期刊文献+
共找到51篇文章
< 1 2 3 >
每页显示 20 50 100
Cloud-Edge Collaborative Federated GAN Based Data Processing for IoT-Empowered Multi-Flow Integrated Energy Aggregation Dispatch
1
作者 Zhan Shi 《Computers, Materials & Continua》 SCIE EI 2024年第7期973-994,共22页
The convergence of Internet of Things(IoT),5G,and cloud collaboration offers tailored solutions to the rigorous demands of multi-flow integrated energy aggregation dispatch data processing.While generative adversarial... The convergence of Internet of Things(IoT),5G,and cloud collaboration offers tailored solutions to the rigorous demands of multi-flow integrated energy aggregation dispatch data processing.While generative adversarial networks(GANs)are instrumental in resource scheduling,their application in this domain is impeded by challenges such as convergence speed,inferior optimality searching capability,and the inability to learn from failed decision making feedbacks.Therefore,a cloud-edge collaborative federated GAN-based communication and computing resource scheduling algorithm with long-term constraint violation sensitiveness is proposed to address these challenges.The proposed algorithm facilitates real-time,energy-efficient data processing by optimizing transmission power control,data migration,and computing resource allocation.It employs federated learning for global parameter aggregation to enhance GAN parameter updating and dynamically adjusts GAN learning rates and global aggregation weights based on energy consumption constraint violations.Simulation results indicate that the proposed algorithm effectively reduces data processing latency,energy consumption,and convergence time. 展开更多
关键词 IOT federated learning generative adversarial network data processing multi-flowintegration energy aggregation dispatch
下载PDF
RL and AHP-Based Multi-Timescale Multi-Clock Source Time Synchronization for Distribution Power Internet of Things
2
作者 Jiangang Lu Ruifeng Zhao +2 位作者 Zhiwen Yu Yue Dai Kaiwen Zeng 《Computers, Materials & Continua》 SCIE EI 2024年第3期4453-4469,共17页
Time synchronization(TS)is crucial for ensuring the secure and reliable functioning of the distribution power Internet of Things(IoT).Multi-clock source time synchronization(MTS)has significant advantages of high reli... Time synchronization(TS)is crucial for ensuring the secure and reliable functioning of the distribution power Internet of Things(IoT).Multi-clock source time synchronization(MTS)has significant advantages of high reliability and accuracy but still faces challenges such as optimization of the multi-clock source selection and the clock source weight calculation at different timescales,and the coupling of synchronization latency jitter and pulse phase difference.In this paper,the multi-timescale MTS model is conducted,and the reinforcement learning(RL)and analytic hierarchy process(AHP)-based multi-timescale MTS algorithm is designed to improve the weighted summation of synchronization latency jitter standard deviation and average pulse phase difference.Specifically,the multi-clock source selection is optimized based on Softmax in the large timescale,and the clock source weight calculation is optimized based on lower confidence bound-assisted AHP in the small timescale.Simulation shows that the proposed algorithm can effectively reduce time synchronization delay standard deviation and average pulse phase difference. 展开更多
关键词 Multi-clock source time synchronization(TS) power Internet of Things reinforcement learning analytic hierarchy process
下载PDF
Evaluation of Multi-Temporal-Spatial Scale Adjustment Capability and Cluster Optimization Operation Method for Distribution Networks with Distributed Photovoltaics
3
作者 Jiaxin Qiao Yuchen Hao +2 位作者 Yingqi Liao Fang Liang Jing Bian 《Energy Engineering》 EI 2024年第9期2655-2680,共26页
Themassive integration of high-proportioned distributed photovoltaics into distribution networks poses significant challenges to the flexible regulation capabilities of distribution stations.To accurately assess the f... Themassive integration of high-proportioned distributed photovoltaics into distribution networks poses significant challenges to the flexible regulation capabilities of distribution stations.To accurately assess the flexible regulation capabilities of distribution stations,amulti-temporal and spatial scale regulation capability assessment technique is proposed for distribution station areas with distributed photovoltaics,considering different geographical locations,coverage areas,and response capabilities.Firstly,the multi-temporal scale regulation characteristics and response capabilities of different regulation resources in distribution station areas are analyzed,and a resource regulation capability model is established to quantify the adjustable range of different regulation resources.On this basis,considering the limitations of line transmission capacity,a regulation capability assessment index for distribution stations is proposed to evaluate their regulation capabilities.Secondly,considering different geographical locations and coverage areas,a comprehensive performance index based on electrical distance modularity and active power balance is established,and a cluster division method based on genetic algorithms is proposed to fully leverage the coordination and complementarity among nodes and improve the active power matching degree within clusters.Simultaneously,an economic optimization model with the objective of minimizing the economic cost of the distribution station is established,comprehensively considering the safety constraints of the distribution network and the regulation constraints of resources.This model can provide scientific guidance for the economic dispatch of the distribution station area.Finally,case studies demonstrate that the proposed assessment and optimization methods effectively evaluate the regulation capabilities of distribution stations,facilitate the consumption of distributed photovoltaics,and enhance the economic efficiency of the distribution station area. 展开更多
关键词 Distributed photovoltaic distribution station area assessment of adjustment capacity line transmission capacity economic optimization
下载PDF
Distribution Line Longitudinal ProtectionMethod Based on Virtual Measurement Current Restraint
4
作者 WeiWang Yang Yu +3 位作者 Simin Luo Wenlin Liu Wei Tang Yuanbo Ye 《Energy Engineering》 EI 2024年第2期315-337,共23页
As an effective approach to achieve the“dual-carbon”goal,the grid-connected capacity of renewable energy increases constantly.Photovoltaics are the most widely used renewable energy sources and have been applied on ... As an effective approach to achieve the“dual-carbon”goal,the grid-connected capacity of renewable energy increases constantly.Photovoltaics are the most widely used renewable energy sources and have been applied on various occasions.However,the inherent randomness,intermittency,and weak support of grid-connected equipment not only cause changes in the original flow characteristics of the grid but also result in complex fault characteristics.Traditional overcurrent and differential protection methods cannot respond accurately due to the effects of unknown renewable energy sources.Therefore,a longitudinal protection method based on virtual measurement of current restraint is proposed in this paper.The positive sequence current data and the network parameters are used to calculate the virtual measurement current which compensates for the output current of photovoltaic(PV).The waveform difference between the virtual measured current and the terminal current for internal and external faults is used to construct the protection method.An improved edit distance algorithm is proposed to measure the similarity between virtual measurement current and terminal measurement current.Finally,the feasibility of the protection method is verified through PSCAD simulation. 展开更多
关键词 Photovoltaic interconnection distribution network longitudinal protection method edit distance algorithm
下载PDF
Partitioning Calculation Method of Short-Circuit Current for High Proportion DG Access to Distribution Network
5
作者 Wei Wang Qingzhu Shao +4 位作者 Shaoliang Wang Yiwei Zhao Yuanbo Ye Duanchao Li Mengyu Wu 《Energy Engineering》 EI 2024年第9期2569-2584,共16页
Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioni... Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioning calculation method considering the degree of voltage drop at the grid-connected point of DG.Firstly,the output characteristics of DG in the process of low voltage ride through are analyzed,and the equivalent output model of DG in the fault state is obtained.Secondly,by studying the network voltage distribution law after fault in distribution networks under different DG penetration rates,the degree of voltage drop at the grid-connected point of DG is used as a partition index to partition the distribution network.Then,iterative computation is performed within each partition,and data are transferred between partitions through split nodes to realize the fast partition calculation of short-circuit current for high proportion DG access to distribution network,which solves the problems of long iteration time and large calculation error of traditional short-circuit current.Finally,a 62-node real distribution network model containing a high proportion of DG access is constructed onMATLAB/Simulink,and the simulation verifies the effectiveness of the short-circuit current partitioning calculation method proposed in the paper,and its calculation speed is improved by 48.35%compared with the global iteration method. 展开更多
关键词 High proportion DG short-circuit calculation low voltage ride through partition iteration
下载PDF
Modeling of Large-Scale Hydrogen Storage System Considering Capacity Attenuation and Analysis of Its Efficiency Characteristics
6
作者 Junhui Li Haotian Zhang +4 位作者 Cuiping Li Xingxu Zhu Ruitong Liu Fangwei Duan Yongming Peng 《Energy Engineering》 EI 2024年第2期291-313,共23页
In the existing power system with a large-scale hydrogen storage system,there are problems such as low efficiency of electric-hydrogen-electricity conversion and single modeling of the hydrogen storage system.In order... In the existing power system with a large-scale hydrogen storage system,there are problems such as low efficiency of electric-hydrogen-electricity conversion and single modeling of the hydrogen storage system.In order to improve the hydrogen utilization rate of hydrogen storage system in the process of participating in the power grid operation,and speed up the process of electric-hydrogen-electricity conversion.This article provides a detailed introduction to the mathematical and electrical models of various components of the hydrogen storage unit,and also establishes a charging and discharging efficiency model that considers the temperature and internal gas partial pressure of the hydrogen storage unit.These models are of great significance for studying and optimizing gas storage technology.Through these models,the performance of gas storage units can be better understood and improved.These studies are very helpful for improving energy storage efficiency and sustainable development.The factors affecting the charge-discharge efficiency of hydrogen storage units are analyzed.By integrating the models of each unit and considering the capacity degradation of the hydrogen storage system,we can construct an efficiency model for a large hydrogen storage system and power conversion system.In addition,the simulation models of the hydrogen production system and hydrogen consumption system were established in MATLAB/Simulink.The accuracy and effectiveness of the simulation model were proved by comparing the output voltage variation curve of the simulation with the polarization curve of the typical hydrogen production system and hydrogen consumption system.The results show that the charge-discharge efficiency of the hydrogen storage unit increases with the increase of operating temperature,and H2 and O2 partial voltage have little influence on the charge-discharge efficiency.In the process of power conversion system converter rectification operation,its efficiency decreases with the increase of temperature,while in the process of inverter operation,power conversion system efficiency increases with the increase of temperature.Combined with the efficiency of each hydrogen storage unit and power conversion system converter,the upper limit of the capacity loss of different hydrogen storage units was set.The optimal charge-discharge efficiency of the hydrogen storage system was obtained by using the Cplex solver at 36.46%and 66.34%. 展开更多
关键词 Hydrogen storage system simulation modeling ELECTROLYZER fuel cell capacity loss
下载PDF
Research on Regulation Method of Energy Storage System Based on Multi-Stage Robust Optimization
7
作者 Zaihe Yang Shuling Wang +3 位作者 Runhang Zhu Jiao Cui Ji Su Liling Chen 《Energy Engineering》 EI 2024年第3期807-820,共14页
To address the scheduling problem involving energy storage systems and uncertain energy,we propose a method based on multi-stage robust optimization.This approach aims to regulate the energy storage system by using a ... To address the scheduling problem involving energy storage systems and uncertain energy,we propose a method based on multi-stage robust optimization.This approach aims to regulate the energy storage system by using a multi-stage robust optimal control method,which helps overcome the limitations of traditional methods in terms of time scale.The goal is to effectively utilize the energy storage power station system to address issues caused by unpredictable variations in environmental energy and fluctuating load throughout the day.To achieve this,a mathematical model is constructed to represent uncertain energy sources such as photovoltaic and wind power.The generalized Benders Decomposition method is then employed to solve the multi-stage objective optimization problem.By decomposing the problem into a series of sub-objectives,the system scale is effectively reduced,and the algorithm’s convergence ability is improved.Compared with other algorithms,the multi-stage robust optimization model has better economy and convergence ability and can be used to guide the power dispatching of uncertain energy and energy storage systems. 展开更多
关键词 Multi-stage robust optimization energy storage system regulation methods output uncertainty
下载PDF
Research of Security Constrained Dispatching for Monthly Generation Plan
8
作者 Rui Ge Hai-chao Wang Dun-nan Liu 《Energy and Power Engineering》 2013年第4期612-615,共4页
The dispatching for monthly generation plan is to manage the congestion considering the security constrains of the power grid, where the monthly generation plan is the result of vary monthly power exchange, including ... The dispatching for monthly generation plan is to manage the congestion considering the security constrains of the power grid, where the monthly generation plan is the result of vary monthly power exchange, including long-term power contract, power exchange among provinces and generation constitution exchanges. The application of monthly security constrained dispatching is with significant meaning for the security and stability of power grid. This paper brings forward the purpose and contents of security dispatching and introduces the working procedure and mathematic models. At last, the practical example of the Anhui Province power grid is introduced to explain the models. 展开更多
关键词 Direct PURCHASE by Major USERS Security CONSTRAINED DISPATCHING MONTHLY Generation PLAN
下载PDF
Emergency Control Strategy Based on Multi-agent Theory under Blackout
9
作者 Bin Sun Ming Liu +3 位作者 Luofang Zhu Nian Liu Xiaoyan Qiu Zhe Zhuang 《Energy and Power Engineering》 2013年第4期717-721,共5页
The multi-agent theory is introduced and applied in the way to strike the control amount of emergency control according to stability margin, based on which an emergency control strategy of the power system is presente... The multi-agent theory is introduced and applied in the way to strike the control amount of emergency control according to stability margin, based on which an emergency control strategy of the power system is presented. The multi-agent control structure which is put forward in this article has three layers: system agent, areal agent and local agents. System agent sends controlling execution signal to the load-local agent according to the position and the amount of load shedding upload from areal agent;The areal agent judges whether the power system is stable by monitoring and analyzing the maximum relative power angle. In the condition of instability, determines the position of load-shedding, and the optimal amount of load-shedding according to the stability margin based on the corrected transient energy function, upload control amount to system agent;local-generator agent is mainly used for real-time monitoring the power angle of generator sets and uploading it to the areal agency, local-loads agent control load by receiving the control signal from system agent. Simulations on IEEE39 system show that the proposed control strategy improves the system stability. 展开更多
关键词 MULTI-AGENT Corrected TRANSIENT Energy FUNCTION EMERGENCY Control Stability MARGIN
下载PDF
Optimal Dispatching Model Considering the Pumped Sto-rage Power Plant in Hunan
10
作者 Xinfan Jiang Dunnan Liu +1 位作者 Siyuan Zhang Wenlei Zhang 《Energy and Power Engineering》 2013年第4期608-611,共4页
This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical... This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical requirement of dispatching. Then it brings forward the intelligent optimization model and set up running model for pumped storage power station of Hei Mi-feng. At last, it introduces the application of pumped storage power station in Hunan power grid and proves the effectiveness of the optimization models. 展开更多
关键词 Intelligent Optimization DISPATCHING Model PUMPED Storage Power STATION
下载PDF
Endogenous Security-Aware Resource Management for Digital Twin and 6G Edge Intelligence Integrated Smart Park 被引量:3
11
作者 Sunxuan Zhang Zijia Yao +3 位作者 Haijun Liao Zhenyu Zhou Yilong Chen Zhaoyang You 《China Communications》 SCIE CSCD 2023年第2期46-60,共15页
The integration of digital twin(DT)and 6G edge intelligence provides accurate forecasting for distributed resources control in smart park.However,the adverse impact of model poisoning attacks on DT model training cann... The integration of digital twin(DT)and 6G edge intelligence provides accurate forecasting for distributed resources control in smart park.However,the adverse impact of model poisoning attacks on DT model training cannot be ignored.To address this issue,we firstly construct the models of DT model training and model poisoning attacks.An optimization problem is formulated to minimize the weighted sum of the DT loss function and DT model training delay.Then,the problem is transformed and solved by the proposed Multi-timescAle endogenouS securiTy-aware DQN-based rEsouRce management algorithm(MASTER)based on DT-assisted state information evaluation and attack detection.MASTER adopts multi-timescale deep Q-learning(DQN)networks to jointly schedule local training epochs and devices.It actively adjusts resource management strategies based on estimated attack probability to achieve endogenous security awareness.Simulation results demonstrate that MASTER has excellent performances in DT model training accuracy and delay. 展开更多
关键词 smart park digital twin(DT) 6G edge intelligence resource management endogenous security awareness
下载PDF
Inter-Provincial Transaction Model in Two-Level ElectricityMarket Considering Carbon Emission and Consumption Responsibility Weights
12
作者 Chunlei Jiao HongyanHao +4 位作者 Ming Li Rifucairen Fu Yichun Liu Shunfu Lin Ronghui Liu 《Energy Engineering》 EI 2023年第10期2393-2416,共24页
In the context of the joint operation of China’s intra-provincial markets and inter-provincial trading,how to meet the load demand and energy consumption using inter-provincial renewable energy trading is a key probl... In the context of the joint operation of China’s intra-provincial markets and inter-provincial trading,how to meet the load demand and energy consumption using inter-provincial renewable energy trading is a key problem.The combined operation of intra-provincial and inter-provincial markets provides a new way for provincial power companies to optimize and clear the intra-provincial power market,complete the intra-provincial consumption responsibility weight index,and consume renewable energy across provinces and regions.This paper combines power generation and consumption within the province,uses inter-provincial renewable energy trading tomeet the load demand within the province and completes the index of intra-provincial consumption responsibility weights.The intra-provincial market trading and inter-provincial market clearing are respectively taken as the upper and lower levels of the model.Under the two-level electricity market operation framework,the upper-level model aims to minimize the expected total operating cost within the province considering the carbon emission cost and the weight of the consumption responsibility,while the lower-level model aims to minimize the inter-provincial renewable energy purchasing cost.Finally,the influence of inter-provincial transaction mechanism,risk aversion coefficient,voucher price,and responsibility weight on operating cost is analyzed.Simulation is used to verify that the proposed model can meet the requirements of the provincial load power consumption and the consumption responsibility weight index,and promote the consumption of renewable energy. 展开更多
关键词 Consumption responsibility weights electricity market carbon emission transactions between provinces
下载PDF
Low-Carbon Dispatching for Virtual Power Plant with Aggregated Distributed Energy Storage Considering Spatiotemporal Distribution of Cleanness Value
13
作者 Hongchao Gao Tai Jin +3 位作者 Guanxiong Wang Qixin Chen Chongqing Kang Jingkai Zhu 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2024年第2期346-358,共13页
The scale of distributed energy resources is increasing,but imperfect business models and value transmission mechanisms lead to low utilization ratio and poor responsiveness.To address this issue,the concept of cleann... The scale of distributed energy resources is increasing,but imperfect business models and value transmission mechanisms lead to low utilization ratio and poor responsiveness.To address this issue,the concept of cleanness value of distributed energy storage(DES)is proposed,and the spatiotemporal distribution mechanism is discussed from the perspectives of electrical energy and cleanness.Based on this,an evaluation system for the environmental benefits of DES is constructed to balance the interests between the aggregator and the power system operator.Then,an optimal low-carbon dispatching for a virtual power plant(VPP)with aggregated DES is constructed,where-in energy value and cleanness value are both considered.To achieve the goal,a green attribute labeling method is used to establish a correlation constraint between the nodal carbon potential of the distribution network(DN)and DES behavior,but as a cost,it brings multiple nonlinear relationships.Subsequently,a solution method based on the convex envelope(CE)linear re-construction method is proposed for the multivariate nonlinear programming problem,thereby improving solution efficiency and feasibility.Finally,the simulation verification based on the IEEE 33-bus DN is conducted.The simulation results show that the multidimensional value recognition of DES motivates the willingness of resource users to respond.Meanwhile,resolving the impact of DES on the nodal carbon potential can effectively alleviate overcompensation of the cleanness value. 展开更多
关键词 Distributed energy storage virtual power plant(VPP) spatiotemporal distribution low-carbon dispatching
原文传递
Trans-regional transmission of large-scale hydropower: problems and solutions in receiving power grid 被引量:5
14
作者 Jianyu Lu Jianjian Shen +1 位作者 Chengguo Su Qianqian Shen 《Global Energy Interconnection》 2019年第4期342-350,共9页
Large-capacity hydropower transmission from southwestern China to load centers via ultra-high voltage direct current(UHVDC) or ultra-high voltage alternating current(UHVAC) transmission lines is an important measure o... Large-capacity hydropower transmission from southwestern China to load centers via ultra-high voltage direct current(UHVDC) or ultra-high voltage alternating current(UHVAC) transmission lines is an important measure of the accommodation of large-scale hydropower in China. The East China Grid(ECG) is the main hydropower receiver of the west–east power transmission channel in China. Moreover, it has been subject to a rapidly increasing rate of hydropower integration over the past decade. Currently, large-scale outer hydropower is one of the primary ECG power sources. However, the integration of rapidly increasing outer hydropower into the power grid is subject to a series of severe drawbacks. Therefore, this study considered the load demands and hydropower transmission characteristics for the analysis of several major problems and the determination of appropriate solutions. The power supply-demand balance problem, hydropower transmission schedule problem, and peakshaving problem were considered in this study. Correspondingly, three solutions are suggested in this paper, which include coordination between the outer hydropower and local power sources, an inter-provincial power complementary operation, and the introduction of a market mechanism. The findings of this study can serve as a basis to ensure that the ECG effectively receives an increased amount of outer hydropower in the future. 展开更多
关键词 HYDROPOWER integration multi-energy COORDINATION MULTI-POWER grid COORDINATION
下载PDF
Information acquisition technology for small hydropower stations in remote areas based on high-and low-orbit satellites 被引量:3
15
作者 Zanhong Wu Xiangye Chen Guanxian Wu 《Global Energy Interconnection》 EI CAS CSCD 2021年第5期513-519,共7页
With a lack of coverage in private and public power communication networks,especially for collection of information from hydropower stations in remote areas,communication coverage is a significant issue.Satellite comm... With a lack of coverage in private and public power communication networks,especially for collection of information from hydropower stations in remote areas,communication coverage is a significant issue.Satellite communication provides a large coverage area suitable for a variety of services and is less affected by geographical factors;moreover,the costs are independent of the communication distance.This study investigates information acquisition technology for small hydropower stations in remote areas using high-and low-orbit satellites.The information collection needs of small hydropower stations in remote areas are analyzed,and an information acquisition system is designed using high-and low-orbit satellites.For network security protection,network anomaly detection technology based on a support vector machine algorithm is proposed.The effectiveness of information collection was evaluated and verified for small hydropower plants in remote areas.The system provides technical support for“full coverage,full collection,and full monitoring”of the measurement automation information acquisition system. 展开更多
关键词 Small hydropower information collection High-and low-orbit satellite communication Satellite communication security Support vector machine
下载PDF
BP-LMS-based BDS-3 power system positioning method 被引量:1
16
作者 Ruifeng Zhao Jiangang Lu +2 位作者 Wenxin Guo Wenjie Zheng Shiming Li 《Global Energy Interconnection》 EI CAS CSCD 2022年第6期666-674,共9页
The BeiDou-3 navigation satellite system(BDS-3)provides a full-domain high-precision positioning service for the power system to ensure safe and stable operation.However,BDS-3 power system positioning faces certain ch... The BeiDou-3 navigation satellite system(BDS-3)provides a full-domain high-precision positioning service for the power system to ensure safe and stable operation.However,BDS-3 power system positioning faces certain challenges,such as complex electromagnetic interference and incomplete error elimination.Herein,a back propagation neural network-improved least mean square(BP-LMS)adaptive filtering method is proposed for the BDS-3 full-domain and high-precision power system positioning,which utilizes the loss function to update the weight of the BP hidden layer,computes the pseudo compensation range,and eliminates the impact of electromagnetic interference to enhance the accuracy of power system positioning.Simulation results confirm the superior performance of BP-LMS in positioning accuracy and error elimination.Compared with LMS and normalized least mean square(NLMS),the filtering error of the proposed BP-LMS adaptive filtering method is decreased by 57.14%and 51.38%,respectively. 展开更多
关键词 BDS-3 BP-LMS Error elimination Full-domain and high-precision positioning Power system
下载PDF
Increased summer electric power demand in Beijing driven by preceding spring tropical North Atlantic warming 被引量:1
17
作者 Liwei Huo Ji Wang +5 位作者 Dachao Jin Jingjia Luo Haibo Shen Xiaoxiao Zhang Jingjing Min Yi Xiao 《Atmospheric and Oceanic Science Letters》 CSCD 2022年第1期62-67,共6页
By using electric power data,observational station temperature data in Beijing,CN05.1 temperature data,ERA5 atmospheric reanalysis data,and ERSST.v3 b sea surface temperature(SST) data,it is found that summer(JulyAugu... By using electric power data,observational station temperature data in Beijing,CN05.1 temperature data,ERA5 atmospheric reanalysis data,and ERSST.v3 b sea surface temperature(SST) data,it is found that summer(JulyAugust) electric power demand in Beijing is remarkably positively correlated with the previous spring(MarchApril) tropical North Atlantic(TNA) SST anomaly(SSTA).The possible physical mechanism of the TNA SSTA affecting summer electric power in Beijing is also revealed.When a positive SSTA occurs in the TNA during spring,anomalous easterlies prevail over the tropical central Pacific,which can persist to the following summer.Trade winds are thus enhanced over the northern Pacific,which favors a strengthening of upwelling cold water in the tropical central-eastern Pacific.As a result,a negative SSTA appears in the central-eastern Pacific in summer,which means a La Nina event is triggered by the previous TNA SSTA through the Bjerknes feedback.During the La Nina event,an anomalous anticyclonic circulation occupies the northwestern Pacific.The southerly anomalies at the western edge of this anomalous anticyclone strengthen the transportation of warm and humid airflow from the low latitudes to North China,where Beijing is located,causing higher summer temperatures and increased electricity usage for air conditioning,and vice versa.The results of this study might provide a new scientific basis and dues for the seasonal prediction of summer electric power demand in Beijing. 展开更多
关键词 Electric power SUMMER BEIJING Tropical North Atlantic Sea surface temperature
下载PDF
The Research on Neutral Grounding Scheme of Fengxian 35kV and 10 kV Power Grid 被引量:1
18
作者 Siming Hua Hua Zhang +2 位作者 Feng Qian Chunjie Chen Meixia Zhang 《Energy and Power Engineering》 2013年第4期897-901,共5页
Combined with actual situation of Fengxian power Supply Company, the neutral grounding modes of Fengxian 35 kV and 10 kV power grid are studied in the paper. The different frequencies injected method is used to measur... Combined with actual situation of Fengxian power Supply Company, the neutral grounding modes of Fengxian 35 kV and 10 kV power grid are studied in the paper. The different frequencies injected method is used to measure the capacitive current of Fengxian 28 substations, and the neutral grounding modes of the 28 substations are determined based on the measured values of capacitive current. 展开更多
关键词 NEUTRAL GROUNDING Mode Different Frequency Injected Method Capacitive Current ARC SUPPRESSION COIL Low Resistance
下载PDF
Research on the Fault Location Principle for the Earthing Electrode Line of the UHVDC Transmission System
19
作者 Xu Peng Yu Jiang 《Energy and Power Engineering》 2013年第4期1198-1201,共4页
The UHVDC transmission line transports large-capacity power, and its safety operation has very important rule on the safe operation of grid. Currently, in the DC transmission system, the earthing electrode line has th... The UHVDC transmission line transports large-capacity power, and its safety operation has very important rule on the safe operation of grid. Currently, in the DC transmission system, the earthing electrode line has the functions of ground potential fixing and bipolar imbalance current circulation during the operation of bipolar balance. Therefore the monitoring to the earthing electrode line operation is very essential. This article firstly introduced the current situation of the research on the earthing electrode line fault location method, then built the relevant PSCAD/EMTDC model for simulation verification of the current using Time Domain Reflectometry for the UHVDC earthing electrode line, and at last analyzed the reasons for the formation of the blind monitoring zones. 展开更多
关键词 EARTHING ELECTRODE LINE Pulse REFLECTION Method
下载PDF
Research on Optimization for Units Start During Power System Restoration
20
作者 Jun Chen Wei-xing Zhao +4 位作者 Hua-ying Su Jia-lin Bai Nian Liu Xiao-yan Qiu Qian Liao 《Energy and Power Engineering》 2013年第4期708-712,共5页
Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization pr... Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization problem of units starting in power system restoration period in this paper, and the objective of the model is to maximize the total power generation capability. A relative effectiveness assessment based on a improving data envelopment analysis is adopted to select the initial units to be started, genetic algorithms are employed to solve the knapsack problem to determine the most reasonable units be started at the current time. Finally, IEEE-39 bus system simulation result proves that the proposed model is feasible and effective. 展开更多
关键词 POWER system UNITS START DATA envelopment analysis KNAPSACK PROBLEM
下载PDF
上一页 1 2 3 下一页 到第
使用帮助 返回顶部