期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Knowledge Discovery in Data: A Case Study
1
作者 Ahmed Hammad Simaan AbouRizk 《Journal of Computer and Communications》 2014年第5期1-28,共28页
It is common in industrial construction projects for data to be collected and discarded without being analyzed to extract useful knowledge. A proposed integrated methodology based on a five-step Knowledge Discovery in... It is common in industrial construction projects for data to be collected and discarded without being analyzed to extract useful knowledge. A proposed integrated methodology based on a five-step Knowledge Discovery in Data (KDD) model was developed to address this issue. The framework transfers existing multidimensional historical data from completed projects into useful knowledge for future projects. The model starts by understanding the problem domain, industrial construction projects. The second step is analyzing the problem data and its multiple dimensions. The target dataset is the labour resources data generated while managing industrial construction projects. The next step is developing the data collection model and prototype data ware-house. The data warehouse stores collected data in a ready-for-mining format and produces dynamic On Line Analytical Processing (OLAP) reports and graphs. Data was collected from a large western-Canadian structural steel fabricator to prove the applicability of the developed methodology. The proposed framework was applied to three different case studies to validate the applicability of the developed framework to real projects data. 展开更多
关键词 CONSTRUCTION MANAGEMENT Project MANAGEMENT KNOWLEDGE MANAGEMENT DATA Warehousing DATA Mining KNOWLEDGE Discovery in DATA (KDD) Industrial CONSTRUCTION Labour RESOURCES
下载PDF
An Intelligent Agent Approach to Adaptive Project Management 被引量:1
2
作者 I. Ourdev S. AbouRizk 《Tsinghua Science and Technology》 SCIE EI CAS 2008年第S1期121-125,共5页
This paper presents the initial steps to integrating a distributed discrete event simulation system with a framework for intelligent software agents. The resulting system has a simulation component that is based on th... This paper presents the initial steps to integrating a distributed discrete event simulation system with a framework for intelligent software agents. The resulting system has a simulation component that is based on the high-level architecture (HLA) and an agent component that implements the belief-desire-intention (BDI) approach to agent modelling. The architecture is connected to a real-time information source. The framework was successfully applied to a real-life monitoring system for a tunnel-boring machine excavation project that helped with forecasting and managing the project timelines in response to the changes in the uncertain excavation environment. This project is presented as a test case and demonstrates encouraging results for integrative modelling of large-scale problems with elements of uncertainty. 展开更多
关键词 intelligent agents adaptive project management belief-desire-intention (BDI) high-level architecture (HLA) excavation project discrete event simulation Bayesian modelling uncertainty
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部