According to the chloride corrosion environment,service life prediction model of concrete structure of sea-crossing bridge was built using modified Fick's second law and the whole probability calculation method,wh...According to the chloride corrosion environment,service life prediction model of concrete structure of sea-crossing bridge was built using modified Fick's second law and the whole probability calculation method,which was suitable for China. Furthermore,a visual service life prediction program of concrete structure was developed by optimized Monte Carlo method. Meanwhile,Life 365 program was compared,indicating reliability of the prediction program. Finally,the validity of prediction model was verified in JinTang Bridge of Zhoushan Island Mainland Linkage Project.展开更多
To improve the quality of the steel-concrete composite segment of the box girder,to ensure the compactness of concrete to avoid debonding and to enhance the fatigue strength of concrete are critical to the concrete pr...To improve the quality of the steel-concrete composite segment of the box girder,to ensure the compactness of concrete to avoid debonding and to enhance the fatigue strength of concrete are critical to the concrete preparation for such site. Furthermore,the coordination ability to deformation between steel and concrete is also important because of great difference of the elastic modulus between them. Concrete for the steel-concrete composite segment with high fluidity,excellent crack resistance and low shrinkage was prepared by adding efficient poly-carboxylic water-reducing agent,high quality fly ash and expansion agent to it. The quality of the concrete of the half partial testing block showed that the optimal mix proportion of polypropylene fiber reinforced concrete had achieved expected effect,ensured high quality,thus meeting the requirements of construction.展开更多
文摘According to the chloride corrosion environment,service life prediction model of concrete structure of sea-crossing bridge was built using modified Fick's second law and the whole probability calculation method,which was suitable for China. Furthermore,a visual service life prediction program of concrete structure was developed by optimized Monte Carlo method. Meanwhile,Life 365 program was compared,indicating reliability of the prediction program. Finally,the validity of prediction model was verified in JinTang Bridge of Zhoushan Island Mainland Linkage Project.
文摘To improve the quality of the steel-concrete composite segment of the box girder,to ensure the compactness of concrete to avoid debonding and to enhance the fatigue strength of concrete are critical to the concrete preparation for such site. Furthermore,the coordination ability to deformation between steel and concrete is also important because of great difference of the elastic modulus between them. Concrete for the steel-concrete composite segment with high fluidity,excellent crack resistance and low shrinkage was prepared by adding efficient poly-carboxylic water-reducing agent,high quality fly ash and expansion agent to it. The quality of the concrete of the half partial testing block showed that the optimal mix proportion of polypropylene fiber reinforced concrete had achieved expected effect,ensured high quality,thus meeting the requirements of construction.