Most of Brazilian railways were built more than 100 years ago. Some of them were submitted to rebuilding processes while others were just overloaded by additional layers of ballast. Nowadays, Brazil is going through a...Most of Brazilian railways were built more than 100 years ago. Some of them were submitted to rebuilding processes while others were just overloaded by additional layers of ballast. Nowadays, Brazil is going through a new railway transport impulse in relation to the increase of load, despite of the necessary supply capacity. For this reason, there were developed evaluations from some Brazilian railways in order to determine their operational conditions. This work shows a comparative analysis of results from two parts of studied old railway, aiming to determine minimum features to enable them to accept higher load axis. One of these studied old railway parts did not have a sub-ballast layer in contrast to the other one. The strains and stresses of these old railway track parts were generated by the same locomotive.展开更多
文摘Most of Brazilian railways were built more than 100 years ago. Some of them were submitted to rebuilding processes while others were just overloaded by additional layers of ballast. Nowadays, Brazil is going through a new railway transport impulse in relation to the increase of load, despite of the necessary supply capacity. For this reason, there were developed evaluations from some Brazilian railways in order to determine their operational conditions. This work shows a comparative analysis of results from two parts of studied old railway, aiming to determine minimum features to enable them to accept higher load axis. One of these studied old railway parts did not have a sub-ballast layer in contrast to the other one. The strains and stresses of these old railway track parts were generated by the same locomotive.