With the characteristics of diversity, randomness, concurrency and decomposability, tasks in manufacturing field are very complicated, and so manufacturing grid (MG) should have considerable flexibility to deal with t...With the characteristics of diversity, randomness, concurrency and decomposability, tasks in manufacturing field are very complicated, and so manufacturing grid (MG) should have considerable flexibility to deal with this problem. With the definition of node and arc, MG structure is converted into a small-world network. Given construction cost constraint, the problem of shortest task waiting time is transformed into the constrained optimization problem, and a corresponding ?exibility analysis model based on average path length (APL) is proposed, and the premise of arc-length and node-distance are defined. The results of application example show that the analysis model is effiective.展开更多
In inventory financing,asymmetric information between banks and the third party logistics enterprises may incur moral risks,often causing economic losses of banks.To effectively solve this problem,a pure incentive sch...In inventory financing,asymmetric information between banks and the third party logistics enterprises may incur moral risks,often causing economic losses of banks.To effectively solve this problem,a pure incentive scheme and a regulatory incentive scheme are designed with the principal-agent theory.By comparison,it is found that the pure incentive model is not applicable to practical conditions,and regulatory incentive model can not only solve practical problems substantially but also outbalance pure incentive model under certain conditions.The research results from example analysis given in this paper offer theoretical instruction and a practical method for effective regulation of banks.展开更多
基金supported by the National Natural Science Foundation of China (Grant No.50805089)the Science Foundation of Science and Technology Commission of Shanghai Municipality (Grant Nos.08DZ1123402,08DZ1124502)
文摘With the characteristics of diversity, randomness, concurrency and decomposability, tasks in manufacturing field are very complicated, and so manufacturing grid (MG) should have considerable flexibility to deal with this problem. With the definition of node and arc, MG structure is converted into a small-world network. Given construction cost constraint, the problem of shortest task waiting time is transformed into the constrained optimization problem, and a corresponding ?exibility analysis model based on average path length (APL) is proposed, and the premise of arc-length and node-distance are defined. The results of application example show that the analysis model is effiective.
文摘In inventory financing,asymmetric information between banks and the third party logistics enterprises may incur moral risks,often causing economic losses of banks.To effectively solve this problem,a pure incentive scheme and a regulatory incentive scheme are designed with the principal-agent theory.By comparison,it is found that the pure incentive model is not applicable to practical conditions,and regulatory incentive model can not only solve practical problems substantially but also outbalance pure incentive model under certain conditions.The research results from example analysis given in this paper offer theoretical instruction and a practical method for effective regulation of banks.