期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
The practice of project construction and management of Three Gorges ship lock 被引量:2
1
作者 Fan Qixiang Yang Zongli Liu Gang 《Engineering Sciences》 EI 2011年第3期82-87,共6页
The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems... The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock. 展开更多
关键词 三峡船闸工程 项目管理 最新技术 三峡工程 设备制造 管理思想 管理制度 技术创新
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部