期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Demolition technique of high thin-wall hyperbolic reinforced concrete cool tower by directional controlled blasting 被引量:1
1
作者 Luo Yong Cui Xiaorong Lu Hua 《Engineering Sciences》 EI 2008年第4期40-45,共6页
Based on blasting demolition of high thin-wall hyperbolic reinforced concrete cool tower, by virtue of engineering practice of blasting the tube concrete structures, the analysis and research were made on the mechanis... Based on blasting demolition of high thin-wall hyperbolic reinforced concrete cool tower, by virtue of engineering practice of blasting the tube concrete structures, the analysis and research were made on the mechanism of cool tower collapse through selecting blasting parameters and selecting gap form, gap size and gap angle. The cool tower was twisted, collapsed directionally and broken well according to the design requirements. The expected results and purposes of blasting were obtained with no back blow, total blasted pile approximates to 4 - 5 m, no occurrence of flying stones and no damage to fixed buildings and equipment, the large-sized hyperbolic thin-wall reinforced concrete cool towers are twisted during blasting and it collapses well with good breaking. The test and measurement of blasting vibrating velocity was carried out during blasting and the measuring results are much less than critical values specified by Safety Regulations for Blasting. The study shows that gap form, gap size and gap angle are the key factors to cool tower collapse and will give beneficial references to related theoretical study and field application. 展开更多
关键词 cool tower blasting demolition directional blasting gap
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部