The utilization of arsenic-containing gold dressing tailings is an urgent issue faced by gold production companies worldwide.The thermodynamic analysis results indicate that ferrous arsenate(FeAsO_(4)),pyrite(FeS_(2))...The utilization of arsenic-containing gold dressing tailings is an urgent issue faced by gold production companies worldwide.The thermodynamic analysis results indicate that ferrous arsenate(FeAsO_(4)),pyrite(FeS_(2))and sodium cyanide(NaCN)in the arsenic-containing gold metallurgical tailings can be effectively removed using straight grate process,and the removal of pyrite and sodium cyanide is basically completed during the preheating stage,while the removal of ferrous arsenate requires the roasting stage.The pellets undergo a transformation from magnetite to hematite during the preheating process,and are solidified through micro-crystalline bonding and high-temperature recrystallization of hematite(Fe_(2)O_(3))during the roasting process.Ultimately,pellets with removal rates of 80.77% for arsenic,88.78% for sulfur,and 99.88% for cyanide are obtained,as well as the iron content is 61.1% and the compressive strength is 3071 N,meeting the requirements for blast furnace burden.This study provides an industrially feasible method for treating arsenic-containing gold smelting tailings,benefiting gold production enterprises.展开更多
With increasingly stringent environmental protection policies,cost-effective and value-added treatment of massive lead-zinc waste rock(LZWR)generated from the preconcentration process has attracted substantial attenti...With increasingly stringent environmental protection policies,cost-effective and value-added treatment of massive lead-zinc waste rock(LZWR)generated from the preconcentration process has attracted substantial attention.A type of dolomitic LZWR with 18 wt.%MgO,27 wt.%CaO,0.29 wt.%Zn and 1.43 wt.%S was used as a replacement flux in the iron ore sintering process.Traditional sinter pot tests were carried out based on an industrial ore blend.The results show that replacing 0%-60%of dolomite with LZWR does not adversely affect the sintering productivity,fuel consumption rate,and the quality of the sinter products,while the Zn and S elements contained in LZWR can be effectively removed with the residual Zn and S contents of the resultant sinter products being less than 0.02 and 0.055 wt.%,respectively.However,substituting LZWR for dolomite as a flux inevitably increases the SO_(2) concentration in the sintering flue gas due to its high sulfur content.Considering the processing capacity of the sintering flue gas desulfurization system,the replacement ratio of dolomite can reach 40%,equal to LZWR consumption of 24.3 kg per ton of sinter.The SO_(2) in sintering flue gas can be recovered to produce(NH_(4))_(2)SO_(4) or HSO_(4),while the volatilized Zn collected into the zinc-containing dust can be subsequently recycled by the rotary hearth furnace process.Therefore,it is technologically and economically feasible to use the LZWR as a replacement flux in the iron ore sintering process,providing a new way for the safe,large-scale and low-cost treatment of LZWR.展开更多
基金Project(52274343)supported by the National Natural Science Foundation of ChinaProjects(2023YFC3903900,2023YFC3903904)supported by the National Key R&D Program of China。
文摘The utilization of arsenic-containing gold dressing tailings is an urgent issue faced by gold production companies worldwide.The thermodynamic analysis results indicate that ferrous arsenate(FeAsO_(4)),pyrite(FeS_(2))and sodium cyanide(NaCN)in the arsenic-containing gold metallurgical tailings can be effectively removed using straight grate process,and the removal of pyrite and sodium cyanide is basically completed during the preheating stage,while the removal of ferrous arsenate requires the roasting stage.The pellets undergo a transformation from magnetite to hematite during the preheating process,and are solidified through micro-crystalline bonding and high-temperature recrystallization of hematite(Fe_(2)O_(3))during the roasting process.Ultimately,pellets with removal rates of 80.77% for arsenic,88.78% for sulfur,and 99.88% for cyanide are obtained,as well as the iron content is 61.1% and the compressive strength is 3071 N,meeting the requirements for blast furnace burden.This study provides an industrially feasible method for treating arsenic-containing gold smelting tailings,benefiting gold production enterprises.
基金This work was supported by the National Natural Science Foundation of China(Grant Number 52004339)Hunan Provincial Key Research and Development Project(Grant Number 2022SK2075).
文摘With increasingly stringent environmental protection policies,cost-effective and value-added treatment of massive lead-zinc waste rock(LZWR)generated from the preconcentration process has attracted substantial attention.A type of dolomitic LZWR with 18 wt.%MgO,27 wt.%CaO,0.29 wt.%Zn and 1.43 wt.%S was used as a replacement flux in the iron ore sintering process.Traditional sinter pot tests were carried out based on an industrial ore blend.The results show that replacing 0%-60%of dolomite with LZWR does not adversely affect the sintering productivity,fuel consumption rate,and the quality of the sinter products,while the Zn and S elements contained in LZWR can be effectively removed with the residual Zn and S contents of the resultant sinter products being less than 0.02 and 0.055 wt.%,respectively.However,substituting LZWR for dolomite as a flux inevitably increases the SO_(2) concentration in the sintering flue gas due to its high sulfur content.Considering the processing capacity of the sintering flue gas desulfurization system,the replacement ratio of dolomite can reach 40%,equal to LZWR consumption of 24.3 kg per ton of sinter.The SO_(2) in sintering flue gas can be recovered to produce(NH_(4))_(2)SO_(4) or HSO_(4),while the volatilized Zn collected into the zinc-containing dust can be subsequently recycled by the rotary hearth furnace process.Therefore,it is technologically and economically feasible to use the LZWR as a replacement flux in the iron ore sintering process,providing a new way for the safe,large-scale and low-cost treatment of LZWR.