期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A Study on the Testing Procedures of IEC 61850 Based Transformer Protective lED
1
作者 N.H. Lee B.T. Jang Y.H. Kim Y.H. An J.Y. Han E.B. Shim 《Journal of Energy and Power Engineering》 2010年第11期58-62,共5页
Korea Electric Power Corporation in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is performing the verification of perf... Korea Electric Power Corporation in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is performing the verification of performance of the substation automation system based on IEC 61850. In order to verify a transformer protective lED that might be operating in substation automation system, the new standardized document and procedures are required in the aspect of the utility like KEPCO. But there is nothing to describe systematically how to verify IEC 6 1850 based lED in the system environment except an individual IED testing way. This paper will present the substation automation system based ways and procedures to verify the protective function of the IED using UML (Unified Modeling Language). 展开更多
关键词 IED conformance testing IEC61850 substation automation testing procedure.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部