As the unit No. 1 of Wangtan Power Plant, Hebei Datang International, completed 168-hour trial operation successively and was delivered to operation on December 7^th, 2005, the power installed capacity of China Datang...As the unit No. 1 of Wangtan Power Plant, Hebei Datang International, completed 168-hour trial operation successively and was delivered to operation on December 7^th, 2005, the power installed capacity of China Datang Corporation (CDT) reached 40.2496 GW. It indicated CDT, of which the installed capacity breaks 40 GW level, had become the second power generation group in China. In the meantime, it has also been the power generation group with most power units commissioned at a fastest speed since three years of power institutional reform. The yearly commissioned capacity reached 13.6406 GW.展开更多
文摘As the unit No. 1 of Wangtan Power Plant, Hebei Datang International, completed 168-hour trial operation successively and was delivered to operation on December 7^th, 2005, the power installed capacity of China Datang Corporation (CDT) reached 40.2496 GW. It indicated CDT, of which the installed capacity breaks 40 GW level, had become the second power generation group in China. In the meantime, it has also been the power generation group with most power units commissioned at a fastest speed since three years of power institutional reform. The yearly commissioned capacity reached 13.6406 GW.