期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Mechanisms of the formation of wind-blown sand hazards and the sand control measures in Gobi areas under extremely strong winds along the Lanzhou-Xinjiang high-speed railway
1
作者 Jianjun QU Tao WANG +5 位作者 Qinghe NIU Benli LIU Lihai TAN Qingjie HAN Yang GAO Jianhua XIAO 《Science China Earth Sciences》 SCIE EI CAS CSCD 2023年第2期292-302,共11页
The Lanzhou-Xinjiang high-speed railway(HSR)traverses areas of the Gobi Desert where extremely strong winds are frequent.These strong winds cause sand/gravel hazards,an unaddressed issue that often seriously compromis... The Lanzhou-Xinjiang high-speed railway(HSR)traverses areas of the Gobi Desert where extremely strong winds are frequent.These strong winds cause sand/gravel hazards,an unaddressed issue that often seriously compromises the safe operation of the HSR.This paper studies the mechanisms leading to wind-blown sand hazards and the outcomes of sand control projects in these areas.The main findings are as follows:(1)Cold northern airflows over the Tian Shan mountain range are accelerated by the wind tunnels and downslope effect as they pass over complex terrain comprising passes,gullies,and proluvial fans.Consequently,the wind intensity often increases two-to threefold,creating frequent high-speed winds that lead to severe sand damage along the HSR.(2)In the Gobi areas with extremely strong winds,sand grains can be lifted as high as 9 m from the ground into the air,far higher than in other areas of the desert.The sand transport rate decreases exponentially with increasing height.Both wind speed and particle size determine saltation height.Coarser particles and stronger winds provide the particles with a higher kinetic energy as they collide with the ground.In the wind zones of Baili and Yandun,the analysed study areas,the saltation layer height of wind-blown sand/gravel exceeds 3 and 2 m,respectively.(3)Based on the above findings,recently emerging sand control materials,suitable for the areas of interest,were screened and developed.Furthermore,under the proposed principle of‘supplementing blocking with trapping’,a comprehensive sand control measure was established,featuring sandblocking belts comprised of multiple rows,and high,vertical sand-trapping installations with a large grids size.The installed system showed a high efficacy,reducing sand transport rate by 87.87%and significantly decreasing the deposition of sand along a trial section of the HSR. 展开更多
关键词 Gobi areas with extremely strong winds Wind-blown sand hazards Complex terrain Sand/gravel flow Wind-blown sand control
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部