme suitable for Jakarta-Bandung HSR is establishedin combination with the actual situation of Jakarta-Bandung HSR, referring to China's GSMRsystem technical standards and according to its actual business requirements. It includesGSM-R core network, wireless subsystem and data number, which can provide reference forthe construction of wireless communication system for China's HSR “going global”. 展开更多
关键词 Jakarta-Bandung HSR GSM-R core network train control
下载PDF
Key Technologies for Design of Changqing Yellow River Super-long Bridge of Zhengzhou Ji'nan HSR
4
作者 ZUO Jiaqiang ZHANG Shang +3 位作者 MA Chenlong WANG Zongfeng ZHANG Hai ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期3-11,共9页
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de... Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge. 展开更多
关键词 Zhengzhou-Ji'nan HSR Changqing Yellow River Super-long Bridge partial cable stayed bridge multi-tower cable-stayed bridge multiple span and long connection bridge design
下载PDF
Comparison of microwave- and thermal-assisted rock fragmentation methods at different temperatures and loading rates
5
作者 Wei Yao Shuai Wang +2 位作者 Bangbiao Wu Ying Xu Kaiwen Xia 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第6期799-819,共21页
Understanding the effects of microwave irradiation and thermal treatment on the dynamic compression and fragmentation properties of rocks is essential to quantify energy consumption in rock engineering.In this study,F... Understanding the effects of microwave irradiation and thermal treatment on the dynamic compression and fragmentation properties of rocks is essential to quantify energy consumption in rock engineering.In this study,Fangshan granite(FG)specimens were exposed to microwave irradiation and heat treatment.The damage of FG specimens induced by these two methods was compared using X-ray CT scanning and ultrasonic wave method.The temperatures of FG after microwave irradiation and thermal treatment were effectively evaluated using a newly proposed technique.A novelty method for precisely determining the geometric features of fragments is developed to estimate the fragmentation energy.Thus,the dynamic uniaxial compressive strength(UCS),the dynamic fragmentation characteristics,and the fragmentation energy of FG after these two pretreatment methods can be reasonably compared.The noticeable distinction of loading rate effect on the dynamic UCS of FG between these two pretreatment methods is first observed.A relationship is established between the dynamic UCS and the damage induced by microwave irradiation and heat treatment.Moreover,fragmentation energy fan analysis is introduced to accurately compare the fragmentation properties of FG after two pretreatment methods in dynamic compression tests. 展开更多
关键词 Fangshan granite Dynamic experiments Microwave irradiation Thermal treatment Loading rate FRAGMENTATION
下载PDF
The Influence of Limestone Powder and Metakaolin Co-Blending on the Hydration Process and Mechanical Properties of Q-Phase Cement
6
作者 XIONG Xuan HE Yongjia +2 位作者 LÜLinnü MA Jie WANG Fazhou 《Journal of Wuhan University of Technology(Materials Science)》 SCIE EI CAS CSCD 2024年第5期1169-1176,共8页
A ternary system comprising Ca_(20)Al_(26)Mg_(3)Si_(3)O_(68)(Q-phase),limestone,and metakaolin is proposed,and its hydration behavior,hydration product phases,microstructure,and mechanical properties are investigated ... A ternary system comprising Ca_(20)Al_(26)Mg_(3)Si_(3)O_(68)(Q-phase),limestone,and metakaolin is proposed,and its hydration behavior,hydration product phases,microstructure,and mechanical properties are investigated and compared with pure Q-phase cement.The results indicate that the ternary system exhibits exceptional and sustained compressive strength even under a 40℃environment,significantly outperforming pure Q-phase.The mechanism lies in that metakaolin effectively inhibits the transformation of metastable phase.Meanwhile,the interactions among Q-phase,limestone,and metakaolin further enhance the cementitious performance.The ternary system effectively addresses potential issues of strength loss in Q-phase cement application,and as a low-carbon cementitious material system,it holds promising potential applications. 展开更多
关键词 Q-phase LIMESTONE METAKAOLIN HYDRATION compressive strength
下载PDF
A method for support stiffness failure identification in a steel spring floating slab track of urban railway: a case study in China
7
作者 Junyuan ZHENG Caiyou ZHAO +4 位作者 Duojia SHI Ping WANG Jian WANG Bolong JIANG Xi SHENG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2024年第3期206-222,共17页
The extensive use of steel spring floating slab tracks has effectively addressed the challenge of alleviating the environmental vibrations induced by urban rail transit systems.However,under the combined action of tra... The extensive use of steel spring floating slab tracks has effectively addressed the challenge of alleviating the environmental vibrations induced by urban rail transit systems.However,under the combined action of train dynamic loads and complex environmental factors,problems,such as the fracture of steel spring vibration isolators and suspension vibrations induced by the uneven settlement of the base,often occur.The failure of isolator support stiffness is often hidden in its early stages and is challenging to identify by conventional detection methods.At the same time,it will aggravate the wheel-rail interaction,accelerate the deterioration of track structure,and even affect the driving safety.This study first establishes a detailed coupled train-floating slab track-foundation analytical model.Then the influence of the vibration isolator support stiffness failure on the dynamic indices of the floating slab track system response is analyzed.A set of defect identification methods that can detect the number of failed steel springs,severity of damage,and their location is proposed.Finally,an intelligent monitoring system for support stiffness of floating slab track is built by combining the density-based spatial clustering of applications with noise algorithm and statistical data analysis and is applied to a rail line in southern China.During a three-year monitoring campaign,a suspension failure and a fracture of a steel spring were each successfully detected and detailed failure information was obtained.Field investigation results were consistent with the damage identification results.After repair,the track structure dynamic response returned to the average pre-damage level and further deterioration had been arrested.The proposed damage identification methods and monitoring system provide an approach for intelligent identification of track structure support stiffness failures. 展开更多
关键词 Floating slab track Support stiffness Detailed analytical model Failure identification Monitoring system
原文传递
A synthetic differencein-differences model for the influence of CR Express on Chongqing's economy
8
作者 Rong Zhang Qi Li 《Railway Sciences》 2024年第3期295-310,共16页
Purpose-The China-Europe Railway Express(CR Express)in Chongqing has operated regularly and undergone large-scale development.Its impact on Chongqing's economic growth has become increasingly evident,necessitating... Purpose-The China-Europe Railway Express(CR Express)in Chongqing has operated regularly and undergone large-scale development.Its impact on Chongqing's economic growth has become increasingly evident,necessitating further research in this field.Design/methodology/approach-This study employs the opening of CR Express as a quasi-natural experiment,designating Chongqing,which inaugurated the CR Express in 2011,as the treatment group.13 provinces and cities that had not yet opened the CR Express until 2017 were selected as the control group.Utilizing panel data from 14 provinces across China spanning from 2006 to 2017,the synthetic control method(SCM)is employed to synthetically construct Chongqing.To quantify the difference in economic development levels between Chongqing with the operation of the CR express and Chongqing without its operation.Key metrics such as gross domestic product(GDP),per capita GDP,total retail sales of consumer goods,import and export value and the proportions of the secondary and tertiary industries are employed to measure urban economic development capabilities.Chongqing is designated as the experimental group,and a double-difference model is constructed to regress the operation of the CR Express against economic development capabilities.Robustness tests are conducted to validate the analytical results.Findings-The results indicate that,compared to provinces without the operation of the CR Express,the initiation of the CR Express in Chongqing significantly enhances the economic development level of the city.The opening of the CR Express exhibits a pronounced positive impact on Chongqing's economic development,and these findings remain robust and effective even after parallel trend tests and placebo tests.Originalitylvalue-The study represents an expansion of the theoretical framework.In contrast to previous studies that relied on a single indicator such as GDP,this study selects six indicators from the dimensions of economy,trade and industry to measure regional economic development capabilities.Furthermore,employing the grey relational analysis method,the study screens these indicators,thereby providing a theoretical basis for the selection of indicators for measuring regional economic development capabilities. 展开更多
关键词 CR Express Regional economic development Synthetic model Difference-indifferences method Papertype Research paper
下载PDF
Features of Tropical Volcanic Rock and Soil of Jakarta-Bandung HSR and Engineering Countermeasures
9
作者 ZHAO Dou WANG Shujie ZHENG Mingda(Translated) 《Chinese Railways》 2024年第1期30-37,共8页
The geological features of three types of tropical volcanic rock and soil distributed along Jakarta-Bandung high-speed railway(HSR),including pozzolanic clayey soil,mud shale and deep soft soil,are studied through fie... The geological features of three types of tropical volcanic rock and soil distributed along Jakarta-Bandung high-speed railway(HSR),including pozzolanic clayey soil,mud shale and deep soft soil,are studied through field and laboratory tests.The paper analyzes the mechanism and causes of engineering geological problems caused by tropical volcanic rock and soil and puts forward measures to control subgrade slope instability by rationally determining project type,making side slope stability control and strengthening waterproofing and drainage.The“zero front slope”tunneling technology at the portal,the simplified excavation method of double-side wall heading and the cross brace construction method of arch protection within the semi-open cut row pile frame in the“mountainside”eccentrically loaded soft soil stratum are adopted to control the instability of tunnel side and front slopes,foundation pits and working faces;CFG or pipe piles shall be used to reinforce soft and expansive foundation or replacement measures shall be taken,and the scheme of blind ditch+double-layer water sealing in ballastless track section shall be put forward to prevent arching deformation of foundation;the treatment measures of CFG pile,pipe pile and vacuum combined piled preloading are adopted to improve the bearing capacity of foundation in deep soft soil section and solve the problems of settlement control and uneven settlement.These engineering countermeasures have been applied during the construction of Jakarta-Bandung HSR and achieved good results. 展开更多
关键词 Jakarta-Bandung HSR tropical volcanic rock and soil engineering geological features engineering geological problems engineering countermeasures
下载PDF
Localized Application of Chinese Standards in Jakarta-Bandung HSR Project
10
作者 WANG Yanchen WANG Shujie SHEN Meiying(Translated) 《Chinese Railways》 2024年第1期13-22,共10页
Jakarta-Bandung HSR in Indonesia is the first“go global”project of China's high speed railway with a whole system,all elements and a whole industry chain,as well as the first overseas project adopting a complete... Jakarta-Bandung HSR in Indonesia is the first“go global”project of China's high speed railway with a whole system,all elements and a whole industry chain,as well as the first overseas project adopting a complete set of Chinese standards.This paper sorts out the differences between relevant standards in China and Indonesia,including those in concrete raw materials,rebar standards and other main material standards,and those in external interface standards,train operation direction requirements,project approval requirements,special acceptance requirements,etc.,and summarizes the realization methods and specific achievements of localized application of Chinese standards during the implementation of Jakarta-Bandung HSR Project,to provide reference for localized application of Chinese standards in overseas projects in the future. 展开更多
关键词 Jakarta-Bandung HSR Chinese standards localized application Indonesian standards overseas projects
下载PDF
Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation 被引量:20
11
作者 Wangping Qian Taiyue Qi +2 位作者 Yunjian Zhao Yizhou Le Haiyang Yi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期88-98,共11页
Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze ... Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze the stratum settlement characteristics of high-speed railway at different crossing angles intersected by metro tunnel, in terms of ground settlement trough, stratum slip line and irregularity of ballastless tracks. According to the evolution of the stratum settlement at different angle regions, an optimized angle is proposed for the actual project design. In order to reduce the influence of stratum settlement on the safety of high-speed railway, an approach of safety assessment is proposed for the shield engineering undercutting high-speed railway, as per Chinese specifications using numerical results and on-site conditions. A case study is conducted for the shield tunnel section crossing the Wuhan-Guangzhou High-speed Railway between the Guangzhou North Railway Station and the Huacheng Road Station, which represents the first metro tunnel project passing below a high-speed railway in China. A series of measures is taken to ensure the safe excavation of the shield tunnel and the operation of the high-speed railway. The results can provide a technical support for performing a safety evaluation between high-speed railways and metro tunnels. 展开更多
关键词 METRO tunnel EXCAVATION High-speed RAILWAY SETTLEMENT characteristics Safety assessment Numerical simulation Case application
下载PDF
Probabilistic limit state design methodof the axial resistance of post grouting pile 被引量:2
12
作者 Zhang Zhitong Gong Weiming +3 位作者 Xie Jiang Dai Guoliang Su Wei Qiao Jinfei 《Journal of Southeast University(English Edition)》 EI CAS 2022年第2期166-170,共5页
The reliability of post grouting pile axial resistance was studied by proposing a design method for its probabilistic limit state,which is represented by the partial coefficients of load,end,and side resistance.The hy... The reliability of post grouting pile axial resistance was studied by proposing a design method for its probabilistic limit state,which is represented by the partial coefficients of load,end,and side resistance.The hyperbolic,modified hyperbolic,and polynomial models were employed to predict the ultimate bearing capacity of test piles that were not loaded to damage in field tests.The results were used for the calculation and calibration of the reliability index.The reliability of the probabilistic limit state design method was verified by an engineering case.The results show that the prediction results obtained from the modified hyperbolic model are closest to those obtained through the static load test.The proposed corresponding values of total,side,and end resistance partial coefficients are 1.84,1.66,and 2.73 when the dead and live load partial coefficients are taken as 1.1 and 1.4,respectively.Meanwhile,the corresponding partial coefficients of total,side,and end resistance are 1.70,1.56,and 2.34 when the dead and live load partial coefficients are taken as 1.2 and 1.4,respectively. 展开更多
关键词 probabilistic limit state design method reliability theory post grouting pile total resistance partial coefficient
下载PDF
Length optimization of straight line connecting turnout on main line in high-speed railway station yard
13
作者 YIN Guo-dong SHI Jin +1 位作者 WEI Qing-chao LAI Lin 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第5期1111-1120,共10页
Taking the development of high-speed railway in China as background, and referring to the dynamic theory and wheel-rail contact mode, dynamic analysis model was established, considering the setting position of straigh... Taking the development of high-speed railway in China as background, and referring to the dynamic theory and wheel-rail contact mode, dynamic analysis model was established, considering the setting position of straight lines and running conditions of train in high-speed railway station yard. Using the established model, and choosing vehicle lateral acceleration and wheel suspension as the evaluation indexes, dynamic characteristic of vehicle traveling in turnout and adjacent area on main line was analyzed, and effects on travelling safety and stability of train aroused by length variation of straight lines were calculated based on analyzing the damping rules of vibration. The results show that, a certain length of straight lines can alleviate the vibration aroused in turnout and curve(turnout), length of straight lines connecting turnouts in different sections on main line was proposed to meet the demand of traveling stability, and shortening or cancelation of straight line for the scale limitation of station yard has less influence on operation safety of train. 展开更多
关键词 high-speed RAILWAY station YARD STRAIGHT line TURNOUT dynamic theory LENGTH OPTIMIZATION
下载PDF
Technical Research and Innovative Practice of Excellent Passenger Stations Design
14
作者 ZHOU Tiezheng WANG Qingyi JIA Huichao 《Chinese Railways》 2022年第1期18-23,共6页
The key points and strategies of the design of railway passenger stations in the new era are described.The distinctive features,design innovation points and design elements of high-quality projects of large transport ... The key points and strategies of the design of railway passenger stations in the new era are described.The distinctive features,design innovation points and design elements of high-quality projects of large transport hubs are analyzed through dissecting two cases of completed projects,ie Xiong'an Station and Beijing Chaoyang Station.In the light of the general requirements for passenger station construction of China State Railway Group Co.Lid the paper elaborates the development and application trends of railway passenger stations ofthe new erain terms of environmental protection,energy saving,economic efficiency,culture,convenient circulation and intelligence.In addition,new concepts,new technologies and new materials are actively developed and key technologies of the design of iconic excellent passenger stations of the new era are explored and summarized. 展开更多
关键词 high speed railway new era passenger station of high speed railway excellent passenger station
下载PDF
高速列车交会振动对邻近建筑内精密仪器的影响及减振措施研究 被引量:2
15
作者 王雨琪 蔡小培 +2 位作者 臧传臻 王启好 汤雪扬 《Journal of Central South University》 SCIE EI CAS CSCD 2023年第9期3097-3112,共16页
随着城际铁路的大力建设,铁路沿线特别是一些放置精密仪器的建筑因振动环境恶化,内部仪器受到反复振动的影响,且当列车高速会车时,引起的振动更为剧烈。本文对邻近线路建筑物内的精密仪器进行数值仿真分析,建立了高速列车会车的耦合模型... 随着城际铁路的大力建设,铁路沿线特别是一些放置精密仪器的建筑因振动环境恶化,内部仪器受到反复振动的影响,且当列车高速会车时,引起的振动更为剧烈。本文对邻近线路建筑物内的精密仪器进行数值仿真分析,建立了高速列车会车的耦合模型,提出一种振动叠加的预测方法。对既有振动数据进行采集,用于模型验证。在此基础上,对精密仪器的振动进行评估并提出相应的减振措施。结果表明,既有振动主频在10~20 Hz,在该频段存在振动超限风险;列车高速会车会导致精密仪器无法正常工作。加装减振垫可以有效缓解列车引起的高频振动(40~80 Hz)影响。列车振动与既有振动叠加后,高层振动以10~20 Hz为主,建议在精密仪器处采取减振措施。 展开更多
关键词 城际铁路 列车交会 振动预测 精密仪器 减振轨道
下载PDF
Anisotropic creep behavior of soft-hard interbedded rock masses based on 3D printing and digital imaging correlation technology 被引量:1
16
作者 TIAN Yun WU Fa-quan +5 位作者 TIAN Hong-ming LI Zhe SHU Xiao-yun HE Lin-kai HUANG Man CHEN Wei-zhong 《Journal of Mountain Science》 SCIE CSCD 2023年第4期1147-1158,共12页
Three-dimensional(3D)printing technology is increasingly used in experimental research of geotechnical engineering.Compared to other materials,3D layer-by-layer printing specimens are extremely similar to the inherent... Three-dimensional(3D)printing technology is increasingly used in experimental research of geotechnical engineering.Compared to other materials,3D layer-by-layer printing specimens are extremely similar to the inherent properties of natural layered rock masses.In this paper,soft-hard interbedded rock masses with different dip angles were prepared based on 3D printing(3DP)sand core technology.Uniaxial compression creep tests were conducted to investigate its anisotropic creep behavior based on digital imaging correlation(DIC)technology.The results show that the anisotropic creep behavior of the 3DP soft-hard interbedded rock mass is mainly affected by the dip angles of the weak interlayer when the stress is at low levels.As the stress level increases,the effect of creep stress on its creep anisotropy increases significantly,and the dip angle is no longer the main factor.The minimum value of the long-term strength and creep failure strength always appears in the weak interlayer within 30°–60°,which explains why the failure of the layered rock mass is controlled by the weak interlayer and generally emerges at 45°.The tests results are verified by comparing with theoretical and other published studies.The feasibility of the 3DP soft-hard interbedded rock mass provides broad prospects and application values for 3DP technology in future experimental research. 展开更多
关键词 3D printing Soft-hard interbedded rock mass Digital imaging correlation technology Weak interlayer Anisotropic creep
下载PDF
Greenhouse gas emission analysis and measurement for urban rail transit: A review of research progress and prospects 被引量:2
17
作者 Zhenzhou Yuan Xiaojing Yuan +4 位作者 Yang Yang Jinjie Chen Yingjie Nie Meng Cao Long Chen 《Digital Transportation and Safety》 2023年第1期36-51,共16页
Rail transit plays a key role in mitigating transportation system carbon emissions.Accurate measurement of urban rail transit carbon emission can help quantify the contribution of urban rail transit towards urban tran... Rail transit plays a key role in mitigating transportation system carbon emissions.Accurate measurement of urban rail transit carbon emission can help quantify the contribution of urban rail transit towards urban transportation carbon emission reduction.Since the whole life cycle of urban rail transit carbon emission measurement involves a wide range of aspects,a systematic framework model is required for analysis.This research reviews the existing studies on carbon emission of urban rail transit.First,the characteristics of urban rail transit carbon emission were determined and the complexity of carbon emission measurement was analyzed.Then,the urban rail transit carbon emission measurement models were compared and analyzed in terms of the selection of research boundaries,the types of greenhouse gas(GHG)emissions calculation,and the accuracy of the measurement.Following that,an intelligent station was introduced to analyze the practical application of digital collaboration technology and energy-saving and carbon-reducing system platforms for rail transit.Finally,the urgent problems and future research directions at this stage were discussed.This research presents the necessity of establishing a dynamic carbon emission factor library and the important development trend of system integration of carbon emission measurement and digital system technology. 展开更多
关键词 Urban rail transit Life cycle assessment(LCA) Greenhouse gas emission Digital collaboration technology Carbon emission factors Climate change Measurement method
下载PDF
Erratum to: Stress analysis of full-length grouted bolt under shear deformation of anchor interface 被引量:1
18
作者 ZHU Zhen-de SHU Xiao-yun +2 位作者 LI Zhe TIAN Hong-ming TIAN Yun 《Journal of Mountain Science》 SCIE CSCD 2023年第6期1806-1806,共1页
下载PDF
Key Technology and Complete-set Equipment for Intelligent Construction of HSR Simply-supported Girder Reinforcement Framework
19
作者 ZHENG Hemin NIU Yuanzhi +4 位作者 YIN Aiguo ZHANG Shaopeng LI Yanyun HUANG Yimiao ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期12-19,共8页
In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-sp... In view of the problems such as backward production mode,poor quality stability,high safety risk and incomplete control system during erection of the reinforcement framework of simply-supported box girders for high-speed railway(HSR),and in combination with the key points and main challenges in the reinforcement framework construction of Guangzhou-Zhanjiang HSR,the overall technical route for the intelligent manufacturing of reinforcement framework of simply-supported box girders is put forward.The component design of reinforcement framework of simply supported box girder is carried out based on BIM,and the feasibility of the scheme is verified through segment assembly test.The assembly techniques are studied in combination with the mesh design scheme to achieve rapid forming of the reinforcement framework.R&D of automatic processing equipment for components,material transshipment equipment,automatic hoisting equipment and technological equipment for assembly clamping fixture are carried out to realize the overall design of equipment production line.An intelligent control system is developed for the whole-process intelligent construction of reinforcement framework to realize the full life-cycle applications for the workshop production and visual management including intelligent layout and quality traceability.The research results systematically optimize and innovate the assembly and forming technologies of reinforcement framework in the prefabrication beam yard of high-speed railway,realize the component processing,automatic assembly and information technology management,improve the construction quality,efficiency and information technology level of intelligent manufacturing of reinforcement framework of railway prefabricated beam as a whole,and reduce the construction cost of the project.The research has realized a major breakthrough in the construction technology of railway prefabricated box girders,which has the extensive technical and market promotion values. 展开更多
关键词 simply-supported box girder reinforcement framework intelligent construction component processing automatic assembly information technology management
下载PDF
Influence of interface crack on dynamic characteristics of CRTSⅢslab ballastless track on bridge 被引量:3
20
作者 YAN Bin CHENG Rui-qi +2 位作者 PANWen-bin XIE Hao-ran FU He-xin 《Journal of Central South University》 SCIE EI CAS CSCD 2022年第8期2665-2674,共10页
The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track ... The damage of the self-compacting concrete in CRTSⅢslab ballastless track on bridge will lead to a partial void of the track slab,which will affect the comfort and safety of the train and the durability of the track slab and bridge structure.In order to study the impact of the interface crack on the dynamic response of CRTSⅢballastless track system on bridge,based on the principle of multi-body dynamics theory and ANSYS+SIMPACK co-simulation,the spatial model of vehicle-track-bridge integration considering the longitudinal stiffness of supports,the track structure and interlayer contact characteristics were established.The dynamic characteristics of the system under different conditions of the width,length and position of the interface crack were analysed,and the limited values of the length and width of the cracks at the track slab edge were proposed.The results show that when the self-compacting concrete does not completely void along the transverse direction of the track slab,the crack has little effect on the dynamic characteristics of the vehicle-track-bridge system.However,when the self-compacting concrete is completely hollowed out along the transverse direction of the track slab,the dynamic amplitudes of the system increase.When the crack length is 1.6 m,the wheel load reduction rate reaches 0.769,which exceeds the limit value and threatens the safety of train operation.The vertical acceleration of the track slab increases by 250.1%,which affects the service life of the track system under the train speed of 200 km/h. 展开更多
关键词 high-speed railway railroad bridge ballastless track interface crack dynamic characteristics finite element
下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部