Optimization of project payment schedules with Nash equilibrium model and genetic algorithm 被引量:1
1
作者 DENG Ze-min GAO Chun-ping LI Zhong-xue 《Journal of Chongqing University》 CAS 2007年第2期107-112,共6页
To minimize the deviations of the net present values of project payment for both the owner and the client and optimize project payment schedules, a Nash equilibrium model based on game theory was set up and a genetic ... To minimize the deviations of the net present values of project payment for both the owner and the client and optimize project payment schedules, a Nash equilibrium model based on game theory was set up and a genetic algorithm was developed to work out the Nash equilibrium solution with a two-stage backward inductive approach that requires the client responds to the owner’s payment schedule with an activity schedule so as to maximize the client’s net present value of cash flows. A case study demonstrated that a payment schedule at the Nash equilibrium position enables both the owner and the client to gain their desirable interests, thus is a win-win solution for both parties. Despite the computation time of the proposed algrithm in need of improving, combining Nash equilibrium and genetic algorithm into a complete-information dynamic-game model is a promising method for project management optimization. 展开更多
关键词 project management payment scheduling game theory genetic algorithm
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部