期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Study on Influencing Factors and Control Points of Design Estimate of Landscaping Engineering
1
作者 Dan Zhang Meng Wu +1 位作者 Jiashuo Zhao Jie Di 《Journal of Architectural Research and Development》 2024年第5期13-19,共7页
In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and th... In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and the support of macro policies,people’s demand for close to nature and beautify the environment is gradually increasing,which has brought new growth momentum for the development of the landscaping industry.Simultaneously,from the perspective of future economic development and urban development,the landscaping industry still has a lot of room for development.However,with the rapid development of landscape engineering,the problem of cost control of landscape engineering is becoming more prominent,the phenomenon of budget overestimation is common,and there are many factors affecting the cost of landscape engineering,which brings difficulties and challenges to the analysis of its influencing factors and cost management.How to scientifically analyze the influencing factors and control the cost has become an important link in the landscaping project.To solve the above problems,this paper takes the design stage of landscaping engineering as the background,takes the design estimate of landscaping engineering as the research object,through literature research and data collection,fully excavates the main influencing factors of the design estimate stage of landscaping engineering,analyzes the key points of cost control,and provides reference ideas and directions for the later cost management and control. 展开更多
关键词 Landscape engineering Design estimate Main influencing factors Cost control
下载PDF
Screening of marine fungus from Nanji Island and activity of their metabolites against pathogenic Vibrio from Pseudosciaena crocea 被引量:1
2
作者 赵淑江 李书平 +3 位作者 刘辉辉 赵倩 王杰优 闫茂仓 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2012年第5期746-756,共11页
Seventy-eight marine fungal strains were isolated from sediment samples collected off the coast of Nanji Island, Wenzhou, Zhejiang Province, China. Antibacterial screening using the agar disc method showed that 19 of ... Seventy-eight marine fungal strains were isolated from sediment samples collected off the coast of Nanji Island, Wenzhou, Zhejiang Province, China. Antibacterial screening using the agar disc method showed that 19 of the isolated strains could inhibit at least one pathogenic Vibrio from Pseudosciaena crocea. Subsequent screening confirmed that nine strains produced antibacterial metabolites that had activity against one or several types of pathogenic Vibrio. Strain NJ0104 had the widest antimicrobial spectrum and strong activity, particularly against Fibrio parahaemolyticus-MM0810072. A preliminary study of N J0104 antibacterial metabolites demonstrated that they had thermal stability up to 80℃, ultraviolet stability up to 40 min and pH stability between 4.0-7.0. In addition, the antibacterial metabolites were readily soluble in butanol. To identify the specific strain, the ITS-5.8S rDNA regions of NJ0104 were PCR amplified and sequenced. Based on the combination of phenotypic and genotypic data, the strain was identified as Arthrinium sp. 展开更多
关键词 Nanji Island marine fungi ACTIVITY stability ITS-5.8S rDNA
下载PDF
Research on Intelligent Cost Estimation of Engineering Foundation Projects Based on CSIs Theory
3
作者 Jie Di Wenhao Xing +2 位作者 Meng Wu Dan Zhang Jiashuo Zhao 《Journal of World Architecture》 2024年第5期29-35,共7页
Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensio... Against the backdrop of rapid development in China’s construction and infrastructure sectors,discrepancies between project budgets and actual costs have become pronounced,manifesting in project overruns and suspensions,posing significant challenges.To address inaccuracies in investment targets and operational complexities,this study focuses on a beam-bridge construction project in a district of Shijiazhuang city as a case study.Drawing upon historical analogs,the project employs a Work Breakdown Structure(WBS)to decompose the engineering works.Building on theories of Cost Significant(CS)and Whole Life Costing(WLC),the study constructs Cost Significant Items(CSIs)and develops a CNN-BiLSTM-Attention neural network for nonlinear prediction.By identifying significant cost drivers in engineering projects,this paper presents a streamlined cost estimation method that significantly reduces computational burdens,simplifies data collection processes,and optimizes data analysis and forecasting,thereby enhancing prediction accuracy.Finally,validation with real-world cost fluctuation data demonstrates minor errors,meeting predictive requirements across project execution phases. 展开更多
关键词 Project management Cost Significant Items(CSIs) Engineering costing Intelligent estimation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部