期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Schedule Control of Coal Mine Construction Projects Based on Factor Analysis
1
作者 Lingling Fan Hui Zhang Xiao Li 《Geomaterials》 2013年第3期67-70,共4页
Schedule management is the crucial capability for large-scale coal mining investors to successful finish the construction project, which could get by the accumulation of the long-time institutional executive force and... Schedule management is the crucial capability for large-scale coal mining investors to successful finish the construction project, which could get by the accumulation of the long-time institutional executive force and ability training. By using factor analysis and validation analysis, extracted control factors of schedule management from data have been made in large coal mine construction companies. Some control factors have a greater influence on the schedule management which are the system factor, measures factor, economic controlling factor, behavioral factor, process factor, organization factor, thus the enterprise schedule management system should include the terms of the above factors. 展开更多
关键词 SCHEDULE MANAGEMENT FACTOR FACTOR ANALYSIS Validity ANALYSIS
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部