期刊文献+
共找到301篇文章
< 1 2 16 >
每页显示 20 50 100
Enhanced Electric Power Adaptability Using Hybrid Pumped-Hydro Technology with Wind and Photovoltaic Integration
1
作者 Uwem O.Ikitde Abayomi A.Adebiyi +1 位作者 Innocent E.Davidson Ayodeji S.Akinyemi 《Energy Engineering》 EI 2023年第9期1939-1961,共23页
The integration of solar and wind energy into the electrical grid has received global research attention due to their unpredictable characteristics.Because wind energy varies across all timescales of utility activity,... The integration of solar and wind energy into the electrical grid has received global research attention due to their unpredictable characteristics.Because wind energy varies across all timescales of utility activity,renewable energy generation should be supplemented and enhanced,from real-time,minute-to-minute variations to annual alterations influencing long-termstrategy.Wind energy generation does not only fluctuate but is also challenging to accurately forecast the timeframes of significance to electricity decision makers;day-ahead and long-term making plans of framework sufficiency such as meeting the network peak load annually.A utility that integrates wind and solar energy into its electricity mix would understand how to adapt to uncertainty and variability in operations while sustaining grid stability.Due to hydropower’s adaptability,a system using hydropower as one of its generating resources could be precisely adapted to absorb the variability of wind and solar energy.The objective of this research study is to create a hybrid system comprising hydro-wind and solar(Hybrid-HWS)integration for power balancing in an isolated electrical network in Klipkop village,Pretoria region,South Africa.The desirability of designing and building goaf storage tank in regard to capability,the fullness of line throughoutwater pumping,dispensing,storage tank spillage,and pressure difference throughout liquid flow within the storage tanks were preliminary assessed using geotechnical and weather forecasting data from a distinctive area of Klipkop town in Pretoria,South Africa.Different facility hours premised on daylight accessibility are scheduled to balance maximum load at early and late hours.However,in the scenario of electrical power,time shift requiring storage for extended periods of time,such as in terms of hours,Hybrid-HWS has been found to have a crucial role.The results of simulations showed a coordinated process design for Hybrid-HWS Energy Storage(ES)to determine everyday strategic planning in reducing the variability of the system resulting from wind-solar-pumped hydro ES output inadequacies and satisfy daily load demands.It could be recommended that by considering the adaptability characteristics,extremely rapidly,ramping,peaking support and maximum stabilizing aid of the system could be archived with pump-hydro into the energy mix which can provide specific guidelines for energy policymakers. 展开更多
关键词 Pumped hydro storage(PHS) hybrid hydro-wind-solar technique abandoned coal mine power balancing
下载PDF
Research on the longitudinal protection of a through-type cophase traction direct power supply system based on the empirical wavelet transform
2
作者 Lu Li Zeduan Zhang +5 位作者 Wang Cai Qikang Zhuang Guihong Bi Jian Deng Shilong Chen Xiaorui Kan 《Global Energy Interconnection》 EI CSCD 2024年第2期206-216,共11页
This paper proposes a longitudinal protection scheme utilizing empirical wavelet transform(EWT)for a through-type cophase traction direct power supply system,where both sides of a traction network line exhibit a disti... This paper proposes a longitudinal protection scheme utilizing empirical wavelet transform(EWT)for a through-type cophase traction direct power supply system,where both sides of a traction network line exhibit a distinctive boundary structure.This approach capitalizes on the boundary’s capacity to attenuate the high-frequency component of fault signals,resulting in a variation in the high-frequency transient energy ratio when faults occur inside or outside the line.During internal line faults,the high-frequency transient energy at the checkpoints located at both ends surpasses that of its neighboring lines.Conversely,for faults external to the line,the energy is lower compared to adjacent lines.EWT is employed to decompose the collected fault current signals,allowing access to the high-frequency transient energy.The longitudinal protection for the traction network line is established based on disparities between both ends of the traction network line and the high-frequency transient energy on either side of the boundary.Moreover,simulation verification through experimental results demonstrates the effectiveness of the proposed protection scheme across various initial fault angles,distances to faults,and fault transition resistances. 展开更多
关键词 Through-type Cophase traction direct power supply system Traction network Empirical wavelet transform(EWT) Longitudinal protection
下载PDF
Transient Stability Preventive Control of Wind Farm Connected Power System Considering the Uncertainty
3
作者 Yuping Bian Xiu Wan Xiaoyu Zhou 《Energy Engineering》 EI 2024年第6期1637-1656,共20页
To address uncertainty as well as transient stability constraints simultaneously in the preventive control of windfarm systems, a novel three-stage optimization strategy is established in this paper. In the first stag... To address uncertainty as well as transient stability constraints simultaneously in the preventive control of windfarm systems, a novel three-stage optimization strategy is established in this paper. In the first stage, the probabilisticmulti-objective particle swarm optimization based on the point estimate method is employed to cope with thestochastic factors. The transient security region of the system is accurately ensured by the interior point methodin the second stage. Finally, the verification of the final optimal objectives and satisfied constraints are enforcedin the last stage. Furthermore, the proposed strategy is a general framework that can combine other optimizationalgorithms. The proposed methodology is tested on the modified WSCC 9-bus system and the New England 39-bussystem. The results verify the feasibility of the method. 展开更多
关键词 Transient preventive control chance-constrained programming multi-objective PSO TSCOPF wind farm
下载PDF
A Wind Power Prediction Framework for Distributed Power Grids
4
作者 Bin Chen Ziyang Li +2 位作者 Shipeng Li Qingzhou Zhao Xingdou Liu 《Energy Engineering》 EI 2024年第5期1291-1307,共17页
To reduce carbon emissions,clean energy is being integrated into the power system.Wind power is connected to the grid in a distributed form,but its high variability poses a challenge to grid stability.This article com... To reduce carbon emissions,clean energy is being integrated into the power system.Wind power is connected to the grid in a distributed form,but its high variability poses a challenge to grid stability.This article combines wind turbine monitoring data with numerical weather prediction(NWP)data to create a suitable wind power prediction framework for distributed grids.First,high-precision NWP of the turbine range is achieved using weather research and forecasting models(WRF),and Kriging interpolation locates predicted meteorological data at the turbine site.Then,a preliminary predicted power series is obtained based on the fan’s wind speed-power conversion curve,and historical power is reconstructed using variational mode decomposition(VMD)filtering to form input variables in chronological order.Finally,input variables of a single turbine enter the temporal convolutional network(TCN)to complete initial feature extraction,and then integrate the outputs of all TCN layers using Long Short Term Memory Networks(LSTM)to obtain power prediction sequences for all turbine positions.The proposed method was tested on a wind farm connected to a distributed power grid,and the results showed it to be superior to existing typical methods. 展开更多
关键词 Wind power prediction distributed power grid WRF mode deep learning variational mode decomposition
下载PDF
Development of High Torque and High Power Density Hybrid Excitation Flux Switching Motor for Traction Drive in Hybrid Electric Vehicles
5
作者 Erwan Sulaiman Takashi Kosaka 《Energy and Power Engineering》 2013年第7期446-454,共9页
This paper presents design feasibility study and development of a new hybrid excitation flux switching motor (HEFSM) as a contender for traction drives in hybrid electric vehicles (HEVs). Initially, the motor general ... This paper presents design feasibility study and development of a new hybrid excitation flux switching motor (HEFSM) as a contender for traction drives in hybrid electric vehicles (HEVs). Initially, the motor general construction, the basic working principle and the design concept of the proposed HEFSM are outlined. Then, the initial drive performances of the proposed HEFSM are evaluated based on 2D-FEA, in which the design restrictions, specifications and target performances are similar with conventional interior permanent magnet synchronous motor (IPMSM) used in HEV. Since the initial results fail to achieve the target performances, deterministic design optimization approach is used to treat several design parameters. After several cycles of optimization, the proposed motor makes it possible to obtain the target torque and power of 333 Nm and 123 kW, respectively. In addition, due to definite advantage of robust rotor structure of HEFSM, rotor mechanical stress prediction at maximum speed of 12,400 r/min is much lower than the mechanical stress in conventional IPMSM. Finally, the maximum torque and power density of the final design HEFSM are approximately 11.41 Nm/kg and 5.55 kW/kg, respectively, which is 19.98% and 58.12% more than the torque and power density in existing IPMSM for Lexus RX400h. 展开更多
关键词 HYBRID EXCITATION FLUX SWITCHING Machine (HEFSM) Field EXCITATION Coil (FEC) Permanent MAGNET (PM) HYBRID Electric Vehicle (HEV)
下载PDF
Medium Term Load Forecasting for Jordan Electric Power System Using Particle Swarm Optimization Algorithm Based on Least Square Regression Methods
6
作者 Mohammed Hattab Mohammed Ma’itah +2 位作者 Tha’er Sweidan Mohammed Rifai Mohammad Momani 《Journal of Power and Energy Engineering》 2017年第2期75-96,共22页
This paper presents a technique for Medium Term Load Forecasting (MTLF) using Particle Swarm Optimization (PSO) algorithm based on Least Squares Regression Methods to forecast the electric loads of the Jordanian grid ... This paper presents a technique for Medium Term Load Forecasting (MTLF) using Particle Swarm Optimization (PSO) algorithm based on Least Squares Regression Methods to forecast the electric loads of the Jordanian grid for year of 2015. Linear, quadratic and exponential forecast models have been examined to perform this study and compared with the Auto Regressive (AR) model. MTLF models were influenced by the weather which should be considered when predicting the future peak load demand in terms of months and weeks. The main contribution for this paper is the conduction of MTLF study for Jordan on weekly and monthly basis using real data obtained from National Electric Power Company NEPCO. This study is aimed to develop practical models and algorithm techniques for MTLF to be used by the operators of Jordan power grid. The results are compared with the actual peak load data to attain minimum percentage error. The value of the forecasted weekly and monthly peak loads obtained from these models is examined using Least Square Error (LSE). Actual reported data from NEPCO are used to analyze the performance of the proposed approach and the results are reported and compared with the results obtained from PSO algorithm and AR model. 展开更多
关键词 MEDIUM TERM Load Forecasting Particle SWARM Optimization Least SQUARE Regression Methods
下载PDF
Power Quality Issues Concerning Photovoltaic Generation and Electrical Vehicle Loads in Distribution Grids
7
作者 Jaan Niitsoo Paul Taklaja +1 位作者 Ivo Palu Joni Klüss 《Smart Grid and Renewable Energy》 2015年第6期164-177,共14页
The high utilization level of renewable generation including residential photovoltaic (PV) systems together with the uncontrolled charging of electric vehicles (EVs) can have a significant impact on load characteristi... The high utilization level of renewable generation including residential photovoltaic (PV) systems together with the uncontrolled charging of electric vehicles (EVs) can have a significant impact on load characteristics in distribution networks. Harmonic content of PV generation, EV charging loads, and their influence on power quality indicators in residential distribution networks are discussed in this paper. For investigating likely power quality scenarios, PV generation and EV charging measurement results including current harmonic amplitude and phase angle values are used and compared with present load characteristics. Different modelling scenarios are analysed and a simplified model of harmonics in PVs and EVs is offered. The results of the study show moderate additional harmonic distortion in residential load current and voltage distortion at the substation’s busbar when PV generation and EV loading are added. The scenarios presented in this paper can be further used for modelling the actual harmonic loads of the PVs and EVs in distribution networks. 展开更多
关键词 Current Measurement Distributed Generation Electric VEHICLES LOAD Modelling Photo Voltaic POWER Quality POWER System HARMONICS
下载PDF
Operation Control Method of Relay Protection in Flexible DC Distribution Network Compatible with Distributed Power Supply
8
作者 Zihan Qi 《Energy Engineering》 EI 2023年第11期2547-2563,共17页
A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to... A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency. 展开更多
关键词 Compatible distributed power supply FLEXIBILITY DC distribution network relay protection operation control
下载PDF
Parallel Integrated Model-Driven and Data-Driven Online Transient Stability Assessment Method for Power System
9
作者 Ying Zhang Xiaoqing Han +3 位作者 Chao Zhang Ying Qu Yang Liu Gengwu Zhang 《Energy Engineering》 EI 2023年第11期2585-2609,共25页
More and more uncertain factors in power systems and more and more complex operation modes of power systems put forward higher requirements for online transient stability assessment methods.The traditional modeldriven... More and more uncertain factors in power systems and more and more complex operation modes of power systems put forward higher requirements for online transient stability assessment methods.The traditional modeldriven methods have clear physical mechanisms and reliable evaluation results but the calculation process is time-consuming,while the data-driven methods have the strong fitting ability and fast calculation speed but the evaluation results lack interpretation.Therefore,it is a future development trend of transient stability assessment methods to combine these two kinds of methods.In this paper,the rate of change of the kinetic energy method is used to calculate the transient stability in the model-driven stage,and the support vector machine and extreme learning machine with different internal principles are respectively used to predict the transient stability in the data-driven stage.In order to quantify the credibility level of the data-driven methods,the credibility index of the output results is proposed.Then the switching function controlling whether the rate of change of the kinetic energy method is activated or not is established based on this index.Thus,a newparallel integratedmodel-driven and datadriven online transient stability assessment method is proposed.The accuracy,efficiency,and adaptability of the proposed method are verified by numerical examples. 展开更多
关键词 Rate of change of kinetic energy support vectormachine extreme learning machine credibility index model-data parallel integration
下载PDF
Research of Electric Cable Path Planning Based on Heuristic Optimization Algorithm in Mixed-Land Scenario
10
作者 Tianfeng Xu Tao Wang +4 位作者 Chengming Ye Jing Zhang Peng Xi Yunhui Chen Gengwu Zhang 《Energy Engineering》 EI 2023年第11期2629-2650,共22页
In order to improve the reliability of power supply,the sophisticated design of the structure of electric cable network has become an important issue for modern urban distribution networks.In this paper,an electric ca... In order to improve the reliability of power supply,the sophisticated design of the structure of electric cable network has become an important issue for modern urban distribution networks.In this paper,an electric cable path planning model based on heuristic optimization algorithm considering mixed-land scenario is proposed.Firstly,based on different land samples,the kernel density estimation(KDE)and the analytic hierarchy process(AHP)are used to estimate the construction cost of each unit grid,in order to construct the objective function of comprehensive investment for electric cable loop network.Then,the ant colony optimization(ACO)was improved in pheromone concentration,factor increment and search direction to accelerate the solving speed,and the cable path planning result with minimum construction cost is obtained.Finally,the feeder’s tie line of the cable loop network is planned by the genetic algorithm(GA)to achieve the minimum operating cost.In the case analysis,compared with the traditional method,not only the subjective factors in the process of investment estimation can be avoided,but also the speed of model solving and the quality of the optimal solution are improved. 展开更多
关键词 Cable loop network path planning mixed-land KDE improved ACO GA
下载PDF
Assessment on Fault Diagnosis and State Evaluation of New Power Grid:AReview
11
作者 Bo Yang Yulin Li +3 位作者 Yaxing Ren Yixuan Chen Xiaoshun Zhang Jingbo Wang 《Energy Engineering》 EI 2023年第6期1287-1293,共7页
1 Introduction The proposal of the concept of“New Power System”aims to illustrate the transform direction of the traditional power system,acting as the development core of the future new power grid.To achieve this,t... 1 Introduction The proposal of the concept of“New Power System”aims to illustrate the transform direction of the traditional power system,acting as the development core of the future new power grid.To achieve this,the proposed strategic targets of“carbon neutralization and carbon peaking”must be implemented and insisted[1].The core feature of the new power system is that renewable energy plays a leading role and becomes the main source of energy supply,meanwhile,the goal of green energy utilization has also been put forward on the agenda.Green energy utilization includes two aspects,one is the exploitation and promotion of various green energy technologies,and the other is the digitalization of energy management.Under this trend,stochastic and fluctuating energy sources such as wind power and photovoltaic power replace deterministic controllable power sources such as thermal power,bringing challenges to power grid regulation and dispatching,as well as flexible operation.The large-scale integration of renewable energy and increasingly high proportion of power electronic equipment tend to bring about fundamental changes in the operation characteristics,safety control,and production mode of the power system. 展开更多
关键词 Carbon neutrality and carbon peak goals renewable energy fault diagnosis state evaluation new power grid
下载PDF
跟网型和构网型逆变器的阻抗无源化方法综述
12
作者 杜夏恒 赫玉莹 +4 位作者 邹文 张犁 MANSOUR D A SHARAF H M ZOBAA A M 《东北电力大学学报》 2024年第2期12-20,共9页
相比传统同步机主导的电力系统,由并网逆变器所主导的新能源并网发电系统动态特性发生了根本性变化。近年,国内外报道了多次新能源并网发电系统振荡事件,振荡现象具有宽频域特征,动态行为具有非线性、时变性和复杂性。并网逆变器的端口... 相比传统同步机主导的电力系统,由并网逆变器所主导的新能源并网发电系统动态特性发生了根本性变化。近年,国内外报道了多次新能源并网发电系统振荡事件,振荡现象具有宽频域特征,动态行为具有非线性、时变性和复杂性。并网逆变器的端口阻抗无源性是保证并网发电系统稳定的充分条件,适用于复杂电网下的稳定性优化。文中针对跟网型和构网型逆变器,分别从控制器优化设计、串并联虚拟阻抗和其他无源化方法这三个方面,对两类逆变器的中高频阻抗无源化改善方法进行了总结和梳理,最后探讨了当前研究的不足与现存的挑战。 展开更多
关键词 跟网型逆变器 构网型逆变器 阻抗重塑 无源化 稳定性
下载PDF
Double-ring high-frequency common-mode switching oscillation current sensor for inverter-fed machine winding insulation monitoring
13
作者 Lingqing Pan Xizhou Du +3 位作者 Xing Lei Ting Ye Dawei Xiang Hao Li 《Global Energy Interconnection》 EI CSCD 2024年第1期106-116,共11页
Insulation failure significantly contributes to the unpredictable shutdown of power equipment.Compared to the partial discharge and high-frequency(HF)injection methods,the HF common-mode(CM)leakage current method offe... Insulation failure significantly contributes to the unpredictable shutdown of power equipment.Compared to the partial discharge and high-frequency(HF)injection methods,the HF common-mode(CM)leakage current method offers a non-intrusive and highly sensitive alternative.However,the detection of HF CM currents is susceptible to interference from differential-mode(DM)currents,which exhibit high-amplitude and multifrequency components during normal operation.To address this challenge,this paper proposes a double-ring current sensor based on the principle of magnetic shielding for inverter-fed machine winding insulation monitoring.The inner ring harnesses the magnetic aggregation effect to isolate the DM current magnetic field,whereas the outer ring serves as the magnetic core of the Rogowski current sensor,enabling HF CM current monitoring.First,the magnetic field distributions of the CM and DM currents were analyzed.Then,a correlation between the sensor parameters and signal-to-noise ratio of the target HF CM current was established.Finally,an experimental study was conducted on a 3-kW PMSM for verification.The results indicate that the proposed double-ring HF CM sensor can effectively mitigate DM current interference.Compared to a single-ring sensor,a reduction of approximately 40%in the DM component was achieved,which significantly enhanced the precision of online insulation monitoring. 展开更多
关键词 Magnetic shielding Double-ring Common-mode current Maxwell simulation
下载PDF
High-sensitive state perception method for inverter-fed machine turn insulation based on FrFT-Mel
14
作者 Ruitian Fan Xing Lei +3 位作者 Tao Jia Menglong Qin Hao Li Dawei Xiang 《Global Energy Interconnection》 EI CSCD 2024年第2期155-165,共11页
Amidst the swift advancement of new power systems and electric vehicles,inverter-fed machines have progressively materialized as a pivotal apparatus for efficient energy conversion.Stator winding turn insulation failu... Amidst the swift advancement of new power systems and electric vehicles,inverter-fed machines have progressively materialized as a pivotal apparatus for efficient energy conversion.Stator winding turn insulation failure is the root cause of inverter-fed machine breakdown.The online monitoring of turn insulation health can detect potential safety risks promptly,but faces the challenge of weak characteristics of turn insulation degradation.This study proposes an innovative method to evaluate the turn insulation state of inverter-fed machines by utilizing the fractional Fourier transform with a Mel filter(FrFT-Mel).First,the sensitivity of the high-frequency(HF)switching oscillation current to variations in turn insulation was analyzed within the fractional domain.Subsequently,an improved Mel filter is introduced,and its structure and parameters are specifically designed based on the features intrinsic to the common-mode impedance resonance point of the electrical machine.Finally,an evaluation index was proposed for the turn insulation state of inverter-fed machines.Experimental results on a 3kW permanent magnet synchronous machine(PMSM)demonstrate that the proposed FrFT-Mel method significantly enhances the sensitivity of turn insulation state perception by approximately five times,compared to the traditional Fourier transform method. 展开更多
关键词 State perception Turn insulation Switching oscillation Fractional Fourier transform Mel filter
下载PDF
Modification of streamer-to-leader transition model based on radial thermal expansion in the sphere-plane gap discharge at high altitude
15
作者 耿江海 林果 +3 位作者 王平 丁玉剑 丁杨 俞华 《Plasma Science and Technology》 SCIE EI CAS CSCD 2024年第1期42-49,共8页
Historically,streamer-to-leader transition studies mainly focused on the rod-plane gap and low altitude analysis,with limited attention paid to the sphere-plane gap at high altitude analysis.In this work,sphere-plane ... Historically,streamer-to-leader transition studies mainly focused on the rod-plane gap and low altitude analysis,with limited attention paid to the sphere-plane gap at high altitude analysis.In this work,sphere-plane gap discharge tests were carried out under the gap distance of 5 m at the Qinghai Ultra High Voltage(UHV)test base at an altitude of 2200 m.The experiments measured the physical parameters such as the discharge current,electric field intensity and instantaneous optical power.The duration of the dark period and the critical charge of streamer-toleader transition were obtained at high altitude.Based on radial thermal expansion of the streamer stem,we established a modified streamer-to-leader transition model of the sphere-plane gap discharge at high altitude,and calculated the stem temperature,stem radii and the duration of streamer-to-leader transition.Compared with the measured duration of sphere-plane electrode discharge at an altitude of 2200 m,the error rate of the modified model was 0.94%,while the classical model was 6.97%,demonstrating the effectiveness of the modified model.From the comparisons and analysis,several suggestions are proposed to improve the numerical model for further quantitative investigations of the leader inception. 展开更多
关键词 streamer-to-leader transition model high altitude streamer stem convective diffusion radial thermal expansion
下载PDF
Research on Demand Response Potential of Adjustable Loads in Demand Response Scenarios
16
作者 Zhishuo Zhang Xinhui Du +3 位作者 Yaoke Shang Jingshu Zhang Wei Zhao Jia Su 《Energy Engineering》 EI 2024年第6期1577-1605,共29页
To address the issues of limited demand response data,low generalization of demand response potential evaluation,and poor demand response effect,the article proposes a demand response potential feature extraction and ... To address the issues of limited demand response data,low generalization of demand response potential evaluation,and poor demand response effect,the article proposes a demand response potential feature extraction and prediction model based on data mining and a demand response potential assessment model for adjustable loads in demand response scenarios based on subjective and objective weight analysis.Firstly,based on the demand response process and demand response behavior,obtain demand response characteristics that characterize the process and behavior.Secondly,establish a feature extraction and prediction model based on data mining,including similar day clustering,time series decomposition,redundancy processing,and data prediction.The predicted values of each demand response feature on the response day are obtained.Thirdly,the predicted data of various characteristics on the response day are used as demand response potential evaluation indicators to represent different demand response scenarios and adjustable loads,and a demand response potential evaluation model based on subjective and objective weight allocation is established to calculate the demand response potential of different adjustable loads in different demand response scenarios.Finally,the effectiveness of the method proposed in the article is verified through examples,providing a reference for load aggregators to formulate demand response schemes. 展开更多
关键词 Demand response potential demand response scenarios data mining adjustable load evaluation system subjective and objective weight allocation
下载PDF
Observation of Arctic surface currents using data from a surface drifting buoy
17
作者 Hongxia Chen Lina Lin +7 位作者 Long Fan Wangxiao Yang Yinke Dou Bingrui Li Yan He Bin Kong Guangyu Zuo Na Liu 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2024年第1期70-79,共10页
During the 10th Chinese Arctic scientific expedition carried out in the summer of 2019,the surface current in the high-latitude areas of the Arctic Ocean was observed using a self-developed surface drifting buoy,which... During the 10th Chinese Arctic scientific expedition carried out in the summer of 2019,the surface current in the high-latitude areas of the Arctic Ocean was observed using a self-developed surface drifting buoy,which was initially deployed in the Chukchi Sea.The buoy traversed the Chukchi Sea,Chukchi Abyssal Plain,Mendeleev Ridge,Makarov Basin,and Canada Basin over a period of 632 d.After returning to the Mendeleev Ridge,it continued to drift toward the pole.Overall,the track of the buoy reflected the characteristics of the transpolar drift and Chukchi Slope Current,as well as the inertial flow,cross-ridge surface flow,and even the surface disorganized flow for some time intervals.The results showed that:(1)the transpolar drift mainly occurs in the Chukchi Abyssal Plain,Mendeleev Ridge,and western Canada Basin to the east of the ridge where sea ice concentration is high,and the average northward flow velocity in the region between 79.41°N and 86.32°N was 5.1 cm/s;(2)the average surface velocity of the Chukchi Slope Current was 13.5 cm/s,and while this current moves westward along the continental slope,it also extends northwestward across the continental slope and flows to the deep sea;and(3)when sea ice concentration was less than 50%,the inertial flow was more significant(the maximum observed inertial flow was 26 cm/s,and the radius of the inertia circle was 3.6 km). 展开更多
关键词 Chinese National Arctic Research Expedition(CHINARE) surface drifting buoy transpolar drift Chukchi Slope Current inertial flow
下载PDF
Model Predictive Control for Cascaded H-Bridge PV Inverter with Capacitor Voltage Balance
18
作者 Xinwei Wei Wanyu Tao +4 位作者 Xunbo Fu Xiufeng Hua Zhi Zhang Xiaodan Zhao Chen Qin 《Journal of Electronic Research and Application》 2024年第2期79-85,共7页
We designed an improved direct-current capacitor voltage balancing control model predictive control(MPC)for single-phase cascaded H-bridge multilevel photovoltaic(PV)inverters.Compared with conventional voltage balanc... We designed an improved direct-current capacitor voltage balancing control model predictive control(MPC)for single-phase cascaded H-bridge multilevel photovoltaic(PV)inverters.Compared with conventional voltage balanc-ing control methods,the method proposed could make the PV strings of each submodule operate at their maximum power point by independent capacitor voltage control.Besides,the predicted and reference value of the grid-connected current was obtained according to the maximum power output of the maximum power point tracking.A cost function was con-structed to achieve the high-precision grid-connected control of the CHB inverter.Finally,the effectiveness of the proposed control method was verified through a semi-physical simulation platform with three submodules. 展开更多
关键词 Model predictive control(MPC) Photovoltaic system Cascaded H-bridge(CHB)inverter Capacitor voltage balance
下载PDF
Abandoned coal mine tunnels: Future heating/power supply centers 被引量:4
19
作者 Luo Pingjia Chen Ning 《Mining Science and Technology》 EI CAS 2011年第5期637-640,共4页
We have studied three plans for re-use of the abandoned mine roadway tunnels as an energy center. These are the thermostat plan, the thermal accumulator plan, and the CAES plan. Calculations show that the thermostat p... We have studied three plans for re-use of the abandoned mine roadway tunnels as an energy center. These are the thermostat plan, the thermal accumulator plan, and the CAES plan. Calculations show that the thermostat plan can provide over 15,000 m2 of building air-conditioning/heating load for each kilo- meter of roadway, but electric power is needed to run the system. Numerical research proved that the accumulation of hot water in the roadway for seasonal heating purposes (a temperature swing from 90 to 54 °C) is a viable possibility. The CAES plan proposes using the discarded coal mine tunnel as a peak- ing power station with an energy storage density over 7000 kJ/m3. It can be concluded that presently abandoned coal mines could be reformed into future energy centers for a city. 展开更多
关键词 煤矿巷道 加热 隧道 电源 矿井巷道 能源中心 CAES 计算结果
下载PDF
CFD-Based Optimization of Hot Primary-Air Pipe Networks in Power Plant Milling Systems 被引量:4
20
作者 Qingyun Yan You Li +4 位作者 Yuanhong Zhu Kui Cheng Xueli Huang Cong Qi Xuemin Ye 《Fluid Dynamics & Materials Processing》 EI 2020年第3期623-636,共14页
A hot primary-air pipe system is the bridge connecting an air-preheater with a coal mill in power generation stations.The effective geometrical configuration of the pipe network greatly affects the air flow distributi... A hot primary-air pipe system is the bridge connecting an air-preheater with a coal mill in power generation stations.The effective geometrical configuration of the pipe network greatly affects the air flow distribution and consequently influences the safe and economic operation of milling systems in power stations.In order to improve the properties of the air flow,in the present work the SIMPLEC method is used to simulate numerically the flow field for the original layout of the system.As a result,the internal mechanisms influencing the uneven pressure drop in each branch are explored and three optimization schemes are proposed accordingly.The numerical results indicate that,for the original layout,the local pressure drop of the tee section accounts for approximately 74%of the total drop of the system,with other pressure drops depending on the specific branch considered.It is shown that after optimization,a roughly balanced flow resistance and flow rate can be obtained.Compared with the original layout,the pressure drop relating to different branches is significantly reduced. 展开更多
关键词 Hot primary-air pipe flow dynamics layout optimization numerical simulation
下载PDF
上一页 1 2 16 下一页 到第
使用帮助 返回顶部