The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the...The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.展开更多
Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and gro...Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and ground is 5 ~ 8 m.In order to insure the safety of the upper buildings,technologies of parallel cut with large diameter empty hole,one-time initiation and delay by parts,and multiple shallow holes were adopted in the project.The results showed that the maximum value of vertical vibration was limited in the criterion allowance,and the upper buildings were not damaged.Besides,problems were solved that the number of nonel detonator was difficult to meet the requirements of excavating a large cross-section tunnel by blasting,multiple cross-section could’t be initiated simultaneously,and construction efficiency was low,which ensure the construction safety and schedule.展开更多
文摘The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.
文摘Reducing the blasting vibration is important for blasting excavation in subway tunnel construction.Taking the 3rd bid section of Line 3 of Qingdao subway project as an example,the distance between tunnel vault and ground is 5 ~ 8 m.In order to insure the safety of the upper buildings,technologies of parallel cut with large diameter empty hole,one-time initiation and delay by parts,and multiple shallow holes were adopted in the project.The results showed that the maximum value of vertical vibration was limited in the criterion allowance,and the upper buildings were not damaged.Besides,problems were solved that the number of nonel detonator was difficult to meet the requirements of excavating a large cross-section tunnel by blasting,multiple cross-section could’t be initiated simultaneously,and construction efficiency was low,which ensure the construction safety and schedule.