期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Complete Localization of HVDC Back-to-Back Project Realized 被引量:1
1
作者 Yu Xinqiang Liang Xuming +1 位作者 Wang Zuli Ye Qing(Translated) 《Electricity》 2006年第1期21-24,共4页
The first completely localized DC back-to-back project for asynchronous interconnection between Northwest and Central China plays an important role in realizing national power grid interconnection, spurring indigenous... The first completely localized DC back-to-back project for asynchronous interconnection between Northwest and Central China plays an important role in realizing national power grid interconnection, spurring indigenous manufacturing industries and promoting DC transmission equipment. Insisting on the principle of autonomous innovation, this project was based on domestic forces in every aspect, from engineering organization, system design, equipment completion, engineering design, equipment manufacturing and procurement to construction and debugging. By passing through strict quality control, intermediate supervision and acceptance test and assessment, the project has been proved up to world advanced level. 展开更多
关键词 直流输电 电力网 强信号栅极 输电线路 变流器站
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部