期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
A Series Dissertation on Tianwan Nuclear Power Station——Site Conditions
1
作者 Li Qiankun 《工程科学(英文版)》 2006年第3期48-54,共7页
关键词 台湾省 核电站 位置条件 气象学 地质学
下载PDF
A Series Dissertation on Tianwan Nuclear Power Station——Summary of Tianwan Nuclear Power Station Project
2
作者 Li Qiankun 《工程科学(英文版)》 2006年第1期27-32,共6页
This is a summary in relation to the construction and operation of Tianwan Nuclear Power Station (the Project) at Lianyungang, Jiangsu Province, the People’s Republic of China. The breakdown specialty topic shall bee... This is a summary in relation to the construction and operation of Tianwan Nuclear Power Station (the Project) at Lianyungang, Jiangsu Province, the People’s Republic of China. The breakdown specialty topic shall been given in times to come. In this report, the author attempted to give some general description of the Project, including the Project site’s general layout and geographical conditions. A description of its exposure to the elements is also provided, supported by some data made available to us. The key component parts of the Project are described, namely, the nuclear island which includes the reactor, steam generator and so on; the conventional island and the balance of plant. Wherever possible, the improvements to the reactor design over the operating V320 are highlighted, which result in the V428 reactor model. The supplier and contractor for the major equipment such as the reactor and the turbine is the Russian company, namely Atomstroyexport (ASE). There are third country suppliers who provide other equipment. For instance, Siemens supplies the full digital I&C system and Framatome ANP supplies the emergency diesel generators; the metal-clad switchgear cabinet by ABB of Australia; the main steam isolation valve unit by CCI AG of Switzerland. All these foreign suppliers are well known globally. Their experience and quality of the equipment supplied by them are well recognized by the people in the respective fields. As for the civil work and erection work, the most experienced and trustworthy local contractors have been selected. These contractors have proven their competence in similar contract work before. For the testing of the equipment, stringent and proper procedures which meet international standards are adopted. Finally, the author wished on this report could provide the world a safety and advanced Nuclear Project building in China. 展开更多
关键词 江苏 连云港市 田湾核电站 核辐射安全 核计划
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部