期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Design and Construction HSL Immersed Tunnels in Holland
1
作者 E. van Hulten BSc. H. Cregten 《现代隧道技术》 EI 2004年第z2期164-167,共4页
Currently, two immersed tunnels are being constructed in Holland as part of a high speed railway link. Designing and building these two tunnels was a challenge due to a combination of factors: Technical specifications... Currently, two immersed tunnels are being constructed in Holland as part of a high speed railway link. Designing and building these two tunnels was a challenge due to a combination of factors: Technical specifications with small tolerances, which are never encountered before in Holland, poor soil conditions and a short construction period had to be managed.Some major aspects will be explained in this paper. 展开更多
下载PDF
Material Research Related to Structural Pavement Failure on Motorway A32 in the Netherlands
2
作者 HOUBEN L J M MOLENAAR A A A ERKENS S M J G 《武汉理工大学学报》 CAS CSCD 北大核心 2010年第17期8-17,共10页
In 2008 structural failures occurred on the asphalt pavement,with a hydraulic blast furnace slag base,of the motorway A32 (constructed in 1986~1988) in the Netherlands. Within a few weeks serious depressions occurred... In 2008 structural failures occurred on the asphalt pavement,with a hydraulic blast furnace slag base,of the motorway A32 (constructed in 1986~1988) in the Netherlands. Within a few weeks serious depressions occurred,in which the asphalt pavement was full of cracks and the base had a very low stiffness. In 2008 and 2009 the pavement including the base was rehabilitated over a length of 10 km.The Dutch Ministry of Public Works has initiated an extensive research into the risks of occurrence of this type of unexpected structural damages on the main road network in the Netherlands. Among many other things this research includes material research into the base material of the A32 to find the cause of the structural failure.In total 130 cores,divided over 26 cross-sections,were drilled from the A32. The cross-sections were divided over 3 areas,with a high and low base stiffness respectively and also at heaves that had grown into the pavement since 1998. In areas with high base stiffness the cores mainly contained bound base material,in areas with low base stiffness mainly granular material and at the heaves it was a mix thereof. Standard (static) and dynamic crushing tests were done on the granular material. Dynamic and monotonic indirect tensile tests and compression tests were performed on the bound material. In all cases no systematic difference was found between the mechanical properties of the blast furnace slag base material from the heavily loaded right traffic lane and the material from the other locations.It is concluded that the pavement failure on the A32 is introduced by the occurrence of full depth asphalt fatigue cracks in the pavement that was originally designed for 12 years (but was never strengthened) in areas where the base stiffness always has been low or became low through crushing (that also has resulted in the heaves). Penetrated rainwater then has weakened the base and pumping has occurred,resulting into loss of bearing capacity and decrease of volume. 展开更多
关键词 structural failure blast furnace slags base laboratory testing
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部