In the past,lightning strike risk assessment of buildings mainly referred to the Protection against Lightning—Part 2:Risk Management(IEC 62305-2-2010)based on protection angle method.Lightning strike risk assessment ...In the past,lightning strike risk assessment of buildings mainly referred to the Protection against Lightning—Part 2:Risk Management(IEC 62305-2-2010)based on protection angle method.Lightning strike risk assessment of wind farms was conducted according to the Lightning Protection for Wind Energy System(IEC 61400-24-2019),which proposed the method of lightning strike risk assessment for wind turbine.In fact,the basic idea of the two is the same,that is,the source of the lightning strike wind turbine is transformed from the former S1-S4 to the latter N D-N DJ.According to the above method,wind farm was evaluated,and it has been proved that the practice can not achieve good results.After 2018,China has issued the Guide to Evaluation of Lightning Protection Technology in Buildings(T/GZLY 3-2022)and the Technical Specifications for Lightning Interception in Forest Areas(T/LYCY 4062-2024)based on semicircle protection,in which the source of risk defined by lightning point was closer to the reality,highly targeted and effective.Taking offshore wind farm as an example,this paper introduced a new method of establishing six evaluation indicators to determine the risk level according to the principle of compliance and the new protection technology of semi-circular method,which can be used as a reference for technical personnel.展开更多
基金Huadian International Group Technology Project(172JLC02300248)Research Project on Lightning Protection Technology for 35 kV Collecting Power Line of Wuxuan Qinglan Wind Farm(SFC/WXY-ZX-FW-23-008).
文摘In the past,lightning strike risk assessment of buildings mainly referred to the Protection against Lightning—Part 2:Risk Management(IEC 62305-2-2010)based on protection angle method.Lightning strike risk assessment of wind farms was conducted according to the Lightning Protection for Wind Energy System(IEC 61400-24-2019),which proposed the method of lightning strike risk assessment for wind turbine.In fact,the basic idea of the two is the same,that is,the source of the lightning strike wind turbine is transformed from the former S1-S4 to the latter N D-N DJ.According to the above method,wind farm was evaluated,and it has been proved that the practice can not achieve good results.After 2018,China has issued the Guide to Evaluation of Lightning Protection Technology in Buildings(T/GZLY 3-2022)and the Technical Specifications for Lightning Interception in Forest Areas(T/LYCY 4062-2024)based on semicircle protection,in which the source of risk defined by lightning point was closer to the reality,highly targeted and effective.Taking offshore wind farm as an example,this paper introduced a new method of establishing six evaluation indicators to determine the risk level according to the principle of compliance and the new protection technology of semi-circular method,which can be used as a reference for technical personnel.