期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Numerical simulation on deformation character of surrounding rock masses of Changjiashan tunnel through the gob of coalmine 被引量:5
1
作者 张志沛 《Journal of Coal Science & Engineering(China)》 2006年第2期11-15,共5页
Based on the construction project of the Changjiashan tunnel of the freeway,the variety rule of surrounding rock masses of the tunnel through the gob of coalmine wasstudied by using of finite element methed(FEM).The s... Based on the construction project of the Changjiashan tunnel of the freeway,the variety rule of surrounding rock masses of the tunnel through the gob of coalmine wasstudied by using of finite element methed(FEM).The status of the stress and strain,thevariety of the plastic area were simulated in the whole rock mass before and after thetunnel was excavated.The characters of stress and deformation of surrounding rockmasses were analyzed when the tunnel was built.It concluded from the numerical simula-tion that the influence on the tunneling is great when the tunnel passing through the gob ofcoalmine is excavated,and the relative measures should be taken. 展开更多
关键词 高速公路 公路隧道 常家山隧道 煤矿采空区 围岩变形 数值模拟
下载PDF
Stability assessment of the freeway over the gob of coalmine 被引量:1
2
作者 张志沛 王芝银 刘旭 《Journal of Coal Science & Engineering(China)》 2005年第1期26-30,共5页
The freeway passes over the gob area of the Zaibo coalmine or its neighbor- hood when it is built. It is a noticeable problem that the construction of freeway and the underground coal mining interact, especially the d... The freeway passes over the gob area of the Zaibo coalmine or its neighbor- hood when it is built. It is a noticeable problem that the construction of freeway and the underground coal mining interact, especially the deformation and destruction of the gob area of the coalmine influence the long-term stability of the freeway. In the paper, based on the actual data of the exploration about the gob area of Zaibo coalmine and the built project of the freeway,the variety rule of the coal beds below the freeway was studied by using of FEM during the process of coal mining. The statuses of the stresses and strains,the varieties of the plastic area were simulated in the whole rock mass. The characters of stresses and deformation of the gob area of the coalmine were analyzed and evaluated after the freeway built. The long-term stability of the gob area was pre- dicted. The deformation of the gob area under the freeway has not been finished, and the relative measures must be taken. 展开更多
关键词 煤矿 数值模拟 压力分析 分散度 固体力学 变形机理 围岩
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部