This paper proposes an integrated electricity-ther-mal energy management system(EMS)for high-speed railways.First,an operational model is built for the integrated electricity-thermal system,including a train operation...This paper proposes an integrated electricity-ther-mal energy management system(EMS)for high-speed railways.First,an operational model is built for the integrated electricity-thermal system,including a train operation EMS(TO-EMS)model and station operation EMS(SO-EMS)model.In the TO-EMS model,traction grids(TGs)are formulated with a solvable second-order cone programming problem.In the SO-EMS model,station indoor thermal systems are taken into account,and the building heat exchange process and solar radiation influence upon station indoor temperature are also included.Then the TO-EMS and the SO-EMS are coordinated with an alternating direction method of the multipliers-based(ADMM-based)algo-rithm,protecting the privacy and interests both for the train dispatch center and stations.To demonstrate the effectiveness of the proposed railway EMS,a modified realistic high-speed railway segment with six stations in North China with summer and winter scenarios is studied.展开更多
The economic operation of integrated energy system(IES)faces new challenges such as multi-timescale characteristics of heterogeneous energy sources,and cooperative operation of hybrid energy storage system(HESS).To th...The economic operation of integrated energy system(IES)faces new challenges such as multi-timescale characteristics of heterogeneous energy sources,and cooperative operation of hybrid energy storage system(HESS).To this end,this paper investigates the multi-timescale rolling opti-mization problem for IES integrated with HESS.Firstly,the architecture of IES with HESS is established,a comparative analysis is conducted to evaluate the advantages of the HESS over a single energy storage system(SESS)in stabilizing power fluctuations.Secondly,the dayahead and real-time scheduling cost functions of IES are established,the day-ahead scheduling mainly depends on operation costs of the components in IES,the real-time optimal scheduling adopts the Lya-punov optimization method to schedule the battery and hydrogen energy storage in each time slot,so as to minimize the real-time average scheduling operation cost,and the problem of day-ahead and real-time scheduling error,which caused by the uncertainty of the energy storage is solved by online optimization.Finally,the proposed model is verified to reduce the scheduling operation cost and the dispatching error by performing an arithmetic example analysis of the IES in Shanghai,which provides a reference for the safe and stable operation of the IES.展开更多
基金This work was supported in part by the National Key Research and Development Program of China(2016YFB0901900)in part by the National Natural Science Foundation of China(51637008).
文摘This paper proposes an integrated electricity-ther-mal energy management system(EMS)for high-speed railways.First,an operational model is built for the integrated electricity-thermal system,including a train operation EMS(TO-EMS)model and station operation EMS(SO-EMS)model.In the TO-EMS model,traction grids(TGs)are formulated with a solvable second-order cone programming problem.In the SO-EMS model,station indoor thermal systems are taken into account,and the building heat exchange process and solar radiation influence upon station indoor temperature are also included.Then the TO-EMS and the SO-EMS are coordinated with an alternating direction method of the multipliers-based(ADMM-based)algo-rithm,protecting the privacy and interests both for the train dispatch center and stations.To demonstrate the effectiveness of the proposed railway EMS,a modified realistic high-speed railway segment with six stations in North China with summer and winter scenarios is studied.
基金supported by the National Natural Science Foundation of China(No.12171145)。
文摘The economic operation of integrated energy system(IES)faces new challenges such as multi-timescale characteristics of heterogeneous energy sources,and cooperative operation of hybrid energy storage system(HESS).To this end,this paper investigates the multi-timescale rolling opti-mization problem for IES integrated with HESS.Firstly,the architecture of IES with HESS is established,a comparative analysis is conducted to evaluate the advantages of the HESS over a single energy storage system(SESS)in stabilizing power fluctuations.Secondly,the dayahead and real-time scheduling cost functions of IES are established,the day-ahead scheduling mainly depends on operation costs of the components in IES,the real-time optimal scheduling adopts the Lya-punov optimization method to schedule the battery and hydrogen energy storage in each time slot,so as to minimize the real-time average scheduling operation cost,and the problem of day-ahead and real-time scheduling error,which caused by the uncertainty of the energy storage is solved by online optimization.Finally,the proposed model is verified to reduce the scheduling operation cost and the dispatching error by performing an arithmetic example analysis of the IES in Shanghai,which provides a reference for the safe and stable operation of the IES.