期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
The Procedure for Assembling the EAST Tokamak
1
作者 武松涛 《Plasma Science and Technology》 SCIE EI CAS CSCD 2005年第4期2893-2896,共4页
Due to the complicated constitution and high precision requirements of the EAST superconducting tokamak, a meticulous assembling procedure and measurement scheme must be established. The big size and mass of the EAST ... Due to the complicated constitution and high precision requirements of the EAST superconducting tokamak, a meticulous assembling procedure and measurement scheme must be established. The big size and mass of the EAST machine's components and complicated configuration with tight installation tolerances call for a highly careful assembling procedure. The assembling procedure consists of three main sub-procedures for the assembling of the base, of the tori of the VV, the vacuum vessel TS and the TF, and of the peripheral parts respectively. Before the assembly, a reference framework has been set up by means of an industrial measurement system with reference fiducial targets fixed on the wall of the test hall. In this paper, the assembling procedure is described in detail, the survey control system of the assembly is discussed, and progress in the assembly work is also reported. 展开更多
关键词 superconducting tokamak ASSEMBLY EAST
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部