期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Waterproof of rock joint with lead strip for splitting tuff sheet in ancient China quarrying caverns 被引量:1
1
作者 YANG ZhiFa ZHANG LuQing +5 位作者 YUE ZhongQi ZHANG ZhongJian YANG TianYao LIN XianJian TAO KeJie ZHU JieWang 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第4期960-969,共10页
This paper presents the relics of rock joints caulked with lead strips, unearthed by the authors in 2007 and 2008. The relics were in ancient quarry caverns in Shepan Island, Zhejiang Province, eastern China. The quar... This paper presents the relics of rock joints caulked with lead strips, unearthed by the authors in 2007 and 2008. The relics were in ancient quarry caverns in Shepan Island, Zhejiang Province, eastern China. The quarry activities were mainly carried out for production of regular tuff stone plates about 800 years ago. Each of the lead strips was sealed into a rock joint by punching manually and carefully. At present, the lead strips still contact tightly with the rock joints and new mineral cerussite is found to have formed at the contact surfaces between the lead strip and its caulked rock joint. The use of lead strips caulking rock joints in quarry caverns is found for prevention of water from seeping out of the country rocks into quarry cavern bases, where all of the in-situ intact tuff rock was manually and near-horizontally split into thin rock sheets one by one for production of regular tuff plates. Furthermore, it is found that the tensile splitting of tuff sheets at the cavern base required the intact rocks at the cavern base had to be dry. Through this horizontal base splitting for tuff sheets from the top to the bottom, a dome-shape interior space was formed for each rock cavern with the near horizontal imprints of thin sheet layers permanently on the sidewalls. 展开更多
关键词 rock cavern lead strips SEALANT joints WATERPROOF TUFF SPLITTING QUARRY
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部