The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream a...The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.展开更多
Sutong Bridge is a cable-stayed steel box girder bridge with a main span of 1 088 m.The erection of upper structure adopts geometry control method and requires no change to the unit's size and the structure's ...Sutong Bridge is a cable-stayed steel box girder bridge with a main span of 1 088 m.The erection of upper structure adopts geometry control method and requires no change to the unit's size and the structure's none-stress geometry.Before main span closure,the cantilever of girder reaches 540.8 m,the structure state is noticeably influenced by external circumstances,the main span closure face great difficulty.By abstracting the advantage of the pullback method abroad and the domestic temperature-cutting method,a new assistant pullback method have put forward and bring into practice actually.In this paper,the analysis key point of practice conditions,key parameter of practice,main measures of the method and the performance is introduced.展开更多
Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span cl...Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced.展开更多
According to the chloride corrosion environment,service life prediction model of concrete structure of sea-crossing bridge was built using modified Fick's second law and the whole probability calculation method,wh...According to the chloride corrosion environment,service life prediction model of concrete structure of sea-crossing bridge was built using modified Fick's second law and the whole probability calculation method,which was suitable for China. Furthermore,a visual service life prediction program of concrete structure was developed by optimized Monte Carlo method. Meanwhile,Life 365 program was compared,indicating reliability of the prediction program. Finally,the validity of prediction model was verified in JinTang Bridge of Zhoushan Island Mainland Linkage Project.展开更多
This paper presents the Location,the structural design as well as the anti-corrosion and the pilot programs of the marine exposure station of Zhoushan Archipelago seas sea-crossing bridges. Subjected to the marine env...This paper presents the Location,the structural design as well as the anti-corrosion and the pilot programs of the marine exposure station of Zhoushan Archipelago seas sea-crossing bridges. Subjected to the marine environment,the concrete structures in serve with different mixing proportions,cover thickness,additional anti-corrosion measures such as rust-preventing agent,coating,penetration crystalline waterproof material,silicone and permeable fabric were studied. Those results obtained provide important information for the maintenance of marine concrete and the structural design of sea-crossing bridges in the above sea area.展开更多
To improve the quality of the steel-concrete composite segment of the box girder,to ensure the compactness of concrete to avoid debonding and to enhance the fatigue strength of concrete are critical to the concrete pr...To improve the quality of the steel-concrete composite segment of the box girder,to ensure the compactness of concrete to avoid debonding and to enhance the fatigue strength of concrete are critical to the concrete preparation for such site. Furthermore,the coordination ability to deformation between steel and concrete is also important because of great difference of the elastic modulus between them. Concrete for the steel-concrete composite segment with high fluidity,excellent crack resistance and low shrinkage was prepared by adding efficient poly-carboxylic water-reducing agent,high quality fly ash and expansion agent to it. The quality of the concrete of the half partial testing block showed that the optimal mix proportion of polypropylene fiber reinforced concrete had achieved expected effect,ensured high quality,thus meeting the requirements of construction.展开更多
The effects of steam curing on mechanical properties,drying shrinkage,cracking sensitivity,anti-permeability,and carbonation resistance of C50 shield segment concrete were investigated,which were compared with the sta...The effects of steam curing on mechanical properties,drying shrinkage,cracking sensitivity,anti-permeability,and carbonation resistance of C50 shield segment concrete were investigated,which were compared with the standard curing conditions. The results indicated that steam curing could increase early strength of concrete and reduce its drying shrinkage. However,steam curing reduced later strength of concrete,increased its crack sensitivity and deteriorated its anti-permeability and carbonation resistance. Moreover,the incorporation of fly ash could improve the durability of steam-cured concrete.展开更多
In this paper,C50 ultra-high-early-strength concrete was prepared with rapid-harden sulphoaluminate cement,alkali carbonate early strength agent,inorganic tribasic acid retarder and polycarboxylate water reducing agen...In this paper,C50 ultra-high-early-strength concrete was prepared with rapid-harden sulphoaluminate cement,alkali carbonate early strength agent,inorganic tribasic acid retarder and polycarboxylate water reducing agent. The properties testing results of C50 ultra-high-early-strength concrete indicated that the compressive strength at 12 h exceeded 37 MPa and at 3 d exceeded 59 MPa. Compared to the C50 ordinary reference concrete,the durability of C50 ultra-high-early strength concrete was investigated. The results indicated that C50 ultra-high-early-strength concrete had the same chloride ion permeability resistance,carbonization resistance and abrasion resistance to the C50 ordinary concrete. As to the sulfate resistance,the ultra-high-early-strength concrete was much better than the ordinary concrete.展开更多
The electrochemical performance of the anodes was measured in the reinforced concrete test block in artificial sea water. Their chemical composition,metallographic structure and surface morphology were analyzed. It wa...The electrochemical performance of the anodes was measured in the reinforced concrete test block in artificial sea water. Their chemical composition,metallographic structure and surface morphology were analyzed. It was found that concrete mix proportion and the covering layer thickness had an impact on the performance of sacrificial anodes. The thermal-sprayed zinc alloy anodes had a more negative corrosion potential and larger galvanic current than metallurgy ones in the same conditions. They had similar chemical composition. But metallographic structure showed that the structure of thermal-sprayed zinc alloy anodes was a loose porous. This structure had the catalytic effect on the andes electrochemical reactions and made the anodes the electrochemical exchange current density increase and the corrosion potential move to negative direction.展开更多
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)
文摘The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.
基金National Science and Technology Support Program of China(No.2006BAG04B03)
文摘Sutong Bridge is a cable-stayed steel box girder bridge with a main span of 1 088 m.The erection of upper structure adopts geometry control method and requires no change to the unit's size and the structure's none-stress geometry.Before main span closure,the cantilever of girder reaches 540.8 m,the structure state is noticeably influenced by external circumstances,the main span closure face great difficulty.By abstracting the advantage of the pullback method abroad and the domestic temperature-cutting method,a new assistant pullback method have put forward and bring into practice actually.In this paper,the analysis key point of practice conditions,key parameter of practice,main measures of the method and the performance is introduced.
基金National Science and Technology Support Program of China(No.2006BAG04B0)
文摘Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of domestic lifting cranes for this kind of lifting height and weight.Hence,a kind of lighter lifting device for the erection of back span large units was accepted for this bridge.In this paper,the design and use of this lifting device is introduced.The upper structure used lifting gantry to install the standard girder segment by cantilever method.Because the bridge's navigation clearance is high,and the girder segment is wide and heavy,the meteorology and hydrology condition of the bridge district is abominable,and the requirements of long cable girder side pull-in,structure and performance propose high request to the lifting gantry.In this paper,the design and use key point of long cable pull-in angle adjustment device integrate into lifting gantry is introduced.
文摘According to the chloride corrosion environment,service life prediction model of concrete structure of sea-crossing bridge was built using modified Fick's second law and the whole probability calculation method,which was suitable for China. Furthermore,a visual service life prediction program of concrete structure was developed by optimized Monte Carlo method. Meanwhile,Life 365 program was compared,indicating reliability of the prediction program. Finally,the validity of prediction model was verified in JinTang Bridge of Zhoushan Island Mainland Linkage Project.
文摘This paper presents the Location,the structural design as well as the anti-corrosion and the pilot programs of the marine exposure station of Zhoushan Archipelago seas sea-crossing bridges. Subjected to the marine environment,the concrete structures in serve with different mixing proportions,cover thickness,additional anti-corrosion measures such as rust-preventing agent,coating,penetration crystalline waterproof material,silicone and permeable fabric were studied. Those results obtained provide important information for the maintenance of marine concrete and the structural design of sea-crossing bridges in the above sea area.
文摘To improve the quality of the steel-concrete composite segment of the box girder,to ensure the compactness of concrete to avoid debonding and to enhance the fatigue strength of concrete are critical to the concrete preparation for such site. Furthermore,the coordination ability to deformation between steel and concrete is also important because of great difference of the elastic modulus between them. Concrete for the steel-concrete composite segment with high fluidity,excellent crack resistance and low shrinkage was prepared by adding efficient poly-carboxylic water-reducing agent,high quality fly ash and expansion agent to it. The quality of the concrete of the half partial testing block showed that the optimal mix proportion of polypropylene fiber reinforced concrete had achieved expected effect,ensured high quality,thus meeting the requirements of construction.
文摘The effects of steam curing on mechanical properties,drying shrinkage,cracking sensitivity,anti-permeability,and carbonation resistance of C50 shield segment concrete were investigated,which were compared with the standard curing conditions. The results indicated that steam curing could increase early strength of concrete and reduce its drying shrinkage. However,steam curing reduced later strength of concrete,increased its crack sensitivity and deteriorated its anti-permeability and carbonation resistance. Moreover,the incorporation of fly ash could improve the durability of steam-cured concrete.
基金the financial support from China Communications Construction Company Limited.
文摘In this paper,C50 ultra-high-early-strength concrete was prepared with rapid-harden sulphoaluminate cement,alkali carbonate early strength agent,inorganic tribasic acid retarder and polycarboxylate water reducing agent. The properties testing results of C50 ultra-high-early-strength concrete indicated that the compressive strength at 12 h exceeded 37 MPa and at 3 d exceeded 59 MPa. Compared to the C50 ordinary reference concrete,the durability of C50 ultra-high-early strength concrete was investigated. The results indicated that C50 ultra-high-early-strength concrete had the same chloride ion permeability resistance,carbonization resistance and abrasion resistance to the C50 ordinary concrete. As to the sulfate resistance,the ultra-high-early-strength concrete was much better than the ordinary concrete.
文摘The electrochemical performance of the anodes was measured in the reinforced concrete test block in artificial sea water. Their chemical composition,metallographic structure and surface morphology were analyzed. It was found that concrete mix proportion and the covering layer thickness had an impact on the performance of sacrificial anodes. The thermal-sprayed zinc alloy anodes had a more negative corrosion potential and larger galvanic current than metallurgy ones in the same conditions. They had similar chemical composition. But metallographic structure showed that the structure of thermal-sprayed zinc alloy anodes was a loose porous. This structure had the catalytic effect on the andes electrochemical reactions and made the anodes the electrochemical exchange current density increase and the corrosion potential move to negative direction.