This paper presents a detailed design of a photovoltaic (PV) system for use in the rural electrification of remote settlements that are far off from the electricity grid. Since investment in building transmission line...This paper presents a detailed design of a photovoltaic (PV) system for use in the rural electrification of remote settlements that are far off from the electricity grid. Since investment in building transmission lines from the grid to these localities is not viable, a good solution is <span>an</span><span> installation in these areas of standalone photovoltaic systems. The design process comprises the choice and dimensioning of the solar panels, the battery storage, DC-AC inverter, and mini transmission grid to the different homes. The design is for a 15 kW PV system including an economic evaluation and analysis using Hybrid Optimization of Multiple Energy Resources (HOMER) software. Data on the average monthly solar radiation and temperature w</span><span>ere</span><span> obtained from various sources, including, Photovoltaic Geographical Information System (PVGIS) for Africa. From this data the study area receives a monthly average solar insolation of 6.16 kWh/</span><span>m</span><sup><span style="vertical-align:super;">2</span></sup><span>/day with the worst month </span><span>being </span><span>August with 5.22 kWh/</span><span>m</span><sup><span style="vertical-align:super;">2</span></sup><span>/day. The total daily electrical energy consumption is estimated to be about 72.525 kWh. Simulation results using HOMER software shows that the overall capital cost of the PV system components is $122,337, a replacement cost of $12,889 and an operation and maintenance cost of $29,946 over 10years. A financial analysis of the system showed that the design was both viable and sustainable with low maintenance cost</span><span>.</span>展开更多
S<span>everal challenges are associated </span></span><span style="font-family:"">with</span><span style="font-family:""> the development, adoption and...S<span>everal challenges are associated </span></span><span style="font-family:"">with</span><span style="font-family:""> the development, adoption and de</span><span style="font-family:"">ployment of biogas digesters in developing countries. Amongst these challenges is a comprehensive and systematic procedure for the design of digesters suitable for rural communities. This paper proposes the Flexible Biogas Digester System (FBDS) as a viable option for rural communities in developing countries and provide</span><span style="font-family:"">s</span><span style="font-family:""> a detailed step-by-step procedure for it</span><span style="font-family:"">s</span><span style="font-family:""> design. The biogas production process is a function of the digester operating factors which may be grouped into physical, process and performance parameters. The physical design parameters include</span><span style="font-family:""> </span><span style="font-family:"">the digester volume, the volume of the biogas storage tank, and the volume of the installation pit. The process parameters include total solid content of the slurry (TS), organic loading rate (OLR), digester operating temperatures, pH of the slurry inside the digester. The performance parameters include</span><span style="font-family:""> </span><span style="font-family:"">biogas production rate, biogas productivity and biogas quality. The Net Present Value and the Levelised Cost of Energy are presented for simple economic evaluation of the FBDS.展开更多
The current climate and energy crisis urgently needs solar cells with efficiencies above the 29% single junction efficiency bottleneck.Silicon/perovskite tandem solar cells are a solution,which is attracting much atte...The current climate and energy crisis urgently needs solar cells with efficiencies above the 29% single junction efficiency bottleneck.Silicon/perovskite tandem solar cells are a solution,which is attracting much attention.While silicon/perovskite tandem cells in 2-terminal and 4-terminal configurations are well documented,the three-terminal concept is still in its infancy.It has significant advantages under low light intensities as opposed to concentrated sunlight,which is the critical factor in designing tandem solar cells for low-cost terrestrial applications.This study pre-sents novel studies of the sub-cell performance of the first three-terminal perovskite/silicon selective band offset barrier tandem solar cells fabricated in an ongoing research project.This study focuses on short circuit current and operating voltages of the subcells under light intensities of one sun and below.Lifetime studies show that the perovskite bulk carrier lifetime is insensitive to illumination,while the silicon cell's lifetime decreases with decreasing light intensity.The combination of perovskite and silicon in the 3T perovskite-silicon tandem therefore reduces the sensitivity of V_(OC) to light intensity and maintains a relatively higher V_(OC) down to low light intensities,whereas silicon single-junction cells show a marked decrease.This technological advantage is proposed as a novel advantage of three-terminal perovkite/silicon solar cells for low light intensities of one sun or less.展开更多
文摘This paper presents a detailed design of a photovoltaic (PV) system for use in the rural electrification of remote settlements that are far off from the electricity grid. Since investment in building transmission lines from the grid to these localities is not viable, a good solution is <span>an</span><span> installation in these areas of standalone photovoltaic systems. The design process comprises the choice and dimensioning of the solar panels, the battery storage, DC-AC inverter, and mini transmission grid to the different homes. The design is for a 15 kW PV system including an economic evaluation and analysis using Hybrid Optimization of Multiple Energy Resources (HOMER) software. Data on the average monthly solar radiation and temperature w</span><span>ere</span><span> obtained from various sources, including, Photovoltaic Geographical Information System (PVGIS) for Africa. From this data the study area receives a monthly average solar insolation of 6.16 kWh/</span><span>m</span><sup><span style="vertical-align:super;">2</span></sup><span>/day with the worst month </span><span>being </span><span>August with 5.22 kWh/</span><span>m</span><sup><span style="vertical-align:super;">2</span></sup><span>/day. The total daily electrical energy consumption is estimated to be about 72.525 kWh. Simulation results using HOMER software shows that the overall capital cost of the PV system components is $122,337, a replacement cost of $12,889 and an operation and maintenance cost of $29,946 over 10years. A financial analysis of the system showed that the design was both viable and sustainable with low maintenance cost</span><span>.</span>
文摘S<span>everal challenges are associated </span></span><span style="font-family:"">with</span><span style="font-family:""> the development, adoption and de</span><span style="font-family:"">ployment of biogas digesters in developing countries. Amongst these challenges is a comprehensive and systematic procedure for the design of digesters suitable for rural communities. This paper proposes the Flexible Biogas Digester System (FBDS) as a viable option for rural communities in developing countries and provide</span><span style="font-family:"">s</span><span style="font-family:""> a detailed step-by-step procedure for it</span><span style="font-family:"">s</span><span style="font-family:""> design. The biogas production process is a function of the digester operating factors which may be grouped into physical, process and performance parameters. The physical design parameters include</span><span style="font-family:""> </span><span style="font-family:"">the digester volume, the volume of the biogas storage tank, and the volume of the installation pit. The process parameters include total solid content of the slurry (TS), organic loading rate (OLR), digester operating temperatures, pH of the slurry inside the digester. The performance parameters include</span><span style="font-family:""> </span><span style="font-family:"">biogas production rate, biogas productivity and biogas quality. The Net Present Value and the Levelised Cost of Energy are presented for simple economic evaluation of the FBDS.
基金The authors acknowledge the support of the H2020 pro-gram for Solar-ERANET funding of the BOBTANDEM(2019-2022).
文摘The current climate and energy crisis urgently needs solar cells with efficiencies above the 29% single junction efficiency bottleneck.Silicon/perovskite tandem solar cells are a solution,which is attracting much attention.While silicon/perovskite tandem cells in 2-terminal and 4-terminal configurations are well documented,the three-terminal concept is still in its infancy.It has significant advantages under low light intensities as opposed to concentrated sunlight,which is the critical factor in designing tandem solar cells for low-cost terrestrial applications.This study pre-sents novel studies of the sub-cell performance of the first three-terminal perovskite/silicon selective band offset barrier tandem solar cells fabricated in an ongoing research project.This study focuses on short circuit current and operating voltages of the subcells under light intensities of one sun and below.Lifetime studies show that the perovskite bulk carrier lifetime is insensitive to illumination,while the silicon cell's lifetime decreases with decreasing light intensity.The combination of perovskite and silicon in the 3T perovskite-silicon tandem therefore reduces the sensitivity of V_(OC) to light intensity and maintains a relatively higher V_(OC) down to low light intensities,whereas silicon single-junction cells show a marked decrease.This technological advantage is proposed as a novel advantage of three-terminal perovkite/silicon solar cells for low light intensities of one sun or less.