期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Simulation of beam size multiknobs correction at the Accelerator Test Facility 2 at KEK
1
作者 白莎 B. Bolzon +1 位作者 P. Bambade 高杰 《Chinese Physics C》 SCIE CAS CSCD 2011年第4期397-401,共5页
The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose of reaching a 37 nm vertical beam size at the interaction point (IP). During the initial commissioni... The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose of reaching a 37 nm vertical beam size at the interaction point (IP). During the initial commissioning, we started with larger-than-nominal β-functions at the IP in order to reduce the effects from higher-order optical aberrations and thereby simplifying the optical corrections needed. We report on the simulation studies at two different IP locations developed based on waist scan, dispersion, coupling and β function multiknobs correction in the large β optics of ATF2, in the presence of two kinds of magnet inaccuracies (quadrupole gradient and roll errors) to generate all possible linear optic distortions at the IP. A vertical beam size which is very close to the nominal beam size is obtained based on the simulation study. 展开更多
关键词 ATF2 beam size multiknobs SIMULATION
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部