期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Combination Operation for Neutral Point of 35 kV Power Grids in Mountainous Area 被引量:2
1
作者 YUAN Tao SIMA Wen-xia +1 位作者 RAN Rui ZHU Wei 《高电压技术》 EI CAS CSCD 北大核心 2008年第12期2626-2630,共5页
Based on a lot of measurement and analysis,this paper find that the unbalanced nature of 35 kV grids due to unsymmetrical capacitance values gives difficulty in neutral point operation in mountainous area.Improving co... Based on a lot of measurement and analysis,this paper find that the unbalanced nature of 35 kV grids due to unsymmetrical capacitance values gives difficulty in neutral point operation in mountainous area.Improving compensation of Petersen coil can rectify imbalance of voltage but bring up new problem that Petersen coil can not extinguish grounding arc effectively in fault.To put down contradiction mentioned above,this paper proposes a combination operation for neutral point of 35 kV grids as neutral point insulated in routine operation and grounding through Petersen coil in fault,then EMTP simulation is carried out.Simulation indicates that new neutral operation method can improve lightning withstand level and decrease trip-out rate of grids. 展开更多
关键词 山区 补偿电网 消弧线圈 投切运行 暂态分析
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部