期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Divergence structure of the statistical entropy of the Dirac field in a plane symmetry black hole geometry 被引量:3
1
作者 李固强 《Chinese Physics B》 SCIE EI CAS CSCD 2005年第3期468-471,共4页
下载PDF
A NEW CONCEPT TOWARD INDUSTRIALIZATION OF Cu-Ⅲ-Ⅳ2 THIN FILM SOLAR CELLS AND SOME PRELIMINARY EXPERIMENT RESULTS
2
作者 L.X.Shao H.L.Hwang 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2005年第3期199-203,共5页
A new concept of full vacuum manufacturing for Cu-III-IV2 thin-film solar cells has been discussed. Cu-III-IV2 thin-film solar cells manufactured using full in- line reactive sputtering will result in lower cost than ... A new concept of full vacuum manufacturing for Cu-III-IV2 thin-film solar cells has been discussed. Cu-III-IV2 thin-film solar cells manufactured using full in- line reactive sputtering will result in lower cost than that of the conventional method with CdS layer fabricated with chemical bath deposition (CBS) method. Us ing reactive sputtering process with organo- metallic gases, the compositions a nd electronic properties of Cu-III-IV2 thin-film can be fine-tuned and precisely controlled. n-type Cu-III-IV2 film and ZnS suffer layer can also be deposited u sing the in-line sputtering instead of using the CdS layer. The environmental po llution problems arising from using CdS can be eliminated and the ultimate goal of full in-line process development can then be realized. Some preliminary exper imental results on a modal solar cell fabricated by the new technique in the new concept have been presented. 展开更多
关键词 Cu-III-VI2 thin film solar cells full reactive sputtering
下载PDF
ON THE COMPLETION TIME AND THE INTERRUPTION TIME OF A JOB PROCESSED ON AN UNRELIABLE MACHINE
3
作者 YUEDequan TUFengsheng 《Journal of Systems Science & Complexity》 SCIE EI CSCD 2005年第2期202-209,共8页
This paper considers the completion time and the interruption time of a job processed on an unreliable machine. By using the general theory of stochastic orderings, we obtain the closure properties of the distribution... This paper considers the completion time and the interruption time of a job processed on an unreliable machine. By using the general theory of stochastic orderings, we obtain the closure properties of the distribution of the completion time and the interruption time on L^+ and PH life distribution classes. We get an exponential bound for the tail probability of the interruption time. 展开更多
关键词 机械工业 排队论 中断时间 完成时间 自动管理系统
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部